3 research outputs found
SPATIAL DATA UNCERTAINTY IN A WEBGIS TOOL SUPPORTING SEDIMENTS MANAGEMENT IN WALLONIA
This paper describes a WebGIS prototype developed for the Walloon administration to improve the communication and the management of sediments dredging actions carried out in rivers and lakes. In Wallonia, levelling dredged sediments on banks requires an official authorization from the administration. This request refers to geospatial datasets such as the official land use map, the cadastral map or the distance to potential pollution sources. Centralising geodatabases within a web interface facilitate the management of these authorizations for the managers and the central administration. The proposed system integrates various data from disparate sources. Some issues in map scale, spatial search quality and cartographic visualisation are discussed in this paper with the solutions provided. The prototype web application is currently discussed with some potential users in order to understand in which way this tool facilitate the communication, the management and the quality of the authorisation process. The structure of the paper states the why, what, who and how of this communication tool with a special focus on errors and uncertainties
Application of the Hybrid Finite Element Mixing Cell method to an abandoned coalfield in Belgium
The Hybrid Finite Element Mixing Cell (HFEMC) method is a flexible modelling technique particularly suited to mining problems. The principle of this method is to subdivide the modelled zone into several subdomains and to select a specific equation, ranging from the simple linear reservoir equation to the groundwater flow in porous media equation, to model groundwater flow in each subdomain. The model can be run in transient conditions, which makes it a useful tool for managing mine closure post-issues such as groundwater rebound and water inrushes.
The application of the HFEMC method to an abandoned underground coal mine near the city of Liege (Belgium) is presented. The case study zone has been discretized taking advantage of the flexibility of the method. Then, the model has been calibrated in transient conditions based on both hydraulic head and water discharge rate observation and an uncertainty analysis has been performed. Finally, the calibrated model has been used to run several scenarios in order to assess the impacts of possible future phenomena on the hydraulic heads and the water discharge rates. Among others, the simulation of an intense rainfall event shows a quick and strong increase in hydraulic heads in some zones coupled with an increase in associated water discharge rates. This could lead to stability problems in local hill slopes. These predictions will help managing and predicting mine water problems in this complex mining system