17 research outputs found

    Optimal Scheduling of Multiproduct Pipeline System Using MILP Continuous Approach

    Get PDF
    Part 5: Planning and Scheduling; International audience; To date, the multiproduct pipeline transportation mode has nationally and internationally considerably evolved thanks to his efficiently and effectively of transporting several products. In this paper, we focus our study on the scheduling of a multiproduct pipeline system that receives a number of petroleum products (fuels) from a single refinery source in order to be distributed to several storage and distribution centers (depots). Mixed Integer Linear Programming (MILP) continuous mathematical approach is presented to solve this problem. The sequence of injected products in the same pipeline should be carefully studied, in order to meet market demands and ensure storage autonomy of the marketable pure products in the fuels depots on the one hand and to minimize the number of interfaces; Birth zone of mixture between two products in contact and in sequential flow, which may hinder the continuous operation of the pipeline system, by the necessity of additional storage capacity for this last mixture, that is in no way marketable and requires special processing operations. This work is applied on a real case of a multiproduct pipeline that feeds the western and southwestern region of Algeria with fuels. The obtained results based on the MILP continuous approach give an optimal scheduling of the multiproduct transport system with a minimized number of interfaces. Document type: Conference objec

    A progressive hedging approach for large-scale pavement maintenance scheduling under uncertainty

    Full text link
    This study approaches a multi-stage stochastic mixed-integer programming model for the high-level complexity of large-scale pavement maintenance scheduling problems. The substance of some parameters in the mentioned problems is uncertain. Ignoring the uncertainty of these parameters in the pavement maintenance scheduling problems may lead to suboptimal solutions and unstable pavement conditions. In this study, annual budget and pavement deterioration rate are considered uncertain parameters. On the other hand, pavement agencies generally face large-scale pavement networks. The complexity of the proposed stochastic model increases exponentially with the number of network sections and scenarios. The problem is solved using the Progressive Hedging Algorithm (PHA), which is suitable for large-scale stochastic programming problems, by achieving an effective decomposition over scenarios. A modified adaptive strategy for choosing the penalty parameter value is applied that aims to improve the solution process. A pavement network including 251 sections is considered the case study for this investigation, and the current study seeks optimal maintenance scheduling over a finite analysis period. The performance of the stochastic model is compared with that of the deterministic model. The results indicate that the introduced approach is competent to address uncertainty in maintenance and rehabilitation problems
    corecore