3 research outputs found
Impact of the regulatory reserve and capacity demand on the process of justification of the generating sources in respect of the UES Russia management development
An analysis is made of the regulatory documents used to justify the capacity demand and one of its components - the normative capacity reserve. The methodological principles for considering energy availability at hydroelectric power stations from the standpoint of justification of reserve funds are justified. For the price zones of the UES Russia, retrospective information on the forecast values of maximum loads and power generation at hydroelectric power stations has been compared with their actual values. The article gives the practical results of influence of the identified regulatory documents inconsistencies and deviations of the maximum load forecasts and hydroelectric power generation from the actual power demand values and the justification of the generating sources to cover it under a competitive power selection procedure