5 research outputs found

    Development of an advanced SiPM camera for the Large Size Telescope of the Cherenkov TelescopeArray Observatory

    Get PDF
    Silicon photomultipliers (SiPMs) have become the baseline choice for cameras of the small-sized telescopes (SSTs) of the Cherenkov Telescope Array (CTA). On the other hand, SiPMs are relatively new to the field and covering large surfaces and operating at high data rates still are challenges to outperform photomultipliers (PMTs). The higher sensitivity in the near infra-red and longer signals compared to PMTs result in higher night sky background rate for SiPMs. However, the robustness of the SiPMs represents a unique opportunity to ensure long-term operation with low maintenance and better duty cycle than PMTs. The proposed camera for large size telescopes will feature 0.05 degree pixels, low power and fast front-end electronics and a fully digital readout. In this work, we present the status of dedicated simulations and data analysis for the performance estimation. The design features and the different strategies identified, so far, to tackle the demanding requirements and the improved performance are described

    First follow-up of transient events with the CTA Large Size Telescope prototype

    Get PDF
    The recent detection of a very high energy (VHE) emission from Gamma-Ray Bursts (GRBs) above 100 GeV performed by the MAGIC and H.E.S.S. collaborations, has represented a significant, long-awaited result for the VHE astrophysics community. Although these results’ scientific impact has not yet been fully exploited, the possibility to detect VHE gamma-ray signals from GRBs has always been considered crucial for clarifying the poorly known physics of these objects. Furthermore, the discovery of high-energy neutrinos and gravitational waves associated with astrophysical sources have definitively opened the era of multi-messenger astrophysics, providing unique insights into the physics of extreme cosmic accelerators. In the near future, the Cherenkov Telescope Array (CTA) will play a major role in these observations. Within this framework, the Large Size Telescopes (LSTs) will be the instruments best suited to significantly impact on short time-scale transients follow-up thanks to their fast slewing and large effective area. The observations of the early emission phase of a wide range of transient events with good sensitivity below 100 GeV will allow us to open new opportunities for time-domain astrophysics in an energy range not affected by selective absorption processes typical of other wavelengths. In this contribution, we will report about the observational program and first transients follow-up observations performed by the LST-1 telescope currently in its commissioning phase on La Palma, Canary Islands, the CTA northern hemisphere site

    Commissioning of the camera of the first Large Size Telescope of the Cherenkov Telescope Array

    Get PDF
    The first Large Size Telescope (LST-1) of the Cherenkov Telescope Array has been operational since October 2018 at La Palma, Spain. We report on the results obtained during the camera commissioning. The noise level of the readout is determined as a 0.2 p.e. level. The gain of PMTs are well equalized within 2% variation, using the calibration flash system. The eect of the night sky background on the signal readout noise as well as the PMT gain estimation are also well evaluated. Trigger thresholds are optimized for the lowest possible gamma-ray energy threshold and the trigger distribution synchronization has been achieved within 1 ns precision. Automatic rate control realizes the stable observation with 1.5% rate variation over 3 hours. The performance of the novel DAQ system demonstrates a less than 10% dead time for 15 kHz trigger rate even with sophisticated online data correction

    Cross-calibration and combined analysis of the CTA-LST prototype and the MAGIC telescopes

    Get PDF
    The Cherenkov Telescope Array (CTA) is the next-generation gamma-ray observatory that is expected to reach one order of magnitude better sensitivity than that of current telescope arrays. The Large-Sized Telescopes (LSTs) have an essential role in extending the energy range down to 20 GeV. The prototype LST (LST-1) proposed for CTA was built in La Palma, the northern site of CTA, in 2018. LST-1 is currently in its commissioning phase and moving towards scientific observations. The LST-1 camera consists of 1855 photomultiplier tubes (PMTs) which are sensitive to Cherenkov light. PMT signals are recorded as waveforms sampled at 1 GHz rate with Domino Ring Sampler version 4 (DRS4) chips. Fast sampling is essential to achieve a low energy threshold by minimizing the integration of background light from the night sky. Absolute charge calibration can be performed by the so-called F-factor method, which allows calibration constants to be monitored even during observations. A calibration pipeline of the camera readout has been developed as part of the LST analysis chain. The pipeline performs DRS4 pedestal and timing corrections, as well as the extraction and calibration of charge and time of pulses for subsequent higher-level analysis. The performance of each calibration step is examined, and especially charge and time resolution of the camera readout are evaluated and compared to CTA requirements. We report on the current status of the calibration pipeline, including the performance of each step through to signal reconstruction, and the consistency with Monte Carlo simulation

    Monitoring the pointing of the Large Size Telescope prototype using star reconstruction in the Cherenkov camera

    No full text
    The first Large-Sized Telescope (LST-1) proposed for the forthcoming Cherenkov Telescope Array (CTA) has started to operate in 2019 in La Palma. The large structure of LST-1 - with a 23 m mirror dish diameter - imposes a strict control of its deformations that could affect the pointing accuracy and its overall performance. According to CTA specifications that are conceived to resolve e.g. the fine structure of galactic sources, the LST post-calibration pointing accuracy should be better than 14 arcseconds. To fulfill this requirement, the telescope pointing precision is monitored with two dedicated CCD cameras located at the dish center. The analysis of their images allows us to disentangle different systematic deformations of the structure. In this work, we investigate a complementary approach that offers the possibility to monitor the pointing of the telescope during the acquisition of sky data. After properly cleaning the events from the Cherenkov showers, the reconstructed positions of the stars imaged in the camera field of view are compared to their nominal expected positions in catalogues. This provides a direct measurement of the telescope pointing, that can be used to cross-check the other methods and as a real-time monitoring of the optical properties of the telescope and of the pointing corrections applied by the bending models. Additionally, this method benefits from not relying on specific hardware or dedicated observations. In this contribution we will illustrate this analysis and show results based on simulations of LST-1
    corecore