18 research outputs found

    Optimization of Main Factors Affecting Construction Waste by the Supply Chain Management

    Get PDF
    A survey report of the Vietnam Urban Environment and Industrial Zone Association reveals that every day in 2009, about 1,000 tons of construction waste were generated in Hanoi and 2,000 tons Ho Chi Minh City in Vietnam. It is forecasted that the coming years would see a vigorously growing amount of construction waste as a result of the plan to dismantle and renovate old apartment buildings in major cities. So, in this research we developed a supply chain management strategy for the waste controlling in the construction industry. While the bulky volume of construction wastes poses a great environmental threat to urban areas, response to it remains meager. Hence, this paper presents four primary factors affecting the management of construction wastes in Vietnam using fuzzy logic

    MULTI-PIXEL PHOTON COUNTER FOR OPERATING A TABLETOP COSMIC RAY DETECTOR UNDER LOOSELY CONTROLLED CONDITIONS

    Get PDF
    The multi-pixel photon counter (MPPC) has recently emerged as a great type of silicon photomultiplier to replace or compensate for conventional vacuum-based photomultiplier tubes. An MPPC provides many advantageous features, such as high electrical gain, outstanding photon detection efficiency, fast timing response, immunity to magnetic fields, low-voltage operation, compactness, portability, and cost-effectiveness. This article examines the electrical and optical characteristics of an MPPC under loosely controlled environmental conditions. We also report a measurement of the light yield captured by the MPPC when a cosmic ray passes through the plastic scintillator, demonstrating that such a setup is suitable as a simple, cost-effective tabletop cosmic ray detector for educational and research purposes

    Immunohistochemical expression of anaplastic lymphoma kinase in neuroblastoma and its relations with some clinical and histopathological features

    Get PDF
    Background Anaplastic lymphoma kinase (ALK) mutations have been identified as a prominent cause of some familial and sporadic neuroblastoma (NB). ALK expression in NB and its relationship with clinical and histopathological features remains controversial. This study investigated ALK expression and its potential relations with these features in NB. Methods Ninety cases of NB at the Department of Pathology, University of Medicine and Pharmacy at Ho Chi Minh City, Viet Nam from 01/01/2018 to 12/31/2021, were immunohistochemically stained with ALK (D5F3) antibody. The ALK expression and its relations with some clinical and histopathological features were investigated. Results The rate of ALK expression in NB was 91.1%. High ALK expression (over 50% of tumor cells were positive with moderate-strong intensity) accounted for 65.6%, and low ALK expression accounted for 34.4%. All the MYCN-amplified NB patients had ALK immunohistochemistry positivity, most cases had high ALK protein expression. The undifferentiated subtype of NB had a lower ALK-positive rate than the poorly differentiated and differentiated subtype. The percentages of ALK positivity were significantly higher in more differentiated histological types of NB (p = .024). There was no relation between ALK expression and: age group, sex, primary tumor location, tumor stage, MYCN status, clinical risk, Mitotic-Karyorrhectic Index, prognostic group, necrosis, and calcification. Conclusions ALK was highly expressed in NB. ALK expression was not related to several clinical and histopathological features. More studies are needed to elucidate the association between ALK expression and ALK gene status and to investigate disease progression, especially the oncogenesis of ALK-positive NB

    Measuring Supply Chain Smart Village Headman Performance

    Get PDF
    The supply chain management as the general tool can be used for supporting and delivering the goods to the villages. The village head is the leader of the village government. The tenure of the village head is 6 years, and can be extended for another one term is expected to run the government with a good performance in providing services to the community. So with the proper use of the supply chain the needs of the villages can be provide by the government. The Technique for Order Preference by Similarity to Ideal Solution (TOPSIS) method can help decision making in determining the performance index of the village head. This research is conduct by looking for the performance of positive and negative ideal solutions. Applications with the highest V value will occupy the top size in this system. Then the criteria in determining the performance index of the head of the village are: timeliness, discipline, responsibility, leadership, presence, value. The results of the decision-making system resulted in 6 alternative suggested performance indexes of village heads, with the highest score of Sending Agung Village

    Measuring Supply Chain Performance through Migrant Workers Placement

    Get PDF
    To facilitate existing procedures and improve decision making, a decision support system (SPK) needs to be built. This SPK aimed  to determine the placement of workers abroad using the Simple Additive Weighting (SAW) method and supply chain process. This method was chosen because it is  able to select the best alternative from a number of alternatives, in this case the alternative in question was  someone who was entitled to receive Placement based on predetermined criteria. This research was conducted by looking for weight values for each individual. The Decision Support System produced was  capable of ranking prospective Indonesian migrant workers and  making it easier for BP3TKI to make decisions about Indonesian migrant workers by supply chain resource management for who will depart abroad

    Factors Influencing Cost Overruns in Construction Projects of International Contractors in Vietnam

    Get PDF
    A construction project is a designed product made up of labors, materials, and installations in the project positioned on the ground and may include the underground and ground section, and the section in water or on the water surface. It is a civil, industrial, transport, agricultural and rural development, infrastructure, or some other. A key phase in the life cycle of these construction projects is the implementation when building products are made directly with workers, equipment, materials, and managers. If there is a lack of management experience, information, and problem-solving solutions to tackle the risks faced by contractors, especially foreign ones, will fail in controlling the project’s cost. This study was conducted with investigations, discussions, and evaluation of the factors that lead to cost overruns in the construction projects of international contractors in Vietnam. The principal component analysis (PCA) showed that those factors that influence cost overruns these construction projects fall into five general groups, including factors related to (i) the owners, (ii) the foreign contractors, (iii) the subcontractors and suppliers, (iv) state management, and (v) the project itself. Besides, the study proposes solutions to limit cost overruns in construction projects and improve the profitability of international contractors in Vietnam

    Exploring Critical Risk Factors of Office Building Projects

    Get PDF
    Risks and uncertainty are unavoidable problems in management of projects. Therefore, project managers should not only prevent risks, but also have to respond and manage them. Risk management has become a critical interest subject in the construction industry for both practitioners and researchers. This paper presents critical risk factors of office building projects in the construction phase in Ho Chi Minh City, Vietnam. Data was collected through a questionnaire survey based on the likelihood and consequence level of risk factors. These factors fell into five groups: (i) financial risk factors; (ii) management risk factors; (iii) schedule risk factors; (iv) construction risk factors; and (v) environment risk factors. The research results showed that critical factors affecting office building projects are natural (i.e., prolonged rain, storms, climate effects) and human-made issues (i.e., soil instability, safety behaviors, owner’s design change) and the schedule-related risk factors contributed to the most significant risks for office buildings projects in the construction phase in Ho Chi Minh City. They give construction management and project management practitioners a new perspective on risks and risk management of office buildings projects in Ho Chi Minh City and are proactive in the awareness, response, and management of risk factors comprehensively

    Best Quality Tomato Selection by Supply Chain Strategy for Renewable Energy

    Get PDF
    World agriculture still faces challenges quite fundamental, it is about the quality issues and the increasing of competitiveness through productivity and the eficiency. This research focused on the criteria of best tomato types and how to apply the Simple Additive weighting method (SAW) into a Decision Support System (DSS) for election best quality tomato that can assist farmers in determining the best type of tomato for renewable energy and supply chain strategy, based on the criteria that have been chosen, such as: tomato size, tomato color, tomato shape and tomato disease. By using the application of Simple Additive weighting method into Decision Support Systems value, it can be concluded that V5 is the best quality tomato and has a predicate value of 83.75 with the fragile values, as follows: 50-69 = Enough, 70-82 = Good, 83-100 = Best