301 research outputs found
A strategic perspective for managing socio-technical systems: the missing link
Most man-made systems around us are mainly socio-technical systems. As such it is imperative that to manage such systems effectively we need to understand their properties at both the micro and macro level and the holistic functioning of such systems. Such an approach is important in understanding the emergent properties that are exhibited by such system. We already have been delving into the micro level and the intricacies of the different subsystems without actually having the broader view of the whole system. This current approach came from the fact that
reductionism is the ‘mantra’ of our scientific nature and endeavours, and dictates how a problem is solved. In this paper a strategic approach is put forward, making use of the force field theory as a necessary missing component for designing and managing socio-technical systems. With
this proposed strategic approach the true understanding of solving these emergent properties will be reinforced with what we already know and also help in solving some disorder exhibited in these systems, without creating more uncertainties. This paper sets out the framework and its
usefulness to understanding the socio-technical systems around us
Enhancing the decision-making process of project managers in the built environment: An integrated approach
A study of the project manager’s (PM) function must be to examine: what their role is, their skills, and training needed. The project manager needs wide perspective regarding the classic management functions of control, coordination, communication, and the settling of performance standards. If the PM is a professional, their performance must be of the highest standard, and must be accountable for a high level of productivity. This is the project manager’s Achilles heel.
Another problem is the absence of feedback during the early stages through to completion of the project. During the project’s life the relative importance of their responsibilities may change several times, including the constant changing of the dynamic environment. The PM will aim for a balanced emphasis; they will try to be flexible so they can adapt to new circumstances as they occur. The PM needs tried and tested methods to aid his decision making. This paper posits an integrated development and use of methods such as; scenario planning, effectuation, and reflective thinking to enhance decision making. The paper concludes with potential benefits that this method brings to the PM when fully understood and tested in the application domain
Professional competency-based analysis of continuing tensions between education and training in higher education
Purpose
The education and training of construction graduates are highly influenced by the higher education institutions which produced them and the relevant professional bodies, which set the competencies that guide both academic and industrial learning. Thus, it is important to ascertain what the key stakeholders perceive construction graduates should achieve in competencies. Construction is a practice-oriented collection of professions, thus, this research focussed on the quantity surveying (QS) profession that is responsible for cost control and management of construction projects, and accredited by the Royal Institution of Chartered Surveyors. The purpose of this paper is to identify and analyse the expected level of competencies attained by QS graduates, assess the industry perception of the achievement of competencies by QS graduates, and the ranking of competencies in the order of perceived importance.
Design/methodology/approach
The study adopted three different data gathering phases to include literature review, expert forum, and two surveys – industry and academia.
Findings
The research revealed unrealistically high expectations by the construction industry of QS graduates achieving a high level of competency in ten mandatory, seven core, and seven optional competencies. The research found that there were significant levels of dissatisfaction with the expected level of achievement of mandatory, core, and optional competencies by the QS graduates. Thus, a perception gap was identified between the academia and the industry.
Practical implications
This research will provide a benchmarking tool for curricula alignment for the construction degree programmes in higher education.
Originality/value
The identification of the exact nature of industry competencies requirements and any variations will assist the construction graduates to connect more effectively to the industry. These research findings confirm the need for continued expansion of curricula and diversification of pedagogies
Competency mapping framework for regulating professionally oriented degree programmes in higher education
Recognition of the huge variation between professional graduate degree programmes and employer requirements, especially in the construction industry, necessitated a need for assessing and developing competencies that aligned with professionally oriented programmes. The purpose of this research is to develop a competency mapping framework (CMF) in this case for quantity surveying honours degree programmes. The graduate competency threshold benchmark (GCTB) is a key component of the CMF. Therefore, the CMF contains the mapping process, the template documents and the benchmark. The research adopted literature review, pilot study, case studies (including semi-structured interviews) and expert forum in developing the framework. The framework developed in this research provides new insight into how degree programmes map against competencies. Thus, the framework can be applied more widely, to other professional degree programmes, for monitoring and improving the quality and professional standards of construction degree programmes by accrediting bodies. This should connect construction graduates more effectively to the industry
Carbon and cost critical elements of buildings : a comparative analysis of two office buildings
Purpose: The aim of this paper is to identify and compare cost and carbon critical elements of two office buildings and to propose an early design stage cost and carbon control strategy to achieve an optimum balance between building Capital Cost (CC) and Embodied Carbon (EC).
Design/methodology/approach: Case study approach was employed to identify cost and carbon critical elements of two office buildings as it allows an in-depth and holistic investigation. Elemental estimates of CC and EC were prepared from BoQs of the two office buildings by obtaining rates from the UK Building Blackbook. Pareto Principle (80:20 rule) was used to identify carbon and cost critical elements of the two buildings and the significance hierarchies of building elements were compared.
Findings: Substructure, Frame and Services were identified as both carbon and cost critical elements responsible for more than 70% of the total CC and EC in both buildings. Stairs and Ramps, Internal Doors and Fittings, Furnishings and Equipment were identified to be the least carbon and cost significant elements contributing less than 2% of total CC and EC in both buildings. The hierarchy of cost and carbon significance varies between buildings due to the difference in the specification and design.
Originality/value: The increasing significance of dual currency (cost and carbon) demands cost and carbon management during the early stages of project. Hence, this paper suggests that focusing on carbon and cost intensive building elements is a way forward to keep both cost and carbon under control during the early stages of projects.
Keywords: Carbon Hotspots, Capital Cost, Cost Hotspots, Embodied Carbon, Office Buildings
Invalid party wall awards and how to avoid them
Considers the reasons for the invalidity of party wall awards. Examines decided cases under earlier party wall legislation in the context of the Party Wall etc. Act 1996. Explains invalidity on the basis of an excess of the surveyors’ statutory authority. Defines this authority in terms of jurisdiction and power. Demonstrates the limits of the surveyors’ authority and emphasises the importance of strict compliance with statutory procedures. Concludes that surveyors should adopt an inquisitive and analytical approach to the scope of their authority to avoid the possibility of invalid awards. Echoes John Anstey’s earlier warning that surveyors should avoid a broad-brush approach to their duties which will only leave them “covered in soot”
Recommended from our members
Financial viability appraisals for site-specific planning decisions in England
In England, appraisals of the financial viability of development schemes have become an integral part of planning policy-making, initially in determining the amount of planning obligations that might be obtained via legal agreements (known as Section 106 agreements) and latterly as a basis for establishing charging schedules for the Community Infrastructure Levy (CIL). Local planning authorities set these policies on an area-wide basis but ultimately development proposals require consent on a site-by-site basis. It is at this site-specific level that issues of viability are hotly contested.
This paper examines case documents, proofs of evidence and decisions from a sample of planning disputes in order to address major issues within development viability, the application of the models and the distribution of the development gain between the developer, landowner and community. The results have specific application to viability assessment in England and should impact on future policy and practice guidance in this field. They also have relevance to other countries that incorporate assessments of economic viability in their planning systems
Managing the delivery of iconic football stadiums in England
The English football premier league has become the most
popular sports league in the world; with ardent fans and
audiences all over the world. The potential business
opportunities that this growth holds have therefore
attracted investors who are keen to buy shares in the
clubs and sign up the best footballers that money can buy.
Underpinning the growth in all of the premier league clubs
is a desire to make a distinct statement of identity as part
of a competitive strategy. One way to achieve this is
through the design and construction of iconic football
stadiums. This paper explores the specific project
management challenges associated with delivery of iconic
football stadiums in England and draws lessons for the
management of similar iconic infrastructure projects. A
study of project management best practice and some case
studies shows that key issues which are common to these
projects are centred on design management; choice of
procurement route; client management; and stakeholder
expectation management. These issues are not necessarily
unique to the project management of iconic football
stadiums but are amplified by the context of these
projects. The emphasis on iconic status in a competitive
market also means that stadium projects should be
conceived and delivered in the context of other strategic
projects which should be clearly understood by the project
management team
Integrating Building Information Modeling and Health and Safety for Onsite Construction
Background:
Health and safety (H&S) on a construction site can either make or break a contractor, if not properly managed. The usage of Building Information Modeling (BIM) for H&S on construction execution has the potential to augment practitioner understanding of their sites, and by so doing reduce the probability of accidents. This research explores BIM usage within the construction industry in relation to H&S communication.
Methods:
In addition to an extensive literature review, a questionnaire survey was conducted to gather information on the embedment of H&S planning with the BIM environment for site practitioners.
Results:
The analysis of responses indicated that BIM will enhance the current approach of H&S planning for construction site personnel.
Conclusion:
From the survey, toolbox talk will have to be integrated with the BIM environment, because it is the predominantly used procedure for enhancing H&S issues within construction sites. The advantage is that personnel can visually understand H&S issues as work progresses during the toolbox talk onsite
- …