2 research outputs found

    Blowdown Heat Transfer Separate-Effects Program. Quarterly progress report, April-June 1980

    No full text
    Two transient film boiling tests were run - one in upflow, the other in downflow. The purpose of these tests was to provide experimental heat transfer data that could be used in an assessment of several film boiling correlations used in current thermal-hydraulic computer codes. The tests were designed to provide accurate posttest calculations of heat fluxes, surface temperatures, and local fluid conditions. THe Upflow Film Boiling Test 3.03.6AR was run on May 21, 1980, in the THTF. This test resulted in single-phase fluid flow at the test section inlet (subcooled) during the time the bundle was in high-flow film boiling. Furthermore, no flow reversal occurred during the test. Preliminary posttest analysis indicates that the calculation of mass flows at the inlet to the test section should result in numbers with relatively small uncertainties. We are optimistic that local fluid conditions can be calculated for this test with an accuracy sufficient for correlation evaluation. 7 figs

    Blowdown heat transfer separate-effects program. Quarterly progress report, January-March 1980

    No full text
    Six additional bundle uncovery/recovery tests were performed in the Thermal-Hydraulic Test Facility during January, bringing the total number of these tests to eight. Data taken during the tests were found to be contaminated by numerous spurious spikes. Work to remove the spurious spikes is under way. Posttest analysis of the tests is approx.20% completed. The recovery portion of one of the tests will be analyzed by COBRA/TRAC, currently being developed by Pacific Northwest Laboratories (PNL). Work to debug the code for this application is in progress at PNL. The uncovery/recovery tests apparently caused damage to the 0-rings that form part of the loop pressure boundary. Refurbishment of the 0-ring seal system is being performed concurrently with scheduled loop modifications that include installation of ten in-bundle differential pressure instruments. Design, procurement, and fabrication of the in-bundle gamma densitometer system are continuing on schedule
    corecore