Chesapeake Bay Impact Structure Deep Drilling Project Completes Coring
The Chesapeake Bay Impact Structure Deep Drilling Project (CBIS Project) completed its coring operations during SeptemberâDecember 2005 and AprilâMay 2006. Cores were collected continuously to a total depth of 1766 m. The recovered section consists of 1322 m of impactites beneath 444 m of post-impact continental shelf sediments.The CBIS Project is a joint venture of the International Continental Scientifi c Drilling Program (ICDP) and the U.S. Geological Survey (USGS). Project activities began with a planning workshop in September 2003 attended by sixtythree scientists from ten countries. Field operations began with site preparation in July 2005, and coring began in September 2005. Drilling, Observation and Sampling of theEarthâs Continental Crust (DOSECC) was the general contractor for the drilling operations throughout 2005