4 research outputs found

    Status of the ACCULINNA-2 project at FLNR

    Get PDF
    The project of a new and more powerful in-flight fragment separator ACCULINNA-2 at U-400M cyclotron in FLNR, JINR planned to build in addition to the existing separator ACCULINNA is presented. The new separator will provide high intensity RIBs in the lowest energy range (5÷50 MeV/nucleon) which is attainable for in-flight separators. The possibilities for the astrophysics studies at the proposed device are presented. ACCULINNA-2 separator is planned to be constructed in the years 2010-2015. The current status of the project is reported
    corecore