2 research outputs found
Recommended from our members
Electron beam size measurements in the Fermilab Electron Cooling System
The Fermilab Electron Cooling Project requires a straight trajectory and constant beam size to provide maximum cooling of the antiprotons in the Recycler. A measurement system was developed using movable apertures and steering bumps to measure the beam size in a 20m long, nearly continuous, solenoid. This paper will focus on results of these measurements of the beam size and the difficulties in making those measurements
Beam instrumentation for the Tevatron Collider
The Tevatron in Collider Run II (2001-present) is operating with six times
more bunches and many times higher beam intensities and luminosities than in
Run I (1992-1995). Beam diagnostics were crucial for the machine start-up and
the never-ending luminosity upgrade campaign. We present the overall picture of
the Tevatron diagnostics development for Run II, outline machine needs for new
instrumentation, present several notable examples that led to Tevatron
performance improvements, and discuss the lessons for future colliders