107 research outputs found

    An evaluation of bricklayers' motivation and productivity

    Get PDF
    Different motivation theories have been developed in general management to explain workers' attitude to production. Collectively, these theories represent manufacturing workers more than any other set of workers. Attempts made to apply these theories to construction operatives have produced different and often confused explanations of the motives behind construction operatives' productivity. This research approached construction operatives directly in order to evaluate their motivation in relation to their productivity. The research aimed at proving or disproving a conceptualised positive relationship between construction operative motivation and productivity. Previous construction researchers assumed that there was a positive relationship between productivity and motivation without any empirical prove. This oversight was largely due to problems of quantifying abstract concepts such as motivation. This obstacle needed to be removed before the relationship between motivation and productivity could be empirically established. A technique based on the Subjective Expected Utility Theory was developed to quantify motivation. Productivity was measured by activity sampling. Relating them together gave a third order polynomial relationship indicating that there is a basic motivation in every bricklayer regardless of his working environment. The relationship also provided an empirical prove of an earlier conceptualised optimal motivation theory. The thesis shows that there is no significant causal relationship between motivation and work rate; rather, motivation significantly influences the proportion of working time spent productively. From a model of production output, motivation and skill, it was demonstrated that skill dominates productivity in bricklaying. Motivation accounted for 2.4% of the percentage variation in work rate and 25.3% of the percentage variation in percentage productive time. From a sensitivity analysis of the predominance of skill, critical activities controlling production output which could form the basis of a training programme for new bricklayers were identified. After testing all observations and findings for validity, they were combined into a list of propositions which form the basis of a theory of construction operative motivation. Based on the affirmation of the optimal motivation theory in construction operatives, a new concept of hyper-production was proposed

    Architects Requirements of Decision Support Tools to deliver Low Impact Housing Design in the UK: Insights and Recommendations

    Get PDF
    The construction industry is facing increasing pressure to address environmental performance earlier in the design process. For United Kingdom (UK) buildings, design is perceived to be the key in delivering the low carbon agenda. Hence, a fundamental change to designers’ approach in designing for low impact buildings is needed. A mixed method approach comprising of questionnaires to sustainable architectural practices were combined with interviews of architects in practice and academia. This is necessary to identify the gaps in the current use of Building Performance Energy Simulation (BPES) tools as design- decision support for architects, towards recommending the requirements of new generation architects’ friendly tools for the early and detail stages of the design process to deliver the sustainable housing design in the UK. The results indicate a limited number of architects use BPES tools; that is, until the later stage of the design process. Moreover, there is need to focus on tool development for architects decision-making process, especially at the conceptual stage, where major decision are taken. Thus, the study focuses on recommending requirements of architects’ friendly tools, fit for their design-decision making at various stages of the design process. As architectural design decisions vary significantly in terms of accuracy, flexibility, and the level of detail, the study recommends that: at the early stages of the process, where relatively minimal information is available, flexibility and approximation in BPES tools is more approximate to support design decisions. Nevertheless, as the design develops, and more information becomes available, precision and higher levels of detail in BPES tools are required. Keywords: Building Performance Energy Simulation Tools, Decision Making, Low Impact Buildings, Royal Institute of British Architects, Sustainability

    Challenges of urban housing quality and its associations with neighbourhood environments: Insights and exepriences of Ibadan City, Nigeria

    Get PDF
    A survey of housing quality and neighbourhood environments of Ibadan City, Nigeria was conducted to evaluate the housing infrastructure and to identify those areas where there is a likelihood of future incidences of disease and epidemics. Based on existing demographic and land use characteristics, the city can be divided into high, medium and low-density zones. Penalty scoring, rather than positive scoring, was used to assess the conditions and quality of houses and the neighbourhood environment in each of the zones.Houses in the high-density area have the worst property and environmental characteristics followed by houses in the medium-density area. Based on housing condition alone, approximately half of all the dwellings surveyed (n = 172) in the three zones are categorised as either substandard or unfit for human habitation. Based on neighbourhood environment, none of the high and medium-density housing areas and only one of the low density areas attained the good-scoring grade. This is attributed in part to many residents being polygamists which means the houses are overcrowded with perhaps up to eight persons per room and to tenant abuse by internal conversion to increase the occupancy rate. More than half of the houses surveyed have at least or more major defect.Recommendations include government directed infrastructure improvements; a regeneration-drive by private investors with possible displacement of residents fromthe high-density zone to new towns; a vigorous programme of housing and health education; enhanced collaboration between stakeholders to develop enforceable standards for existing housing stock and future builds

    Differences in stakeholder ability in addressing unethical practices: Insights from the surveying profession

    Get PDF
    While several measures have been suggested to address unethical practices within the built environment, it remains unclear whether some stakeholders are more able to influence improvement in unethical practices than others, and if so whether such phenomenon manifests similarly or differently in different national contexts. This study pioneers the exploration of whether different built environment profession stakeholders (i.e., the practitioner/individual professional, the practitioner’s organization/company, and the professional body/association) have different abilities to influence improvement (i.e., positive change) in unethical practices, and subsequently whether such phenomenon manifests differently in different national contexts. The study used cross-sectional surveys of built environment surveying professionals in three countries: Ghana, Nigeria, and Tanzania. The findings revealed that there are significant differences in the abilities of stakeholders to influence improvement in unethical practices like political interference, discrimination, and nepotism. The findings further revealed that differences in stakeholder ability to influence improvement in unethical practices can manifest differently in different national contexts. The implication is that, in different national contexts, specific stakeholders could play a leading role in efforts to address unethical practices in which they are more capable of influencing improvement

    Assessment of procurement capacity challenges inhibiting public infrastructure procurement: A Nigerian inquiry

    Get PDF
    © 2018, Emerald Publishing Limited. Purpose: Public procurement capacity is composed of three facets: individual, organisational and an enabling national environment which encapsulates national legislation, policies and institutional arrangements that can facilitate or hamper the effectiveness of procurement. The purpose of this paper is to investigate the extent to which procurement capacity challenges in the national environment affect the effectiveness of infrastructure procurement by public agencies in Nigeria. Design/methodology/approach: A total of 30 procurement capacity challenges drawn from literature were operationalized in a survey of infrastructure procurement personnel in different tiers of public agencies (i.e. local and state government) in order to ascertain the critical challenges affecting the effectiveness of infrastructure procurement. The survey yielded 288 responses, which were analysed using descriptive statistics, one-sample t-test and independent-samples t-test. Findings: Challenges related to transparency, integrity and accountability are amongst the topmost challenges adversely affecting the effectiveness of public infrastructure procurement. There is limited difference in the extent to which the challenges affect the effectiveness of infrastructure procurement in different tiers of public agencies in Nigeria. Originality/value: Whilst various procurement capacity challenges have been identified in the extent literature, this study has shown that an assessment of their effect on the effectiveness of infrastructure procurement could reveal valuable insights regarding the status of public infrastructure procurement within a country, particularly countries in Sub-Saharan Africa and other developing regions where there is acute infrastructure deficits. Such insights could inform appropriate infrastructure procurement reforms by policy makers, procurement entities and infrastructure funders

    An investigation into the use of construction delay and disruption analysis methodologies

    Get PDF
    Delay and disruption (DD) to contractors’ progress, often resulting in time and cost overruns, are a major source of claims and disputes in the construction industry. At the heart of the matter in dispute is often the question of the extent of each contracting party’s responsibility for the delayed project completion and extra cost incurred. Various methodologies have been developed over the years as aids to answering this question. Whilst much has been written about DD, there is limited information on the extent of use of these methodologies in practice. The research reported in this thesis was initiated to investigate these issues in the UK, towards developing a framework for improving DD analysis. The methodology adopted in undertaking this research was the mixed method approach involving first, a detailed review of the relevant literature, followed by an industry-wide survey on the use of these methodologies and associated problems. Following this, interviews were conducted to investigate the identified problems in more depth. The data collected were analysed, with the aid of SPSS and Excel, using a variety of statistical methods including descriptive statistics analysis, relative index analysis, Kendall’s concordance and factor analysis. The key finding was that DD analysis methodologies reported in the literature as having major weaknesses are the most widely used in practice mainly due to deficiencies in programming and record keeping practice. To facilitate the use of more reliable methodologies, which ensure more successful claims resolution with fewer chances of disputes, a framework has been developed comprising of: (i) best practice recommendations for promoting better record-keeping and programming practice and; (ii) a model for assisting analysts in their selection of appropriate delay analysis methodology for any claims situation. This model was validated by means of experts’ review via a survey and the findings obtained suggest that the model is valuable and suitable for use in practice. Finally, areas for further research were identified.EThOS - Electronic Theses Online ServiceGBUnited Kingdo

    Infrastructure procurement skills gap amongst procurement personnel in Nigeria’s public sector

    Get PDF
    © 2018, Emerald Publishing Limited. Purpose: Procurement of public infrastructure that is fit for purpose partly depends on the competencies of procurement personnel. In many developing countries in Sub-Saharan Africa, including Nigeria, there is a deficit in the quantity and quality of infrastructure and their procurement is further riddled with deficiencies in the capacity of public procuring entities. The purpose of this study was to ascertain the critical skills development needs of public personnel involved in the procurement of infrastructure in Nigeria. Design/methodology/approach: Based on a quantitative research strategy, this study sought to address the knowledge gap through a survey of public infrastructure procurement personnel (n = 288) in different tiers of government (i.e. state and local government) and geopolitical contexts (north and south) in Nigeria. Findings: Of the 45 procurement skill areas operationalised, there is need for further development in 38 of them including: computing/ICT; problem-solving; communication; decision-making; health and safety management; quality management; relationship management; team building; project monitoring and evaluation; time management and procurement planning. Originality/value: A key implication of this study is for policymakers in state and local government to formulate and implement infrastructure procurement capacity development reforms that address the competency gaps of procurement personnel. Such reforms need to take into account the suitable methods for developing procurement competencies. Additionally, the procurement skill areas operationalised in this capacity assessment study could serve as a useful blueprint for studying capacity deficiencies amongst public infrastructure procurement personnel in other developing countries

    A fuzzy synthetic evaluation of the challenges of smart city development in developing countries

    Get PDF
    © 2020, Emerald Publishing Limited. Purpose: This study presents a fuzzy synthetic evaluation of the challenges of smart city realisation in developing countries, using Nigeria as a case study. By defining and delineating the problems faced by the country, more viable directions to attaining smart city development can be achieved. Design/methodology/approach: The study adopted a post-positivist philosophical stance with a deductive approach. A structured questionnaire was used to gather data from built environment professionals involved in the delivery of Nigerian public infrastructures. Six dimensions of the challenges of smart cities were identified from literature and explored. They are governance, economic, social, technological, environmental and legal issues. Data gathered were analysed using Cronbach alpha test for reliability, Shapiro-Wilks test for normality, Kruskal-Wallis H-test for consistency and fuzzy synthetic evaluation test for the synthetic evaluation of the challenges of smart city attainment. Findings: The findings revealed that all six assessed dimensions have a significant impact on the attainment of smart cities in Nigeria. More specifically, issues relating to environmental, technological, social and legal challenges are more prominent. Originality/value: The fuzzy synthetic approach adopted provides a clear, practical insight on the issues that need to be addressed before the smart city development can be attained within developing countries

    Violent behaviour on construction sites: Structural equation modelling of its impact on unsafe behaviour using partial least squares

    Get PDF
    Purpose: Work on construction sites involves individuals with diverse character, temperament,age, physical strength, culture, religion and experience level. A good number of these individuals are also alleged to involve themselves in substance and alcohol abuse due to the physically demanding nature of their work. These could promote the prevalence of violence on construction sites which could in turn affect safety on construction sites. However, there is a lack of empirical insight into the effect of violent behaviour and unsafe behaviour on construction sites. This study therefore pioneers an empirical inquiry into the relationship between violent behaviour and unsafe behaviour on construction sites. Design/methodology/approach: Seventeen violent behaviours and 15 unsafe behaviours were measured on 12 construction sites among 305 respondents using a structured questionnaire. A total of 207 valid questionnaire responses were collected from site workers. Partial least square–structural equation modelling (PLS-SEM) technique was used to examine the relationship between violent behaviour and unsafe behaviour. Findings: The results indicate that there is a significant positive relationship between violent behaviour and unsafe behaviour on construction sites. Originality/value: The findings from this study provide valuable insight into a less investigated dimension of the problem of construction site safety management. A focus on attitudinal issues such as how workers relate toward others and toward self should be an important consideration in safety improvement interventions on construction sites
    • …
    corecore