4 research outputs found
ΠΠΠΠ‘ΠΠΠ§ΠΠΠΠ Π£Π‘Π’ΠΠΠ§ΠΠΠΠ‘Π’Π ΠΠ’ΠΠΠ‘ΠΠ ΠΠΠΠ ΠΠΠ― ΠΠΠ©ΠΠ’Π« ΠΠ’ ΠΠΠΠΠΠΠΠΠΠ ΠΠ Π ΠΠΠ ΠΠΠ Π«ΠΠ
Hydrologic conditions that cause the Goryn river floods have been described in the paper. The paper considers engineering solutions pertaining to prevention of catastrophic floodings by bifurcation of maximum river flow while constructing a watershed dike and creating a non-flood polder in the flood plain. The formulas have been developed for calculation of dike slope fixing by dumped riprap when the slopes are subjected to stream impact. The paper provides an analysis of existing dependences for calculation of riprap material size in order to protect slopes against waves. The possible ways for lower cost of fixation while usingΒ waste tyres and also while constructingΒ small wave-suppressing dikes reinforced by dumped riprap and shrub vegetation along the main dike have been revealed in the paper.ΠΠΏΠΈΡΡΠ²Π°ΡΡΡΡ Π³ΠΈΠ΄ΡΠΎΠ»ΠΎΠ³ΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΡΡΠ»ΠΎΠ²ΠΈΡ Π²ΠΎΠ·Π½ΠΈΠΊΠ½ΠΎΠ²Π΅Π½ΠΈΡ Π½Π°Π²ΠΎΠ΄Π½Π΅Π½ΠΈΠΉ Π½Π° Ρ. ΠΠΎΡΡΠ½ΠΈ. Π Π°ΡΡΠΌΠΎΡΡΠ΅Π½Ρ ΠΈΠ½ΠΆΠ΅Π½Π΅ΡΠ½ΡΠ΅ ΡΠ΅ΡΠ΅Π½ΠΈΡ ΠΏΠΎ ΠΏΡΠ΅Π΄ΠΎΡΠ²ΡΠ°ΡΠ΅Π½ΠΈΡ ΠΊΠ°ΡΠ°ΡΡΡΠΎΡΠΈΡΠ΅ΡΠΊΠΈΡ
Π½Π°Π²ΠΎΠ΄Π½Π΅Π½ΠΈΠΉ ΠΏΡΡΠ΅ΠΌ Π±ΠΈΡΡΡΠΊΠ°ΡΠΈΠΈ ΠΌΠ°ΠΊΡΠΈΠΌΠ°Π»ΡΠ½ΠΎΠ³ΠΎ ΡΡΠΎΠΊΠ° ΡΠ΅ΠΊΠΈ ΠΏΠΎΡΡΠ΅Π΄ΡΡΠ²ΠΎΠΌ ΡΠΎΠΎΡΡΠΆΠ΅Π½ΠΈΡ Π²ΠΎΠ΄ΠΎΡΠ°Π·Π΄Π΅Π»ΠΈΡΠ΅Π»ΡΠ½ΠΎΠΉ Π΄Π°ΠΌΠ±Ρ ΠΈ ΡΠΎΠ·Π΄Π°Π½ΠΈΡ Π½Π° ΠΏΠΎΠΉΠΌΠ΅ Π½Π΅Π·Π°ΡΠ°ΠΏΠ»ΠΈΠ²Π°Π΅ΠΌΠΎΠ³ΠΎ ΠΏΠΎΠ»ΡΠ΄Π΅ΡΠ°. Π Π°Π·ΡΠ°Π±ΠΎΡΠ°Π½Ρ ΡΠΎΡΠΌΡΠ»Ρ Π΄Π»Ρ ΡΠ°ΡΡΠ΅ΡΠ° ΠΊΡΠ΅ΠΏΠ»Π΅Π½ΠΈΠΉ ΠΎΡΠΊΠΎΡΠΎΠ² Π΄Π°ΠΌΠ± ΠΊΠ°ΠΌΠ΅Π½Π½ΠΎΠΉ Π½Π°Π±ΡΠΎΡΠΊΠΎΠΉ ΠΏΡΠΈ Π²ΠΎΠ·Π΄Π΅ΠΉΡΡΠ²ΠΈΠΈ ΡΠ΅ΡΠ΅Π½ΠΈΠΉ. ΠΠ°Π½ Π°Π½Π°Π»ΠΈΠ· ΡΡΡΠ΅ΡΡΠ²ΡΡΡΠΈΡ
Π·Π°Π²ΠΈΡΠΈΠΌΠΎΡΡΠ΅ΠΉ Π΄Π»Ρ ΡΠ°ΡΡΠ΅ΡΠ° ΠΊΡΡΠΏΠ½ΠΎΡΡΠΈ ΠΌΠ°ΡΠ΅ΡΠΈΠ°Π»Π° Π½Π°Π±ΡΠΎΡΠΊΠΈ Π΄Π»Ρ Π·Π°ΡΠΈΡΡ ΠΎΡΠΊΠΎΡΠΎΠ² ΠΎΡ Π΄Π΅ΠΉΡΡΠ²ΠΈΡ Π²ΠΎΠ»Π½. ΠΠΎΠΊΠ°Π·Π°Π½Ρ Π²ΠΎΠ·ΠΌΠΎΠΆΠ½ΡΠ΅ ΠΏΡΡΠΈ ΡΠ½ΠΈΠΆΠ΅Π½ΠΈΡ ΡΡΠΎΠΈΠΌΠΎΡΡΠΈ ΠΊΡΠ΅ΠΏΠ»Π΅Π½ΠΈΠΉ Ρ ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½ΠΈΠ΅ΠΌ ΠΎΡΡΠ°Π±ΠΎΡΠ°Π½Π½ΡΡ
Π°Π²ΡΠΎΠΏΠΎΠΊΡΡΡΠ΅ΠΊ, Π° ΡΠ°ΠΊΠΆΠ΅ ΠΏΡΡΠ΅ΠΌ ΡΠΎΠΎΡΡΠΆΠ΅Π½ΠΈΡ Π²Π΄ΠΎΠ»Ρ ΠΎΡΠ½ΠΎΠ²Π½ΠΎΠΉ Π΄Π°ΠΌΠ±Ρ Π²ΠΎΠ»Π½ΠΎΠ³Π°ΡΡΡΠΈΡ
Π΄Π°ΠΌΠ±ΠΎΡΠ΅ΠΊ, Π·Π°ΠΊΡΠ΅ΠΏΠ»Π΅Π½Π½ΡΡ
ΠΊΠ°ΠΌΠ΅Π½Π½ΠΎΠΉ Π½Π°Π±ΡΠΎΡΠΊΠΎΠΉ ΠΈ ΠΊΡΡΡΠ°ΡΠ½ΠΈΠΊΠΎΠ²ΠΎΠΉ ΡΠ°ΡΡΠΈΡΠ΅Π»ΡΠ½ΠΎΡΡΡΡ
Π‘ΠΠΠ ΠΠΠΠΠΠ«Π ΠΠΠ«Π’ ΠΠ ΠΠΠΠ’ΠΠ ΠΠΠΠΠΠ― ΠΠΠͺΠΠΠ’ΠΠ ΠΠΠΠΠΠ ΠΠ¦ΠΠ Π Π ΠΠΠΠΠ‘Π’Π Π£ΠΠ¦ΠΠ ΠΠΠΠΠΠ ΠΠ’ΠΠΠΠ«Π₯ Π‘ΠΠ‘Π’ΠΠ
The paper is devoted to problems pertaining to renovation and new construction of drainage systems in accordance with the State program on conservation and use of reclaimed agricultural land of the Republic of Belarus. It has been It has been established on the basis of the analysis of soil, hydrological and topographic surveys at eight renovation and new construction sites that overwatering of agricultural land is mainly derived from silting of channels, drains and sewer mouths; poor organization of surface water runoff from fields and compaction of subsurface horizon.Project activities have been conducted in accordance with existing regulatory documents. Polyethylene corrugated pipes have been used while designing new facilities and renovation of existing drainage systems. Diameters of plastic collectors have been calculated from well-known hydraulic formulas depending on drainage flow module and catchment area. Surface low-country runoff has been driven mainly by gullies, open craters and wells sinks. Composition of technical solutions used in the reconstruction of reclamation systems has been determined not only by hydrological conditions and a high-tech state of elements in the existing drainage system, but also by planned agricultural use of reclaimed land.The paper considers some examples pertaining to application of various approaches to the objects of new reclamation construction on fertile soil and reconstruction of reclamation systems under different soil and hydrogeological conditions of the Republic. Main technical and economic indicators are given in the paper. It has been shown that technical solutions incorporated in the projects of new construction and reconstruction of reclamation systems provide significant improvement in soil water regime and their effective agricultural use.Π‘ΡΠ°ΡΡΡ ΠΏΠΎΡΠ²ΡΡΠ΅Π½Π° Π²ΠΎΠΏΡΠΎΡΠ°ΠΌ ΡΠ΅ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΠΈ ΠΈ Π½ΠΎΠ²ΠΎΠ³ΠΎ ΡΡΡΠΎΠΈΡΠ΅Π»ΡΡΡΠ²Π° Π΄ΡΠ΅Π½Π°ΠΆΠ½ΡΡ
ΡΠΈΡΡΠ΅ΠΌ Π² ΡΠΎΠΎΡΠ²Π΅ΡΡΡΠ²ΠΈΠΈ Ρ ΠΠΎΡΡΠ΄Π°ΡΡΡΠ²Π΅Π½Π½ΠΎΠΉ ΠΏΡΠΎΠ³ΡΠ°ΠΌΠΌΠΎΠΉ ΡΠΎΡ
ΡΠ°Π½Π΅Π½ΠΈΡ ΠΈ ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½ΠΈΡ ΠΌΠ΅Π»ΠΈΠΎΡΠΈΡΠΎΠ²Π°Π½Π½ΡΡ
ΡΠ΅Π»ΡΡΠΊΠΎΡ
ΠΎΠ·ΡΠΉΡΡΠ²Π΅Π½Π½ΡΡ
Π·Π΅ΠΌΠ΅Π»Ρ Π Π΅ΡΠΏΡΠ±Π»ΠΈΠΊΠΈ ΠΠ΅Π»Π°ΡΡΡΡ. ΠΠ° ΠΎΡΠ½ΠΎΠ²Π°Π½ΠΈΠΈ Π°Π½Π°Π»ΠΈΠ·Π° ΠΏΠΎΡΠ²Π΅Π½Π½ΡΡ
, Π³ΠΈΠ΄ΡΠΎΠ»ΠΎΠ³ΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΈ ΡΠΎΠΏΠΎΠ³ΡΠ°ΡΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΈΠ·ΡΡΠΊΠ°Π½ΠΈΠΉ Π½Π° Π²ΠΎΡΡΠΌΠΈ ΠΎΠ±ΡΠ΅ΠΊΡΠ°Ρ
ΡΠ΅ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΠΈ ΠΈ Π½ΠΎΠ²ΠΎΠ³ΠΎ ΡΡΡΠΎΠΈΡΠ΅Π»ΡΡΡΠ²Π° ΡΡΡΠ°Π½ΠΎΠ²Π»Π΅Π½ΠΎ, ΡΡΠΎ ΠΏΠ΅ΡΠ΅ΡΠ²Π»Π°ΠΆΠ½Π΅Π½ΠΈΠ΅ ΡΠ΅Π»ΡΡΠΊΠΎΡ
ΠΎΠ·ΡΠΉΡΡΠ²Π΅Π½Π½ΡΡ
Π·Π΅ΠΌΠ΅Π»Ρ Π² ΠΎΡΠ½ΠΎΠ²Π½ΠΎΠΌ ΠΏΡΠΎΠΈΠ·ΠΎΡΠ»ΠΎ ΠΈΠ·-Π·Π° Π·Π°ΠΈΠ»Π΅Π½ΠΈΡ ΠΊΠ°Π½Π°Π»ΠΎΠ², Π΄ΡΠ΅Π½ ΠΈ ΡΡΡΡΠ΅Π² ΠΊΠΎΠ»Π»Π΅ΠΊΡΠΎΡΠΎΠ², ΠΏΠ»ΠΎΡ
ΠΎΠΉ ΠΎΡΠ³Π°Π½ΠΈΠ·Π°ΡΠΈΠΈ ΡΡΠΎΠΊΠ° ΠΏΠΎΠ²Π΅ΡΡ
Π½ΠΎΡΡΠ½ΡΡ
Π²ΠΎΠ΄ Ρ ΠΏΠΎΠ»Π΅ΠΉ ΠΈ ΡΠΏΠ»ΠΎΡΠ½Π΅Π½ΠΈΡ ΠΏΠΎΠ΄ΠΏΠ°Ρ
ΠΎΡΠ½ΠΎΠ³ΠΎ Π³ΠΎΡΠΈΠ·ΠΎΠ½ΡΠ°.ΠΡΠΎΠ΅ΠΊΡΠ½ΡΠ΅ ΠΌΠ΅ΡΠΎΠΏΡΠΈΡΡΠΈΡ ΠΏΡΠΎΠ²ΠΎΠ΄ΠΈΠ»ΠΈΡΡ Π² ΡΠΎΠΎΡΠ²Π΅ΡΡΡΠ²ΠΈΠΈ Ρ Π΄Π΅ΠΉΡΡΠ²ΡΡΡΠΈΠΌΠΈ Π½ΠΎΡΠΌΠ°ΡΠΈΠ²Π½ΡΠΌΠΈ Π΄ΠΎΠΊΡΠΌΠ΅Π½ΡΠ°ΠΌΠΈ. ΠΡΠΈ ΠΏΡΠΎΠ΅ΠΊΡΠΈΡΠΎΠ²Π°Π½ΠΈΠΈ Π½ΠΎΠ²ΡΡ
ΠΎΠ±ΡΠ΅ΠΊΡΠΎΠ² ΠΈ ΡΠ΅ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΠΈ ΡΡΡΠ΅ΡΡΠ²ΡΡΡΠΈΡ
Π΄ΡΠ΅Π½Π°ΠΆΠ½ΡΡ
ΡΠΈΡΡΠ΅ΠΌ ΠΏΡΠΈΠΌΠ΅Π½ΡΠ»ΠΈ ΠΏΠΎΠ»ΠΈΡΡΠΈΠ»Π΅Π½ΠΎΠ²ΡΠ΅ Π³ΠΎΡΡΠΈΡΠΎΠ²Π°Π½Π½ΡΠ΅ ΡΡΡΠ±Ρ. ΠΠΈΠ°ΠΌΠ΅ΡΡΡ ΠΏΠΎΠ»ΠΈΡΡΠΈΠ»Π΅Π½ΠΎΠ²ΡΡ
ΠΊΠΎΠ»Π»Π΅ΠΊΡΠΎΡΠΎΠ² ΡΠ°ΡΡΡΠΈΡΡΠ²Π°Π»ΠΈ ΠΏΠΎ ΠΎΠ±ΡΠ΅ΠΈΠ·Π²Π΅ΡΡΠ½ΡΠΌ ΡΠΎΡΠΌΡΠ»Π°ΠΌ Π³ΠΈΠ΄ΡΠ°Π²Π»ΠΈΠΊΠΈ Π² Π·Π°Π²ΠΈΡΠΈΠΌΠΎΡΡΠΈ ΠΎΡ ΠΌΠΎΠ΄ΡΠ»Ρ Π΄ΡΠ΅Π½Π°ΠΆΠ½ΠΎΠ³ΠΎ ΡΡΠΎΠΊΠ° ΠΈ Π²ΠΎΠ΄ΠΎΡΠ±ΠΎΡΠ½ΠΎΠΉ ΠΏΠ»ΠΎΡΠ°Π΄ΠΈ. ΠΠΎΠ²Π΅ΡΡ
Π½ΠΎΡΡΠ½ΡΠΉ ΡΡΠΎΠΊ ΠΈΠ· ΠΏΠΎΠ½ΠΈΠΆΠ΅Π½ΠΈΠΉ ΠΎΡΠ²ΠΎΠ΄ΠΈΠ»ΠΈ Π² ΠΎΡΠ½ΠΎΠ²Π½ΠΎΠΌ Ρ ΠΏΠΎΠΌΠΎΡΡΡ Π»ΠΎΠΆΠ±ΠΈΠ½ ΡΡΠΎΠΊΠ°, ΠΎΡΠΊΡΡΡΡΡ
Π²ΠΎΡΠΎΠ½ΠΎΠΊ ΠΈ ΠΊΠΎΠ»ΠΎΠ΄ΡΠ΅Π²-ΠΏΠΎΠ³Π»ΠΎΡΠΈΡΠ΅Π»Π΅ΠΉ. Π‘ΠΎΡΡΠ°Π² ΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΈΡ
ΡΠ΅ΡΠ΅Π½ΠΈΠΉ ΠΏΡΠΈΠΌΠ΅Π½ΡΠ΅ΠΌΡΡ
ΠΏΡΠΈ ΡΠ΅ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΠΈ ΠΌΠ΅Π»ΠΈΠΎΡΠ°ΡΠΈΠ²Π½ΡΡ
ΡΠΈΡΡΠ΅ΠΌ ΠΎΠΏΡΠ΅Π΄Π΅Π»ΡΠ»ΠΈ Π½Π΅ ΡΠΎΠ»ΡΠΊΠΎ Π³ΠΈΠ΄ΡΠΎΠ³Π΅ΠΎΠ»ΠΎΠ³ΠΈΡΠ΅ΡΠΊΠΈΠΌΠΈ ΡΡΠ»ΠΎΠ²ΠΈΡΠΌΠΈ ΠΈ ΡΠΎΠ²ΡΠ΅ΠΌΠ΅Π½Π½ΡΠΌ ΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΈΠΌ ΡΠΎΡΡΠΎΡΠ½ΠΈΠ΅ΠΌ ΡΠ»Π΅ΠΌΠ΅Π½ΡΠΎΠ² ΡΡΡΠ΅ΡΡΠ²ΡΡΡΠ΅ΠΉ Π΄ΡΠ΅Π½Π°ΠΆΠ½ΠΎΠΉ ΡΠΈΡΡΠ΅ΠΌΡ, Π½ΠΎ ΠΈ ΠΏΠ»Π°Π½ΠΈΡΡΠ΅ΠΌΡΠΌ ΡΠ΅Π»ΡΡΠΊΠΎΡ
ΠΎΠ·ΡΠΉΡΡΠ²Π΅Π½Π½ΡΠΌ ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½ΠΈΠ΅ΠΌ ΠΎΡΡΡΠ΅Π½Π½ΡΡ
Π·Π΅ΠΌΠ΅Π»Ρ.Π Π°ΡΡΠΌΠΎΡΡΠ΅Π½Ρ ΠΏΡΠΈΠΌΠ΅ΡΡ ΡΠ°Π·Π»ΠΈΡΠ½ΡΡ
ΠΏΠΎΠ΄Ρ
ΠΎΠ΄ΠΎΠ² ΠΊ ΠΎΠ±ΡΠ΅ΠΊΡΠ°ΠΌ Π½ΠΎΠ²ΠΎΠ³ΠΎ ΠΌΠ΅Π»ΠΈΠΎΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΡΡΠΎΠΈΡΠ΅Π»ΡΡΡΠ²Π° Π½Π° Π²ΡΡΠΎΠΊΠΎΠΏΠ»ΠΎΠ΄ΠΎΡΠΎΠ΄Π½ΡΡ
ΠΏΠΎΡΠ²Π°Ρ
ΠΈ ΠΊ ΠΎΠ±ΡΠ΅ΠΊΡΠ°ΠΌ ΡΠ΅ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΠΈ ΠΌΠ΅Π»ΠΈΠΎΡΠ°ΡΠΈΠ²Π½ΡΡ
ΡΠΈΡΡΠ΅ΠΌ Π² ΡΠ°Π·Π½ΡΡ
ΠΏΠΎΡΠ²Π΅Π½Π½ΠΎΠ³ΠΈΠ΄ΡΠΎΠ³Π΅ΠΎΠ»ΠΎΠ³ΠΈΡΠ΅ΡΠΊΠΈΡ
ΡΡΠ»ΠΎΠ²ΠΈΡΡ
ΡΠ΅ΡΠΏΡΠ±Π»ΠΈΠΊΠΈ. ΠΡΠΈΠ²Π΅Π΄Π΅Π½Ρ ΠΎΡΠ½ΠΎΠ²Π½ΡΠ΅ ΡΠ΅Ρ
Π½ΠΈΠΊΠΎ-ΡΠΊΠΎΠ½ΠΎΠΌΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΠΏΠΎΠΊΠ°Π·Π°ΡΠ΅Π»ΠΈ. ΠΠΎΠΊΠ°Π·Π°Π½ΠΎ, ΡΡΠΎ ΡΠ΅Ρ
Π½ΠΈΡΠ΅ΡΠΊΠΈΠ΅ ΡΠ΅ΡΠ΅Π½ΠΈΡ, Π·Π°Π»ΠΎΠΆΠ΅Π½Π½ΡΠ΅ Π² ΠΏΡΠΎΠ΅ΠΊΡΠ°Ρ
Π½ΠΎΠ²ΠΎΠ³ΠΎ ΡΡΡΠΎΠΈΡΠ΅Π»ΡΡΡΠ²Π° ΠΈ ΡΠ΅ΠΊΠΎΠ½ΡΡΡΡΠΊΡΠΈΠΈ ΠΌΠ΅Π»ΠΈΠΎΡΠ°ΡΠΈΠ²Π½ΡΡ
ΡΠΈΡΡΠ΅ΠΌ, ΠΎΠ±Π΅ΡΠΏΠ΅ΡΠ°Ρ ΡΡΡΠ΅ΡΡΠ²Π΅Π½Π½ΠΎΠ΅ ΡΠ»ΡΡΡΠ΅Π½ΠΈΠ΅ Π²ΠΎΠ΄Π½ΠΎΠ³ΠΎ ΡΠ΅ΠΆΠΈΠΌΠ° ΠΏΠΎΡΠ² ΠΈ ΠΈΡ
ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎΠ΅ ΡΠ΅Π»ΡΡΠΊΠΎΡ
ΠΎΠ·ΡΠΉΡΡΠ²Π΅Π½Π½ΠΎΠ΅ ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½ΠΈΠ΅
PROVISION OF DIKE SLOPE STABILITY FOR TERRITORY PROTECTION AGAINST GORYN RIVER FLOODS
Hydrologic conditions that cause the Goryn river floods have been described in the paper. The paper considers engineering solutions pertaining to prevention of catastrophic floodings by bifurcation of maximum river flow while constructing a watershed dike and creating a non-flood polder in the flood plain. The formulas have been developed for calculation of dike slope fixing by dumped riprap when the slopes are subjected to stream impact. The paper provides an analysis of existing dependences for calculation of riprap material size in order to protect slopes against waves. The possible ways for lower cost of fixation while usingΒ waste tyres and also while constructingΒ small wave-suppressing dikes reinforced by dumped riprap and shrub vegetation along the main dike have been revealed in the paper
MODERN DESIGN EXPERIENCE OF MELIORATION FACILITIES AND RENOVATION OF MELIORATIVE SYSTEMS
The paper is devoted to problems pertaining to renovation and new construction of drainage systems in accordance with the State program on conservation and use of reclaimed agricultural land of the Republic of Belarus. It has been It has been established on the basis of the analysis of soil, hydrological and topographic surveys at eight renovation and new construction sites that overwatering of agricultural land is mainly derived from silting of channels, drains and sewer mouths; poor organization of surface water runoff from fields and compaction of subsurface horizon.Project activities have been conducted in accordance with existing regulatory documents. Polyethylene corrugated pipes have been used while designing new facilities and renovation of existing drainage systems. Diameters of plastic collectors have been calculated from well-known hydraulic formulas depending on drainage flow module and catchment area. Surface low-country runoff has been driven mainly by gullies, open craters and wells sinks. Composition of technical solutions used in the reconstruction of reclamation systems has been determined not only by hydrological conditions and a high-tech state of elements in the existing drainage system, but also by planned agricultural use of reclaimed land.The paper considers some examples pertaining to application of various approaches to the objects of new reclamation construction on fertile soil and reconstruction of reclamation systems under different soil and hydrogeological conditions of the Republic. Main technical and economic indicators are given in the paper. It has been shown that technical solutions incorporated in the projects of new construction and reconstruction of reclamation systems provide significant improvement in soil water regime and their effective agricultural use