25 research outputs found
Recommended from our members
Field-independent normalization of SSC Collider Ring costs
The SSC Collider Ring represents the dominating cost element of the SSC project. The number of variables involved in optimizing the facility is very large so it is helpful to try to parameterize them in a way that allows a straightforward comparison of primary options. Cost information has been drawn from the Reference Designs Study supplemented by data from studies carried out by the Harza Engineering Company in Illinois. Various studies indicate that a 9' to 10' tunnel seems optimal from a construction and operation viewpoint and is adequate for installation. According to both studies cited a tunnel of this size in reasonable geology will cost approximately $800 per linear foot. For the purposes of this analysis this is adopted as the standard tunnel
Recommended from our members
Observations on LEP with a view to SSC
From 24-29 October 1984 a visit was made to the LEP project at CERN with a view to extracting from the LEP planning and experience what might be useful in planning an SSC. With a circumference of 26.7 km, in a reasonably densely-populated area outside the boundaries of the CERN site, LEP already faces most of the problems of environment, public relations, maintenance and operation that will be faced by an SSC project. Information is presented under the headings of: (1) radiation protection; (2) heating, ventilation, and airconditioning; (3) electrical power distribution; (4) LEP experiments/UA1, UA2; (5) civil; (6) infrastructure installation; (7) survey; (8) safety; and (9) LEP controls. Each report lists the CERN individuals who generously provided their insights and help
An introduction to radiation protection for the Superconducting Super Collider
This is an informal guide to understanding radiation, the ways in which the SSC can produce radiation, and the techniques used to shield the public from that radiation