2,987 research outputs found
Value Engineering: Final Report- Bear River Migratory Bird Refuge Headquarters and Education Complex
Potential Ecological Impacts of Snowpack Augmentation in the Uinta Mountains, Utah
Results of studies on the impacts of late-lying snow on four ecosystems are reported: lodgepole pine; spruce fir forests, subalpine meadow; and alpine herbland
Record of Decision: Operation of Flaming Gorge Dam Final Environmental Impact Statement
The Bureau of Reclamation (Reclamation) has completed a final environmental impact statement (EIS) on the operation of Flaming Gorge Dam. The EIS describes the potential effects of modifying the operation of Flaming Gorge Dam to assist in the recovery of four endangered fish, and their critical habitat, downstream from the dam. The four endangered fish species are Colorado pikeminnow (Ptychocheilus lucius), humpback chub (Gila cypha), razorback sucker (Xyrauchen texanus), and bonytail (Gila elegans). Reclamation would implement the proposed action by modifying the operations of Flaming Gorge Dam, to the extent possible, to achieve the flows and temperatures recommended by participants of the Upper Colorado River Endangered Fish Recovery Program (Recovery Program). Reclamation’s goal is to implement the proposed action and, at the same time, maintain and continue all authorized purposes of the Colorado River Storage Project. The purpose of the proposed action is to operate Flaming Gorge Dam to protect and assist in recovery of the populations and designated critical habitat of the four endangered fishes, while maintaining all authorized purposes of the Flaming Gorge Unit of the Colorado River Storage Project (CRSP), including those related to the development of water resources in accordance with the Colorado River Compact
Prestressed Concrete Pipe Failure Jordan Aqueduct, Reach 3
The Bureau of Reclamation conducted failure investigations to identify the cause(s) of a catastrophic rupture of prestressed concrete pipe under impressed current cathodic protection, which occurred on Reach 3 of the Jordan Aqueduct near Salt Lake City, Utah, on August 7, 1984. The multidisciplinary analyses included corrosion, design, petrographic, structural, and metallurgical investigations. From the onset of the failure, the issue was one of reconciling cathodic overprotection and defective (longitudinally cracked) prestressing wire. The report contains a summary of the findings from Reclamation investigations
Copies of Unique Comment Letters
Unique letters and messages regarding the Notice to solicit comments and hold public meetings on the development of management strategies for Lake Powell and Lake Mead, including Lower Basin shortage guidelines, under low reservoir conditions
- …