2 research outputs found

    Deliverable D32 Core indicators for the interconnection between short and long-distance transport networks ; projet 7FP CLOSER (Connecting LOng and Short-distance networks for Efficient Transport); September 2011

    Get PDF
    The CLOSER project has been set to analyse the interfaces and interconnections between long distance transport networks and local/regional transport networks of all modes. The project is funded within the Seventh Framework Programme of the European Commission, under the topic TPT-2008.0.0.13 “New mobility/organisational schemes: interconnection between short and long-distance transport networks”. The goal of WP3 of CLOSER is to establish a set of core indicators that reflect the most crucial issues connected to interfaces between short and long-distance transport networks, both for passenger and freight transport. This includes the creation of a structured representation of these interfaces, determination of core indicators, and the assessment of usability of the core indicators. CLOSER WP3 has produced two deliverables, of which the current document is the second. The first deliverable “Interconnections between short and long-distance transport networks: Structure of interface and existing indicators” (Andersen et al., 2010) contained a review of existing indicators related to interfaces between long and short-distance freight and passenger transport.The aim of this document is to structure the interconnections between short and longdistancetransport networks. This in particular includes:- Establishment of selection criteria to choose core indicators- Selection and validation of core indicators and new indicators- Set of typologies of interfacesThe document also presents the results of the WP3 workshop arranged in Lille on May 24, 2011
    corecore