8 research outputs found
A French translation of the Goldsmiths Musical Sophistication Index, an instrument to assess self-reported musical skills, abilities and behaviours
Higher sense of coherence is associated with better mental and physical health in emergency medical services: results from investigations on the revised sense of coherence scale (SOC-R) in rescue workers
Life situation and psychosocial care of adolescent and young adult (AYA) cancer patients – study protocol of a 12-month prospective longitudinal study
Yield-to-BIM: impacts of BIM maturity on project performance
How does organizational experience (maturity) with building information modelling (BIM) impact on the broad implementation of BIM and on company performance? A survey of Dutch architectural, engineering, construction, and operation (AECO) professionals (n = 890) is used to examine their perceptions of the impact of BIM maturity on firm performance. Survey items included measures of BIM element maturity (i.e., strategy, BIM uses, process, information, infrastructure and personnel), and key performance indicators (time, cost and quality performance). Surprisingly, the maturity of the BIM implementation strategy was the only reliable predictor of time, cost and quality performance. The result suggests that the impact of BIM maturity on project performance may be limited and it cautions against overoptimistic appraisals of BIM. In addition to the contribution to the literature on BIM performance, the paper should be of interest to the practitioner contemplating BIM investment