8 research outputs found

    The influence of intraoperative central venous pressure on delayed graft function in renal transplantation : a single-center experience

    Full text link
    Delayed graft function (DGF) is a common complication in kidney transplantation. We sought to evaluate possible correlates for DGF including intraoperative parameters, focusing on fluid replacement and central venous pressure (CVP) values among patients undergoing kidney transplantation at our center

    Development and validation of a score to predict postoperative respiratory failure in a multicentre European cohort : A prospective, observational study

    Full text link
    BACKGROUND Postoperative respiratory failure (PRF) is the most frequent respiratory complication following surgery. OBJECTIVE The objective of this study was to build a clinically useful predictive model for the development of PRF. DESIGN A prospective observational study of a multicentre cohort. SETTING Sixty-three hospitals across Europe. PATIENTS Patients undergoing any surgical procedure under general or regional anaesthesia during 7-day recruitment periods. MAIN OUTCOME MEASURES Development of PRF within 5 days of surgery. PRF was defined by a partial pressure of oxygen in arterial blood (PaO2) less than 8 kPa or new onset oxyhaemoglobin saturation measured by pulse oximetry (SpO(2)) less than 90% whilst breathing room air that required conventional oxygen therapy, noninvasive or invasive mechanical ventilation. RESULTS PRF developed in 224 patients (4.2% of the 5384 patients studied). In-hospital mortality [95% confidence interval (95% CI)] was higher in patients who developed PRF [10.3% (6.3 to 14.3) vs. 0.4% (0.2 to 0.6)]. Regression modelling identified a predictive PRF score that includes seven independent risk factors: low preoperative SpO(2); at least one preoperative respiratory symptom; preoperative chronic liver disease; history of congestive heart failure; open intrathoracic or upper abdominal surgery; surgical procedure lasting at least 2 h; and emergency surgery. The area under the receiver operating characteristic curve (c-statistic) was 0.82 (95% CI 0.79 to 0.85) and the Hosmer-Lemeshow goodness-of-fit statistic was 7.08 (P = 0.253). CONCLUSION A risk score based on seven objective, easily assessed factors was able to predict which patients would develop PRF. The score could potentially facilitate preoperative risk assessment and management and provide a basis for testing interventions to improve outcomes. The study was registered at ClinicalTrials.gov (identifier NCT01346709)

    Weaning from mechanical ventilation in intensive care units across 50 countries (WEAN SAFE): a multicentre, prospective, observational cohort study

    Full text link
    International audienceBackground: Current management practices and outcomes in weaning from invasive mechanical ventilation are poorly understood. We aimed to describe the epidemiology, management, timings, risk for failure, and outcomes of weaning in patients requiring at least 2 days of invasive mechanical ventilation. Methods: WEAN SAFE was an international, multicentre, prospective, observational cohort study done in 481 intensive care units in 50 countries. Eligible participants were older than 16 years, admitted to a participating intensive care unit, and receiving mechanical ventilation for 2 calendar days or longer. We defined weaning initiation as the first attempt to separate a patient from the ventilator, successful weaning as no reintubation or death within 7 days of extubation, and weaning eligibility criteria based on positive end-expiratory pressure, fractional concentration of oxygen in inspired air, and vasopressors. The primary outcome was the proportion of patients successfully weaned at 90 days. Key secondary outcomes included weaning duration, timing of weaning events, factors associated with weaning delay and weaning failure, and hospital outcomes. This study is registered with ClinicalTrials.gov, NCT03255109. Findings: Between Oct 4, 2017, and June 25, 2018, 10 232 patients were screened for eligibility, of whom 5869 were enrolled. 4523 (77·1%) patients underwent at least one separation attempt and 3817 (65·0%) patients were successfully weaned from ventilation at day 90. 237 (4·0%) patients were transferred before any separation attempt, 153 (2·6%) were transferred after at least one separation attempt and not successfully weaned, and 1662 (28·3%) died while invasively ventilated. The median time from fulfilling weaning eligibility criteria to first separation attempt was 1 day (IQR 0–4), and 1013 (22·4%) patients had a delay in initiating first separation of 5 or more days. Of the 4523 (77·1%) patients with separation attempts, 2927 (64·7%) had a short wean (≤1 day), 457 (10·1%) had intermediate weaning (2–6 days), 433 (9·6%) required prolonged weaning (≥7 days), and 706 (15·6%) had weaning failure. Higher sedation scores were independently associated with delayed initiation of weaning. Delayed initiation of weaning and higher sedation scores were independently associated with weaning failure. 1742 (31·8%) of 5479 patients died in the intensive care unit and 2095 (38·3%) of 5465 patients died in hospital. Interpretation: In critically ill patients receiving at least 2 days of invasive mechanical ventilation, only 65% were weaned at 90 days. A better understanding of factors that delay the weaning process, such as delays in weaning initiation or excessive sedation levels, might improve weaning success rates. Funding: European Society of Intensive Care Medicine, European Respiratory Society
    corecore