635 research outputs found

    On the impact of transport model errors for the estimation of CO2 surface fluxes from GOSAT observations

    Get PDF
    A series of observing system simulation experiments is presented in which column averaged dry air mole fractions of CO2 (XCO2) from the Greenhouse gases Observing SATellite (GOSAT) are made consistent or not with the transport model embedded in a flux inversion system. The GOSAT observations improve the random errors of the surface carbon budget despite the inconsistency. However, we find biases in the inferred surface CO2 budget of a few hundred MtC/a at the subcontinental scale, that are caused by differences of only a few tenths of a ppm between the simulations of the individual XCO2 soundings. The accuracy and precision of the inverted fluxes are little sensitive to an 8-fold reduction in the data density. This issue is critical for any future satellite constellation to monitor XCO2 and should be pragmatically addressed by explicitly accounting for transport errors in flux inversion systems

    Proteome dynamics during postnatal mouse corpus callosum development.

    Get PDF
    Formation of cortical connections requires the precise coordination of numerous discrete phases. This is particularly significant with regard to the corpus callosum, whose development undergoes several dynamic stages including the crossing of axon projections, elimination of exuberant projections, and myelination of established tracts. To comprehensively characterize the molecular events in this dynamic process, we set to determine the distinct temporal expression of proteins regulating the formation of the corpus callosum and their respective developmental functions. Mass spectrometry-based proteomic profiling was performed on early postnatal mouse corpus callosi, for which limited evidence has been obtained previously, using stable isotope of labeled amino acids in mammals (SILAM). The analyzed corpus callosi had distinct proteomic profiles depending on age, indicating rapid progression of specific molecular events during this period. The proteomic profiles were then segregated into five separate clusters, each with distinct trajectories relevant to their intended developmental functions. Our analysis both confirms many previously-identified proteins in aspects of corpus callosum development, and identifies new candidates in understudied areas of development including callosal axon refinement. We present a valuable resource for identifying new proteins integral to corpus callosum development that will provide new insights into the development and diseases afflicting this structure

    VUV photon induced fluorescence study of SF5CF3

    Get PDF
    The interaction of SF5_5CF3_3 with vacuum-UV radiation has been investigated by photon induced fluorescence spectroscopy. Total fluorescence yield and dispersed fluorescence spectra of SF5_5CF3_3 were recorded in the 200-1000 nm fluorescence window. In all cases, the fluorescence spectra resemble those of CF3_3X (X=H, F, Cl, and Br) molecules. At photon energies below 20 eV, the emission is attributed to the excited CF3_3 and CF2_2 fragments. The threshold for the CF3_3 emission is 10.2 Β± 0.2 eV, giving an upper-limit estimate for the SF5_5-CF3_3 bond dissociation energy of 3.9 Β± 0.3 eV. The excitation functions of the CF3 and CF2 emissions were measured in the photon energy range 13.6 – 27.0 eV. The resonant structures observed in SF5_5CF3_3 are attributed to electronic transitions from valence to Rydberg orbitals, following similar assignments in CF3_3X molecules. The photoabsorption spectrum of SF5_5CF3_3 shows features at the same energies, indicating a strong contribution from Rydberg excitations

    Demonstrating Discreteness and Collision Error in Cosmological N-body Simulations of Dark Matter Gravitational Clustering

    Full text link
    Two-body scattering and other discreteness effects are unimportant in cosmological gravitational clustering in most scenarios, since the dark matter has a small particle mass. The collective field should determine evolution: Two-body scattering in simulations violates the Poisson-Vlasov equations. We test this in PM, P3^3M, Tree, and NGPM codes, noting that a collisionless code will preserve the one-dimensional character of plane wave collapse. We find collisionality vanishing as the softening parameter approaches the mean interparticle separation. Solutions for the problem are suggested, involving greater computer power, PM-based nested grid codes, and a more conservative approach to resolution claims.Comment: Final version accepted for ApJ Letters. Minor revisions, including due to bug fix in tree code. Uses aasms4.sty. 15 pages. Higher resolution figures available at ftp://kusmos.phsx.ukans.edu/preprints/discret

    First principles study of the adsorption of C60 on Si(111)

    Full text link
    The adsorption of C60 on Si(111) has been studied by means of first-principles density functional calculations. A 2x2 adatom surface reconstruction was used to simulate the terraces of the 7x7 reconstruction. The structure of several possible adsorption configurations was optimized using the ab initio atomic forces, finding good candidates for two different adsorption states observed experimentally. While the C60 molecule remains closely spherical, the silicon substrate appears quite soft, especially the adatoms, which move substantially to form extra C-Si bonds, at the expense of breaking Si-Si bonds. The structural relaxation has a much larger effect on the adsorption energies, which strongly depend on the adsorption configuration, than on the charge transfer.Comment: 4 pages with 3 postscript figures, to appear in Surf. Science. (proceedings of the European Conference on Surface Science ECOSS-19, Sept 2000

    Measuring our universe from galaxy redshift surveys

    Get PDF
    Galaxy redshift surveys have achieved significant progress over the last couple of decades. Those surveys tell us in the most straightforward way what our local universe looks like. While the galaxy distribution traces the bright side of the universe, detailed quantitative analyses of the data have even revealed the dark side of the universe dominated by non-baryonic dark matter as well as more mysterious dark energy (or Einstein's cosmological constant). We describe several methodologies of using galaxy redshift surveys as cosmological probes, and then summarize the recent results from the existing surveys. Finally we present our views on the future of redshift surveys in the era of Precision Cosmology.Comment: 82 pages, 31 figures, invited review article published in Living Reviews in Relativity, http://www.livingreviews.org/lrr-2004-

    Expedition 302 summary

    Full text link
    The first scientific drilling expedition to the central Arctic Ocean was completed in September 2004. Integrated Ocean Drilling Program Expedition 302, Arctic Coring Expedition (ACEX), recovered sediment cores to 428 meters below seafloor (mbsf) in water depths of ~1300 m, 250 km from the North Pole.Expedition 302's destination was the Lomonosov Ridge, hypothesized to be a sliver of continental crust that broke away from the Eurasian plate at ~56 Ma. As the ridge moved northward and subsided, marine sedimentation occurred and continues to the present, resulting in what was anticipated from seismic data to be a continuous paleoceanographic record. The elevation of the ridge above the surrounding abyssal plains (~3 km) ensured that sediments atop the ridge were free of turbidites. The primary scientific objective of Expedition 302 was to continuously recover this sediment record and to sample the underlying sedimentary bedrock by drilling and coring from a stationary drillship.The biggest challenge during Expedition 302 was maintaining the drillship's location while drilling and coring in 2–4 m thick sea ice that moved at speeds approaching 0.5 kt. Sea-ice cover over the Lomonosov Ridge moves with one of the two major Arctic sea-ice circulation systems, the Transpolar Drift, and responds locally to wind, tides, and currents. Until now, the high Arctic Ocean Basin, known as "mare incognitum" within the scientific community, had never before been deeply cored because of these challenging sea-ice conditions.Initial results reveal that biogenic carbonate is present only in the Holocene–Pleistocene interval. The upper 198 mbsf represents a relatively high sedimentation rate record of the past 18 m.y. and is composed of sediment with ice-rafted debris and dropstones, suggesting that ice-covered conditions extended at least this far back in time. Details of the ice type (e.g., iceberg versus sea ice), timing, and characteristics (e.g., perennial versus seasonal) await further study. A hiatus occurs at 193.13 mbsf, spanning a 25 m.y. interval from the early Miocene to the middle Eocene between ~18 Ma and 43 Ma. The sediment record during the middle Eocene is of dark, organic-rich biosiliceous composition. Isolated pebbles, interpreted as ice-rafted dropstones, are present down to 239 mbsf, well into this middle Eocene interval. Around the lower/middle Eocene boundary an abundance of Azolla spp. occurs, suggesting that a fresh and/or low-salinity surface water setting dominated the region during this time period. Although predrilling predictions based on geophysical data had placed the base of the sediment column at 50 Ma, drilling revealed that the uppermost Paleocene to lowermost Eocene boundary interval, well known as the Paleocene/Eocene Thermal Maximum (PETM), was recovered. During the PETM, the temperature of the Arctic Ocean surface waters exceeded 20Β°C.Drilling during Expedition 302 also penetrated into the underlying sedimentary bedrock, revealing a shallow-water depositional environment of Late Cretaceous age

    Methods

    Full text link
    Information assembled in this chapter will help the reader understand the basis for the preliminary conclusions of the Expedition 302 Scientists and will also enable the interested investigator to select samples for further analyses. This information concerns offshore and onshore operations and analyses described in the "Sites M0001–M0004" chapter. Methods used by various investigators for shore-based analyses of Expedition 302 samples will be described in the individual contributions published in the Expedition Research Results and in various professional journals

    Sites M0001–M0004

    Get PDF
    Operations Mobilization of Vidar Viking, Aberdeen, ScotlandThe Vidar Viking came under contract on 22 July 2004, when mobilization began in Aberdeen, Scotland. Mobilization in Aberdeen included two major installations: a moonpool and a full coring/drilling spread. By 26 July, all equipment for the Vidar Viking had arrived, including information technology equipment bound for the Oden. The derrick was load-tested and certified. The Vidar Viking took on a full complement of fuel at Aberdeen.Test Coring Site: Witch Ground, North SeaThe Vidar Viking set sail for Landskrona, Sweden, on 28 July 2004. While the ship was en route, a first test of the drilling equipment was conducted in the Witch Ground area of the North Sea, ~8 h steam from Aberdeen. A test borehole was drilled in 152 m water depth to a depth of 37 meters below seafloor (mbsf) using the British Geological Survey's (BGS's) advanced piston corer (APC) and extended core barrel. Cores were obtained with both systems. The APC recovered >4 m in all runs (maximum = 4.5 m). The Vidar Viking left the test coring site at 1900 h on 30 July and proceeded to Landskrona.Meanwhile, mobilization of the Oden proceeded at Gothenburg, Sweden, which included loading the laboratory equipment. On the evening of 31 July, the Oden set sail for TromsΓΈ, Norway.Mobilization of Vidar Viking, Landskrona, SwedenThe Vidar Viking reached Landskrona on the morning of 1 August 2004. The stern notch, a 100 ton section required by the Vidar Viking when working in ice, and the helideck were installed. The remaining containers were loaded onto the deck, including the core and European Consortium for Ocean Research Drilling Science Operator curation containers sent from Bremen, Germany. Other mobilization work continued until the morning of 3 August, when the Vidar Viking departed for TromsΓΈ.Mobilization of Vidar Viking and Oden, TromsΓΈ, NorwayThe Oden arrived in TromsΓΈ on the evening of 5 August 2004. The Vidar Viking arrived on the morning of 7 August. Two helicopters, required for ice reconnaissance missions, landed on the Oden and were secured.Rendezvous of three Expedition 302 shipsExpedition 302 officially began when the Oden left TromsΓΈ, Norway, at 2350 h on 7 August 2004. The Vidar Viking remained in TromsΓΈ for the next 12 h to wait for dynamic positioning spare parts to arrive.The Oden transited to 81Β°56'N, 44Β°59'E to meet the other two ships in the Arctic Coring Expedition (ACEX) fleet for Expedition 302, the Sovetskiy Soyuz and the Vidar Viking, at the edge of the polar ice pack on 10 August. The fleet entered the ice together with the Sovetskiy Soyuz leading, the Oden following, and the Vidar Viking bringing up the rear.Transit to first siteDuring the transit to the operational area, ice reconnaissance and personnel transfer flights began on 12 August 2004. The fleet made unprecedented headway of 8–10 kt in sea ice.The fleet arrived on site at 2350 h on 13 August and began preparations for drilling and operations for maintaining position in sea ice.Preparations for drilling began with clearing ice from the moonpool. Once this was done, a steel skirt was deployed through and below the moonpool to protect the drill string from ice impact below the hull. Once the ice protection skirt was in place, the drill floor and iron roughneck were installed. The drill floor was ready for operations by 0900 h on 15 August.During this time, the fleet's ability to maintain station was tested by positioning the Sovetskiy Soyuz and the Oden upstream of the Vidar Viking. The initial stationkeeping tests were successful, and the Fleet Manager gave approval to start drilling operations at 1100 h on 15 August.Site operationsCores were recovered in five holes (Holes M0002A, M0003A, M0004A, M0004B, and M0004C) (Table T1). Hole M0001A was abandoned after the bottom-hole assembly (BHA) was lost. Logging was attempted in two holes and data were collected in Hole M0004B.Table T2 documents the allocation of time, broken down into (1) waiting for better ice conditions, (2) operational breakdown, and (3) drilling operations.Waiting for better ice conditions was labeled "W." If waiting on ice conditions required pulling pipe and subsequent preparations to begin drilling operations, these times were included in the W category because that time delay was caused by the "waiting for ice" situation. "Breakdown time" is defined as operational time consumed as a result of equipment or mechanical failure. The loss of a BHA, for example, regardless if caused by human error or mechanical failure, necessitated a drill string trip. If the trip time was caused by equipment failure, it was considered as breakdown time "B."Site M0001 (SP 2720 on Line AWI 91090)Site M0001 (shotpoint [SP] 2720 on Line AWI 91090) was reached at 1100 h on 15 August 2004. Later that day during drill string deployment, the high-pressure mud valve on the top drive was damaged. The valve was removed, the rest of the drill string was run, and then the broken valve was replaced. Pipe trips were slowed or stopped intermittently to allow overheated hydraulic fluid in the new drill rig to cool.By 16 August, the drill string was deployed to the seafloor and the first piston corer was deployed at 0600 h. After pumping for 30 min, pressure was not obtained and the piston corer was retrieved without having fired. Damaged seals on the piston corer were replaced. Ice conditions were marginal, and at 0900 h operations were stopped and the drill string was lifted from the seabed. Ice conditions improved by 1400 h, and operations continued. The piston corer was deployed again, and no pressure developed in the drill string. Upon retrieval, the piston corer had not fired. It was suspected that the piston corer had not latched into the BHA. The extended core barrel was then deployed but was not recovered, which indicated that the BHA was lost. At 2000 h, the drill string was tripped to the surface and the BHA and extended core barrel losses were confirmed.Beginning early on 17 August, a new BHA was assembled and lowering of the drill string began. When >800 m was deployed, the high-pressure mud valve on the swivel was damaged during pipe handling. The drill string was tripped to the surface because the operator did not want to risk leaving the drill string hanging in the water column for an unspecified period of time. After completing the pipe trip, the damage was assessed and the Oden's chief engineer was tasked with manufacturing a new valve using materials from a spare pup joint. As an interim solution, a conventional valve assembly was installed, which restricted operations so that no piston core could be deployed.Ice conditions deteriorated between 0900 and 2200 h, and the time was utilized to move the Vidar Viking to a new position (Hole M0002A). Because there were no mud valve spares, the Swedish Polar Research Secretariat began making arrangements for a Swedish Air Force C-130 airdrop of two new valve parts and one conventional valve assembly.Site M0002 (SP 2560 on Line AWI-91090)Based on a strategy developed by the ice management team, the drill string was lowered while drifting onto the location of Site M0002. By 2200 h on 18 August 2004, this strategy put the Vidar Viking within 190 m of the proposed site. The final positioning was done by icebreaking this short distance to Hole M0002A. Once on location at 0820 h, three more drill pipes were added and coring started. Because the mud valve was not yet repaired, the extended core barrel was deployed instead of the APC. A first attempt at coring was unsuccessful, but after adding more pipe and drilling another core run, some core was retrieved. The first core on deck arrived at 1335 h at a water depth of 1209 m. Drilling operations continued throughout the afternoon. The newly fabricated mud valve from the Oden arrived late in the afternoon, and preparations were made for its installation during a wireline trip. The temporary valve was replaced before more drill pipe was added for the next core run. By midnight on 19 August, a depth of 31 mbsf had been reached.Drilling and extended core barrel coring continued until 23 August (Table T1) when the Fleet Manager ordered the drill pipe to be pulled to 40 mbsf because ice conditions had deteriorated. Permission to continue drilling operations was given midday, and operations continued until 2100 h when the ice conditions forced the termination of Hole M0002A at a depth of 271.69 m.The drill string was tripped to the drill deck during the morning of 24 August. After waiting for ice conditions to change in the afternoon, a transit began at 1930 h to a position from which the Vidar Viking could drift onto location while tripping in the drill string.While we waited for improved ice conditions and operations set up for the next site continued, an air gun seismic survey was run from the Oden to tie Site M0002 to the next site (Site M0003).Site M0003 (SP 2521 on Line AWI-91090)The Vidar Viking reached the ice-drift position at 2100 h and awaited ice reconnaissance results. The iron roughneck, which had been removed to repair oil leaks, was installed after repairs; the ice protector skirt was lowered; and the drill floor was prepared. At 2300 h, the BHA and drill collars were run. At 0240 h on 25 August 2004, after 400 m of pipe had been deployed, the housing of the iron roughneck cracked and had to be removed for major repairs. Operations resumed at 1400 h using power tongs. The seafloor was reached at ~2300 h, and at 0110 h on 26 August, the first APC core was recovered from Hole M0003A (Table T1).A second APC core with a shattered liner was recovered. The third APC core became stuck in the BHA. While trying to release the corer, the wireline parted at the mechanical termination, and it was necessary to pull the string. Hole M0003A was terminated at 0440 h.The ice management team conducted ice reconnaissance surveys, reviewed options, and recommended that the fleet move to a location farther west, where a longer-term prediction of relatively good ice could be made. Once the site was selected, the ice team predicted an upstream ice position for the Vidar Viking to start to drift onto the new location. The fleet steamed to the updrift ice position, arriving at 0630 h on 27 August. During this time, wireline termination repair, APC service, and iron roughneck testing and refitting took place.Site M0004 (SP 3006 [Holes M0004A and M0004B] and 3004 [Hole M0004C] on Line AWI-91090)At 0755 h on 27 August 2004 during the pipe trip to the seafloor, the high-pressure mud valve was damaged again. The valve was removed, and the remaining string was run to 1150 m depth while the valve was repaired. At 1800 h, the Vidar Viking was on location (Hole M0004A). Once on station, the repaired mud valve was installed and the drill string was run to the seabed. At 2230 h, drilling operations in Hole M0004A commenced and the hole was advanced by washing ahead to 17 mbsf (Table T1) before a piston corer was deployed.Shortly after midnight on 28 August 2004, the APC became stuck in the BHA but was freed after ~1 h. Once on deck, the plastic liner in the core barrel was found to be shattered and 3.5 m of the core was stuck in the barrel. In light of these problems with the APCβ€”in particular, the risk of junking the hole againβ€”it was decided to switch to extended core barrel coring. Two extended core barrel cores were recovered to a depth of 30.5 mbsf followed by washing to 265 mbsf using the insert bit. This decision to wash ahead was made in order to recover sediment deeper than that recovered in Hole M0002A. By 2240 h, a depth of 265 mbsf was reached.Extended core barrel coring operations continued for the next 3 days (29–31 August), where the hole was advanced at varying rates with good to poor recovery. During this time, the drilling was very slow (e.g., 1 m/h) and recovery in many cores was zero (Cores 302-M0004A-13X through 18X). Different strategies were tried to improve the advance rate. At times, the hole was advanced by washing ahead in an attempt to make faster progress but this strategy was ultimately abandoned after it was found that the washing rate was almost the same as the coring rate. On 31 August from 0200 to 0500 h, for two coring runs in a row no core was recovered. The extended core barrel shoe was switched to a coring shoe for a third attempt at recovery. This coring run cleared a blockage in the bit as evidenced by a large drop in pump pressure. Following this core (with good recovery) and after clearing the blocked bit, core recovery and advancement improved over the next 12 h until basement was reached in Core 302-M0004A-35X. Basement penetration was difficult (8 m penetration in 12 h with low core recovery), and a decision was made at 0900 on 1 September to stop coring at a total depth of 428 mbsf and conduct logging in Hole M0004A.The logging tools were moved to the rig floor, and the tool string (Formation MicroScanner–Accelerator Porosity Sonde–Natural Gamma Ray Spectroscopy Tool–Scintillation Gamma Ray Tool [FMS-APS-NGT-SGT]) and wireline rig-up proceeded simultaneously. The run into hole commenced at 2130 h. This was done at low speed in order to allow the tools to warm up. Communication with the tool was initially established, and it was lowered to the end of the drill pipe. A computer malfunction caused a communication loss to the tools. The problem was corrected by 0200 h. The tool was powered up, and attempts were made to get the tool to pass through the BHA into the open hole. All efforts failed at the same depth (~1366 meters below rig floor [mbrf]); so, while at rest at this depth, the calipers were opened on the FMS to check whether it was free or lodged. The calipers had some movement, which indicated that the tool string was free.The landing ring for the core barrel is the narrowest section of the whole pipe string (95 mm) and lies ~6 m above the bit. All the logging tools had been checked through a landing ring dockside in Aberdeen, but there was no hole calibration ring on board that could be used as a second check. Sequentially, four more logging attempts were made. Each time, it was assumed that the logging tools were too large in diameter and the string diameter was further reduced by removing the larger diameter components. The APS bowspring was removed first, followed by the knuckle joint. Finally, only the narrowest velocity-density string was deployed, which failed to clear the bit at the same depth as the previous runs. After the fifth attempt failed, the logging time allocated had been consumed and attempts to log Hole M0004A ended at 1045 h on 2 September.After the logging gear was cleared away and the drill string was lifted out of the seabed, preparations were made to start a second hole (Hole M0004B) at the site. During preparations, the inner barrel was deployed but did not latch. After an improvised downhole hammer was deployed and worked for 2 h, a short length of core (~10 cm of mudstone), which had been partially blocking the BHA, was recovered.By 2030 h on 2 September, the Vidar Viking was at the new position for the next hole (Hole M0004B). Coring in Hole M0004B started at a depth of 10 mbsf using the extended core barrel because the APC was deemed too risky. After retrieving the first sample, the hole was washed to 20 mbsf for an in situ temperature measurement. The BGS temperature probe was lowered to the base of the hole, pushed into the sediment, and programmed to record the temperature every 5 s. The probe was left to record temperature for 40 min, after which it was retrieved. Plans to wash to a depth of 215 mbsf, core to 230 mbsf, and then wash to 250 mbsf and log were stymied by problems with drilling pressure lines/gauges freezing at –10?C. Because of these problems and the limited time left, the hole was only advanced to a depth of 220 mbsf. Temperature measurements were made at 60 and 100 mbsf.At 0000 h on 4 September, the pipe was pulled to 65 mbsf to prepare for logging. Rigging of the wireline and tool string occurred concurrently, and rig-up of both was completed by 0415 h. The tool string comprised the FMS-Borehole Compensated Sonic (BHC)-NGT-SGT; the choice of tools was such that it coul
    • …
    corecore