2 research outputs found

    The Roof Support Load Analysis for Pre-Driven Recovery Room Parameters Design

    No full text
    Submitted by generalized experience entry longwall into pre- driven recovery room (PDRR) in foreign and Russian mine.Submitted by research characteristic state parameters of the roof at failed entry. Give a classification of roof collapse at the entrance longwall into PDRR.On the example of longwall panel 5а-10-18 mine Raspadskaya reviewed formation process of stress-strain condition in area for PDRR. Has been modeled process of entry longwall into PDRR in the conditions of heavy roof. Determine the expected load on the anchor and standing support, installed in the PDRR. Assessed the load on the longwall shield. When calculating the loads was taken into account the following parameters: width pre-driven recovery room, number of standing support in the PDRR and especially its placement, the rate of entry longwall into PDRR

    Analysis of rock mass and anchor support elements deformations during the long-term maintenance of mine workings

    No full text
    The results of instrumental and visual assessment of near-rock massif and anchor support elements state in the conditions of long-term maintenance of mine workings has been presented. Particular attention is paid to underground mines in a flooded state. The result of various profiles fixing bolts strength tests of in the roof and sides of the workings has been presented. It has been established that the probability distribution of the anchoring bolts force in the holes in roof of the workings obeys the normal distribution tendency. The result of a radar survey of roof rocks using the Georadar OKO-2 has been analyzed. It was revealed that the height of the stratification of rocks in the mine workings roof varies from 0.2 m to 2.25 m, a comparison is made with the theoretical height of the collapse arch. The propensity of the near rock massif to water saturation has been estimated, the height of the water saturation of the roof rocks has been established. It has been established that the height of moisture depends on the arch of rock stability formed during the survey period. It has been found that water saturation of the rocks leads to a decrease in the specific cohesion of the resin capsules bonding composition with the walls of the hole by 55-67% in roof and by 72% in walls of mine workings
    corecore