196 research outputs found

    Experience in the exploitation of a large control system

    Get PDF
    Experience of a four-year exploitation of the large control system of the CERN PS accelerator complex is presented with special emphasis on the parameters which are very sensitive to the exploitation team productivity. The software tools suite used in this daily maintenance is described and a particular analysis of the power and benefits of advance software technology used for the architecture of this suite is explained. The integration of this suite in the Control System is presented, as well as its use in the Control System development phase. Some considerations of the potential benefit of an Object Oriented equipment access are outlined

    Representation and usage of knowledge for initialization of accelerator control equipment

    Get PDF
    A knowledge based application, called SETUP, to initialize and diagnose the CERN/PS accelerators' control equipment is described. The object model and the general features of control algorithms are presented, together with their relation to the knowledge description of the setting up of the system. The different ways of the integration of the SETUP in the control system are outlined

    Using Archon - 3. Particle acceleration control

    Full text link

    An Antiproton Decelerator in the CERN PS Complex

    Get PDF
    The present CERN PS low-energy antiproton complex involves 4 machines to collect, cool, decelerate and supply experiments with up to 1010 antiprotons per pulse and per hour of momenta ranging from 0.1 to 2 GeV/c. In view of a possible future physics programme requiring low energy antiprotons, mainly to carry out studies on antihydrogen, a simplified scheme providing at low cost antiprotons at 100 MeV/c has been studied. It requires only one machine, the present Antiproton Collector (AC) converted into a cooler and decelerator (Antiproton Decelerator, AD) and delivering beam to experiments in the hall of the present Antiproton Accumulator Complex (AAC) [1]. This paper describes the feasibility study of such a scheme [2]

    CLIC: a Two-Beam Multi-TeV e±e\pm Linear Collider

    Get PDF
    The CLIC study of a high-energy (0.5 - 5 TeV), high-luminosity (1034 - 1035 cm-2 sec-1) e+e- linear collider is presented. Beam acceleration using high frequency (30 GHz) normal-conducting structures operating at high accelerating fields (150 MV/m) significantly reduces the length and, in consequence, the cost of the linac. Using parameters derived from general scaling laws for linear colliders, the beam stability is shown to be similar to lower frequency designs in spite of the strong wake-field dependency on frequency. A new cost-effective and efficient drive beam generation scheme for RF power production by the so-called "Two-Beam Acceleration" method is described. It uses a thermionic gun and a fully-loaded normal-conducting linac operating at low frequency (937 MHz) to generate and accelerate the drive beam bunches, and RF multiplication by funnelling in compressor rings to produce the desired bunch structure. Recent 30 GHz hardware developments and CLIC Test Facility (CTF) results are described

    The antiproton decelerator (AD), a simplified antiproton source (feasibility study)

    Get PDF
    In view of a possible future physics programme concerning antihydrogen a simplified scheme for the provision of antiprotons of a few MeV has been studied. It uses the present target area and the modified Antiproton Collector (AC) in its present location. In this report all the systems are reviewed and their modifications discussed

    : Complements : system functions

    No full text

    Display computer NODAL user functions

    No full text
    • 

    corecore