5,353 research outputs found
Performance of a Tungsten-Cerium Fluoride Sampling Calorimeter in High-Energy Electron Beam Tests
A prototype for a sampling calorimeter made out of cerium fluoride crystals
interleaved with tungsten plates, and read out by wavelength-shifting fibres,
has been exposed to beams of electrons with energies between 20 and 150 GeV,
produced by the CERN Super Proton Synchrotron accelerator complex. The
performance of the prototype is presented and compared to that of a Geant4
simulation of the apparatus. Particular emphasis is given to the response
uniformity across the channel front face, and to the prototype's energy
resolution.Comment: 6 pages, 6 figures, Submitted to NIM
Response of microchannel plates in ionization mode to single particles and electromagnetic showers
Hundreds of concurrent collisions per bunch crossing are expected at future
hadron colliders. Precision timing calorimetry has been advocated as a way to
mitigate the pileup effects and, thanks to their excellent time resolution,
microchannel plates (MCPs) are good candidate detectors for this goal. We
report on the response of MCPs, used as secondary emission detectors, to single
relativistic particles and to electromagnetic showers. Several prototypes, with
different geometries and characteristics, were exposed to particle beams at the
INFN-LNF Beam Test Facility and at CERN. Their time resolution and efficiency
are measured for single particles and as a function of the multiplicity of
particles. Efficiencies between 50% and 90% to single relativistic particles
are reached, and up to 100% in presence of a large number of particles. Time
resolutions between 20ps and 30ps are obtained.Comment: 20 pages, 9 figures. Paper submitted to NIM
Radiation hardness qualification of PbWO4 scintillation crystals for the CMS Electromagnetic Calorimeter
This is the Pre-print version of the Article. The official published version can be accessed from the link below - Copyright @ 2010 IOPEnsuring the radiation hardness of PbWO4 crystals was one of the main priorities during the construction of the electromagnetic calorimeter of the CMS experiment at CERN. The production on an industrial scale of radiation hard crystals and their certification over a period of several years represented a difficult challenge both for CMS and for the crystal suppliers. The present article reviews the related scientific and technological problems encountered
- âŠ