5 research outputs found

    Combination of Riprap and Submerged Vane as an Abutment Scour Countermeasure

    No full text
    Scour is one of the main causes of hydraulic structural failures. The present experimental study examines the use of riprap, submerged vanes, and a combination of these for scour reduction around vertical walls and spill-through abutments under clear-water conditions. Specifically, the influence of placing riprap stones with different apron shapes (geometry) and/or a group of submerged vanes of constant height and length on abutment scour was examined. The main aim is to propose the optimum apron geometry and placement of submerged vanes to (1) reduce edge failure at vertical walls and spill-through abutments; and (2) prevent shear failure at the spill-through abutment (no shear failure is observed around the vertical wall abutment). The results show that using ripraps for scour protection is more effective than submerged vanes. However, the highest reduction in scour depth was achieved when a combination of riprap and submerged vanes was used together. This arrangement can reduce the maximum clear-water scour depth by up to 54% and 39% with vertical walls and spill-through abutments, respectively. Furthermore, selecting appropriate apron scale ratios reduces the required riprap volume by up to 46% and 31% for the vertical wall and spill-through abutment, respectively. In addition, the installation of vanes increased the riprap stability and reduced edge failure in both abutments tested. Finally, using riprap aprons with proper scales ratios at the downstream side of the spill-through abutment also prevents shear failure in this zone

    Combination of Riprap and Submerged Vane as an Abutment Scour Countermeasure

    No full text
    Scour is one of the main causes of hydraulic structural failures. The present experimental study examines the use of riprap, submerged vanes, and a combination of these for scour reduction around vertical walls and spill-through abutments under clear-water conditions. Specifically, the influence of placing riprap stones with different apron shapes (geometry) and/or a group of submerged vanes of constant height and length on abutment scour was examined. The main aim is to propose the optimum apron geometry and placement of submerged vanes to (1) reduce edge failure at vertical walls and spill-through abutments; and (2) prevent shear failure at the spill-through abutment (no shear failure is observed around the vertical wall abutment). The results show that using ripraps for scour protection is more effective than submerged vanes. However, the highest reduction in scour depth was achieved when a combination of riprap and submerged vanes was used together. This arrangement can reduce the maximum clear-water scour depth by up to 54% and 39% with vertical walls and spill-through abutments, respectively. Furthermore, selecting appropriate apron scale ratios reduces the required riprap volume by up to 46% and 31% for the vertical wall and spill-through abutment, respectively. In addition, the installation of vanes increased the riprap stability and reduced edge failure in both abutments tested. Finally, using riprap aprons with proper scales ratios at the downstream side of the spill-through abutment also prevents shear failure in this zone

    Experimental Study on the Optimum Installation Depth and Dimensions of Roughening Elements on Abutment as Scour Countermeasures

    No full text
    The causes of many bridge failures have been reported to be local scour around abutments. This study examines roughening elements as devices with which to intercept the downflow responsible for the formation of the principal vortex, which is what triggers local scour around abutments. Two vertical wall abutments with different widths were examined under four different hydraulic conditions in a clear-water regime. Elements with different thicknesses (t) and protrusions (P) with the same dimensions, (P = t = 0.05 L, 0.1 L, 0.2 L, and 0.3 L, where L is the length of the abutment) and with varying depths of installation (Z) were considered. Elements were installed in two positions: between the sediment surface and water elevation and buried within the sediment. To determine the optimum depth of installation, one element was first installed on the sediment surface, and the number of elements was increased in each subsequent test. The results show that installing elements between water surface elevation and the sediment’s initial level did not show any defined trend on scour depth reduction. However, the optimum installation depth of the elements is 0.6–0.8 L below the initial bed level. Moreover, the roughening elements with thickness and protrusion of P = t = 0.2 L resulted in the most effective protection of the foundation. The best arrangement, (P = t = 0.2 L and Z = >0.6–0.8 L) reduced the maximum scour depth by up to 30.4% and 32.8% for the abutment with smaller and larger widths, respectively

    Computation of Time of Concentration Based on Two-Dimensional Hydraulic Simulation

    No full text
    Time of concentration (TC) is a parameter in runoff estimation, used to study and design different types of projects in watersheds. Any error in TC calculation leads to an inaccurate estimation of the design flow, which can lead to over-sizing or under-sizing of designed facilities that can have great economic and environmental consequences. Therefore, choosing the correct method to estimate TC is of great importance. Due to the diversity of estimation methods in the literature, the obtained TC values are different. This study aims to present a new method to calculate TC, based on its main concept, i.e., the time required for a water parcel to reach its outlet from the farthest hydrological point of a watershed. A two-dimensional hydraulic simulation was used to model the water parcel travel. A watershed was selected as a case study, and its time of concentration was determined by salt solution tracing. The field measurement results were used for calibration of the numerical simulation model. Meanwhile, 31 empirical relations in the literature were reviewed to determine the most accurate ones. Estimated TC values were compared with the measured ones, and the relative error percentage was used to evaluate the accuracy of the result. In the empirical TC methods, the maximum error was above 300%, and the minimum error was 6.7% for the field studied area. The relative errors of hydraulic simulation outputs were between 3 and 27%. The results showed that only three empirical methods, namely Simas and Hawkins, SCSlag, and Yen and Chow, had the least errors respectively equal to 6.7%, 8.660%, and 13.5%, which can be recommended for the studied area and those with similar hydrological characteristics. On the other hand, hydraulic simulation is also introduced as an efficient method to determine TC which can be used in any desired watershed

    Computation of Time of Concentration Based on Two-Dimensional Hydraulic Simulation

    No full text
    Time of concentration (TC) is a parameter in runoff estimation, used to study and design different types of projects in watersheds. Any error in TC calculation leads to an inaccurate estimation of the design flow, which can lead to over-sizing or under-sizing of designed facilities that can have great economic and environmental consequences. Therefore, choosing the correct method to estimate TC is of great importance. Due to the diversity of estimation methods in the literature, the obtained TC values are different. This study aims to present a new method to calculate TC, based on its main concept, i.e., the time required for a water parcel to reach its outlet from the farthest hydrological point of a watershed. A two-dimensional hydraulic simulation was used to model the water parcel travel. A watershed was selected as a case study, and its time of concentration was determined by salt solution tracing. The field measurement results were used for calibration of the numerical simulation model. Meanwhile, 31 empirical relations in the literature were reviewed to determine the most accurate ones. Estimated TC values were compared with the measured ones, and the relative error percentage was used to evaluate the accuracy of the result. In the empirical TC methods, the maximum error was above 300%, and the minimum error was 6.7% for the field studied area. The relative errors of hydraulic simulation outputs were between 3 and 27%. The results showed that only three empirical methods, namely Simas and Hawkins, SCSlag, and Yen and Chow, had the least errors respectively equal to 6.7%, 8.660%, and 13.5%, which can be recommended for the studied area and those with similar hydrological characteristics. On the other hand, hydraulic simulation is also introduced as an efficient method to determine TC which can be used in any desired watershed
    corecore