126 research outputs found

    Crew Scheduling for Netherlands Railways: "destination: customer"

    Get PDF
    : In this paper we describe the use of a set covering model with additional constraints for scheduling train drivers and conductors for the Dutch railway operator NS Reizigers. The schedules were generated according to new rules originating from the project "Destination: Customer" ("Bestemming: Klant" in Dutch). This project is carried out by NS Reizigers in order to increase the quality and the punctuality of its train services. With respect to the scheduling of drivers and conductors, this project involves the generation of efficient and acceptable duties with a high robustness against the transfer of delays of trains. A key issue for the acceptability of the duties is the included amount of variation per duty. The applied set covering model is solved by dynamic column generation techniques, Lagrangean relaxation and powerful heuristics. The model and the solution techniques are part of the TURNI system, which is currently used by NS Reizigers for carrying out several analyses concerning the required capacities of the depots. The latter are strongly influenced by the new rules.crew scheduling;dynamic column generation;lagrange relaxation;railways;set covering model

    Mathematical models for planning support

    Get PDF
    In this paper we describe how computer systems can provide planners with active planning support, when these planners are carrying out their daily planning activities. This means that computer systems actively participate in the planning process by automatically generating plans or partial plans. Active planning support by computer systems requires the application of mathematical models and solution techniques. In this paper we describe the modeling process in general terms, as well as several modeling and solution techniques. We also present some background information on computational complexity theory, since most practical planning problems are hard to solve. We also describe how several objective functions can be handled, since it is rare that solutions can be evaluated by just one single objective. Furthermore, we give an introduction into the use of mathematical modeling systems, which are useful tools in a modeling context, especially during the development phases of a mathematical model. We finish the paper with a real life example related to the planning process of the rolling stock circulation of a railway operator.optimization;mathematical models;modeling process;planning support;Planning

    Algorithmic Support for Railway Disruption Management

    Get PDF
    Disruptions of a railway system are responsible for longer travel times and much discomfort for the passengers. Since disruptions are inevitable, the railway system should be prepared to deal with them effectively. This paper explains that, in case of a disruption, rescheduling the timetable, the rolling stock circulation, and the crew duties is so complex that solving them manually is too time consuming in a time critical situation where every minute counts. Therefore, algorithmic support is badly needed. To that end, we describe models and algorithms for real-time rolling stock rescheduling and real-time crew rescheduling that are currently being developed and that are to be used as the kernel of decision support tools for disruption management. Furthermore, this paper argues that a stronger passenger orientation, facilitated by powerful algorithmic support, will allow to mitigate the adverse effects of the disruptions for the passengers. The latter will contribute to an increased service quality provided by the railway system. This will be instrumental in increasing the market share of the public transport system in the mobility market.

    Railway timetabling from an operations research

    Get PDF
    In this paper we describe Operations Research (OR) models andtechniques that can be used for determining (cyclic) railwaytimetables. We discuss the two aspects of railway timetabling: (ii)the determination of arrival and departure times of the trains atthe stations and other relevant locations such as junctions andbridges, and (iiii) the assignment of each train to an appropriateplatform and corresponding inbound and outbound routes in everystation. Moreover, we discuss robustness aspects of bothsubproblems.

    Shunting of Passenger Train Units: an Integrated Approach

    Get PDF
    In this paper, we describe a new model for the Train Unit Shunting Problem. This model is capable of solving the matching and parking subproblems in an integrated manner, usually requiring a reasonable amount of computation time for generating acceptable solutions. Furthermore, the model incorporates complicating details from practice, such as trains composed of several train units and tracks that can be approached from two sides. Computation times are reduced by introducing the concept of virtual shunt tracks. Computational results are presented for real-life cases of NS Reizigers, the main Dutch passenger railway operator.Optimization;Passenger Railways;Shunting

    Reliability and heterogeneity of railway services

    Get PDF
    Reliability is one of the key factors in transportation, both for passengers and for cargo. This paper examines reliability in public railway systems. Reliability of railway services is a complex matter, since there are many causes for disruptions and at least as many causes for delays to spread around in space and time. One way to increase the reliability is to reduce the propagation of delays due to the interdependencies between trains. In this paper we attempt to decrease these interdependencies by reducing the running time differences per track section, i.e. by creating more homogeneous timetables. Because of the complexity of railway systems, we use network wide simulation for the analysis of the alternative timetables. We report on both theoretical and practical cases. Besides a comparison of different timetables, also general timetabling principles are deduced.heterogeneity;simulation;reliability;transportation;railways

    Operations research in passenger railway transportation

    Get PDF
    In this paper, we give an overview of state-of-the-art OperationsResearch models and techniques used in passenger railwaytransportation. For each planning phase (strategic, tactical andoperational), we describe the planning problems arising there anddiscuss some models and algorithms to solve them. We do not onlyconsider classical, well-known topics such as timetabling, rollingstock scheduling and crew scheduling, but we also discuss somerecently developed topics as shunting and reliability oftimetables.Finally, we focus on several practical aspects for each of theseproblems at the largest Dutch railway operator, NS Reizigers.passenger railway transportation;operation research;planning problems

    Shunting of Passenger Train Units in a Railway Station

    Get PDF
    In this paper we introduce the problem of shunting passenger trainunits in a railway station. Shunting occurs whenever train units aretemporarily not necessary to operate a given timetable. We discussseveral aspects of this problem and focus on two subproblems. Wepropose mathematical models for these subproblems together with asolution method based on column generation. Furthermore, a newefficient and speedy solution technique for pricing problems in columngeneration algorithms is introduced. Finally, we present computationalresults based on real life instances from Netherlands Railways.logistics;column generation;railway optimization;real world application

    Decision support for crew rostering at NS

    Get PDF
    This paper describes a method for solving the cyclic crewrostering problem (CCRP). This is the problem of cyclicallyordering a set of duties for a number of crew members, such thatseveral complex constraints are satisfied and such that thequality of the obtained roster is as high as possible. Thedescribed method was tested on a number of instances of NS, thelargest operator of passenger trains in the Netherlands. Theseinstances involve the generation of rosters for groups of traindrivers or conductors of NS. The tests show that high qualitysolutions for practical instances of the CCRP can be generated inan acceptable amount of computing time. Finally, we describe anexperiment where we constructed rosters in an automatic way for agroup of conductors. They preferred our - generated - rosters overtheir own manually constructed rosters.

    Railway Crew Rescheduling with Retiming

    Get PDF
    Railway operations are disrupted frequently, e.g. the Dutch railway network experiences about three large disruptions per day on average. In such a disrupted situation railway operators need to quickly adjust their resource schedules. Nowadays, the timetable, the rolling stock and the crew schedule are recovered in a sequential way. In this paper, we model and solve the crew rescheduling problem with retiming. This problem extends the crew rescheduling problem by the possibility to delay the departure of some trains. In this way we partly integrate timetable adjustment and crew rescheduling. The algorithm is based on column generation techniques combined with Lagrangian heuristics. In order to prevent a large increase in computational time, retiming is allowed only for a limited number of trains where it seems very promising. Computational experiments with real-life disruption data show that, compared to the classical approach, it is possible to find better solutions by using crew rescheduling with retiming.
    corecore