1,335 research outputs found
Continuity and Change: a human geography of Papua New Guinea
Continuity and Change is the first composite geography of Papua New Guinea to have been produced since the early 1970s. During the past two decades the nation has changed dramatically as it entered into independence and has had to confront the issues and problems of large-scale mining, agricultural and economic restructuring, secessionism, and new environmental and urban issues and problems. At the same time, Papua New Guinea has achieved a high rate of economic growth from a low base level- the highest increase in gross domestic product in the world in 1993.Despite such rapid change, societies throughout Papua New Guinea have sustained many features of their cultures and lifestyles, linking them in a continuity with the past. This book takes a historical geographical view of these themes of change and continuity in the geography and economy of Papua New Guinea, with emphasis on the human geography. Starting from the physical constraints of the country, its changing geography is examined from prehistory, through the historical impacts of the colonial period, to the post-independence issues of urban growth, migration, agricultural restructuring, mining, environmental issues and the political geography of Papua New Guinea. Case studies of societies and places are drawn from all parts of the country, representing a summary of an extensive range of studies9f Papua New Guinean societies
The role of science in physical natural hazard assessment : report to the UK Government by the Natural Hazard Working Group
Following the tragic Asian tsunami on 26 December 2004, the Prime Minister asked
the Governmentβs Chief Scientific Adviser, Sir David King, to convene a group of
experts (the Natural Hazard Working Group) to advise on the mechanisms that could
and should be established for the detection and early warning of global physical
natural hazards.
2. The Group was asked to examine physical hazards which have high global or regional
impact and for which an appropriate early warning system could be put in place. It
was also asked to consider the global natural hazard frameworks currently in place
and under development and their effectiveness in using scientific evidence; to
consider whether there is an existing appropriate international body to pull together
the international science community to advise governments on the systems that need
to be put in place, and to advise on research needed to fill current gaps in knowledge.
The Group was asked to make recommendations on whether a new body was
needed, or whether other arrangements would be more effective
Field testing of a variable rate sprinkler and control system for site-specific water and nutrient application
Development and implementation of site-specific sprinkler irrigation management has been limited due to the lack
of variable rate sprinklers. Thirty-two prototype variable rate sprinklers were constructed and field tested on a three-span
linear-move irrigation system. An algorithm was developed for a distributed control network to allow each sprinkler to be
individually controlled in groups of six or seven along the linear-move lateral. Water application uniformity was monitored
over a 36% to 100% range in application rate. Measured application uniformity equaled or exceeded 90%. Variable rate
nitrogen application was monitored over a 1.1-ha area. Measured nitrogen application rate was within 4% of the target
application rate. Results indicate that the prototype variable rate sprinkler and control system allows water and chemical
application to vary over a 36% to 100% range in application rate with minimal effect on water application uniformity
Field scale performance of a variable rate sprinkler for variable water and nutrient application
A 3-span linear-move irrigation system was equipped with 32 prototype variable rate sprinklers. Water
application uniformity was measured over a 2.7X range in application rate. The measured application
uniformity was 90% or greater for all water application rates. Variable rate nitrogen application was
evaluated on a 1.1 ha area. Variable rate nitrogen application was within 4% of target application. The
variable rate sprinkler allows variable rate water application with minimal effect on water application
uniformity
Laboratory experiments simulating electron cyclotron masers in space
[Abstract unavailable
An assessment of the strength of knots and splices used as eye terminations in a sailing environment
Research into knots, splices and other methods of forming an eye termination has been limited, despite the fact that they are essential and strongly affect the performance of a rope. The aim of this study was to carry out a comprehensive initial assessment of the breaking strength of eye terminations commonly used in a sailing environment, thereby providing direction for further work in the field. Supports for use in a regular tensile testing machine were specially developed to allow individual testing of each sample and a realistic spread of statistical data to be obtained. Over 180 break tests were carried out on four knots (the bowline, double bowline, figure-of-eight loop and perfection loop) and two splices (three-strand eye splice and braid-on-braid splice). The factors affecting their strength were investigated. A statistical approach to the analysis of the results was adopted. The type of knot was found to have a significant effect on the strength. This same effect was seen in both types of rope construction (three-strand and braid-on-braid). Conclusions were also drawn as to the effect of splice length, eye size, manufacturer and rope diameter on the breaking strength of splices. Areas of development and further investigation were identified
Lattice dielectric response of CdCu{3}Ti{4}O{12} and of CaCu{3}Ti{4}O{12} from first principles
Structural, vibrational, and lattice dielectric properties of
CdCu{3}Ti{4}O{12} are studied using density-functional theory within the local
spin-density approximation, and the results are compared with those computed
previously for CaCu{3}Ti{4}O{12}. Replacing Ca with Cd is found to leave many
calculated quantities largely unaltered, although significant differences do
emerge in zone-center optical phonon frequencies and mode effective charges.
The computed phonon frequencies of CdCu{3}Ti{4}O{12} are found to be in
excellent agreement with experiment, and the computed lattice contribution to
the intrinsic static dielectric constant (~60) also agrees exceptionally well
with a recent optical absorption experiment. These results provide further
support for a picture in which the lattice dielectric response is essentially
conventional, suggesting an extrinsic origin for the anomalous low-frequency
dielectric response recently observed in both materials.Comment: 5 pages; uses REVTEX macros. Also available at
http://www.physics.rutgers.edu/~dhv/preprints/lh_cdct/index.htm
Expedition 302 summary
The first scientific drilling expedition to the central Arctic Ocean was completed in September 2004. Integrated Ocean Drilling Program Expedition 302, Arctic Coring Expedition (ACEX), recovered sediment cores to 428 meters below seafloor (mbsf) in water depths of ~1300 m, 250 km from the North Pole.Expedition 302's destination was the Lomonosov Ridge, hypothesized to be a sliver of continental crust that broke away from the Eurasian plate at ~56 Ma. As the ridge moved northward and subsided, marine sedimentation occurred and continues to the present, resulting in what was anticipated from seismic data to be a continuous paleoceanographic record. The elevation of the ridge above the surrounding abyssal plains (~3 km) ensured that sediments atop the ridge were free of turbidites. The primary scientific objective of Expedition 302 was to continuously recover this sediment record and to sample the underlying sedimentary bedrock by drilling and coring from a stationary drillship.The biggest challenge during Expedition 302 was maintaining the drillship's location while drilling and coring in 2β4 m thick sea ice that moved at speeds approaching 0.5 kt. Sea-ice cover over the Lomonosov Ridge moves with one of the two major Arctic sea-ice circulation systems, the Transpolar Drift, and responds locally to wind, tides, and currents. Until now, the high Arctic Ocean Basin, known as "mare incognitum" within the scientific community, had never before been deeply cored because of these challenging sea-ice conditions.Initial results reveal that biogenic carbonate is present only in the HoloceneβPleistocene interval. The upper 198 mbsf represents a relatively high sedimentation rate record of the past 18 m.y. and is composed of sediment with ice-rafted debris and dropstones, suggesting that ice-covered conditions extended at least this far back in time. Details of the ice type (e.g., iceberg versus sea ice), timing, and characteristics (e.g., perennial versus seasonal) await further study. A hiatus occurs at 193.13 mbsf, spanning a 25 m.y. interval from the early Miocene to the middle Eocene between ~18 Ma and 43 Ma. The sediment record during the middle Eocene is of dark, organic-rich biosiliceous composition. Isolated pebbles, interpreted as ice-rafted dropstones, are present down to 239 mbsf, well into this middle Eocene interval. Around the lower/middle Eocene boundary an abundance of Azolla spp. occurs, suggesting that a fresh and/or low-salinity surface water setting dominated the region during this time period. Although predrilling predictions based on geophysical data had placed the base of the sediment column at 50 Ma, drilling revealed that the uppermost Paleocene to lowermost Eocene boundary interval, well known as the Paleocene/Eocene Thermal Maximum (PETM), was recovered. During the PETM, the temperature of the Arctic Ocean surface waters exceeded 20Β°C.Drilling during Expedition 302 also penetrated into the underlying sedimentary bedrock, revealing a shallow-water depositional environment of Late Cretaceous age
Methods
Information assembled in this chapter will help the reader understand the basis for the preliminary conclusions of the Expedition 302 Scientists and will also enable the interested investigator to select samples for further analyses. This information concerns offshore and onshore operations and analyses described in the "Sites M0001βM0004" chapter. Methods used by various investigators for shore-based analyses of Expedition 302 samples will be described in the individual contributions published in the Expedition Research Results and in various professional journals
Sites M0001βM0004
Operations
Mobilization of Vidar Viking, Aberdeen, ScotlandThe Vidar Viking came under contract on 22 July 2004, when mobilization began in Aberdeen, Scotland. Mobilization in Aberdeen included two major installations: a moonpool and a full coring/drilling spread. By 26 July, all equipment for the Vidar Viking had arrived, including information technology equipment bound for the Oden. The derrick was load-tested and certified. The Vidar Viking took on a full complement of fuel at Aberdeen.Test Coring Site: Witch Ground, North SeaThe Vidar Viking set sail for Landskrona, Sweden, on 28 July 2004. While the ship was en route, a first test of the drilling equipment was conducted in the Witch Ground area of the North Sea, ~8 h steam from Aberdeen. A test borehole was drilled in 152 m water depth to a depth of 37 meters below seafloor (mbsf) using the British Geological Survey's (BGS's) advanced piston corer (APC) and extended core barrel. Cores were obtained with both systems. The APC recovered >4 m in all runs (maximum = 4.5 m). The Vidar Viking left the test coring site at 1900 h on 30 July and proceeded to Landskrona.Meanwhile, mobilization of the Oden proceeded at Gothenburg, Sweden, which included loading the laboratory equipment. On the evening of 31 July, the Oden set sail for TromsΓΈ, Norway.Mobilization of Vidar Viking, Landskrona, SwedenThe Vidar Viking reached Landskrona on the morning of 1 August 2004. The stern notch, a 100 ton section required by the Vidar Viking when working in ice, and the helideck were installed. The remaining containers were loaded onto the deck, including the core and European Consortium for Ocean Research Drilling Science Operator curation containers sent from Bremen, Germany. Other mobilization work continued until the morning of 3 August, when the Vidar Viking departed for TromsΓΈ.Mobilization of Vidar Viking and Oden,
TromsΓΈ, NorwayThe Oden arrived in TromsΓΈ on the evening of 5 August 2004. The Vidar Viking arrived on the morning of 7 August. Two helicopters, required for ice reconnaissance missions, landed on the Oden and were secured.Rendezvous of three Expedition 302 shipsExpedition 302 officially began when the Oden left TromsΓΈ, Norway, at 2350 h on 7 August 2004. The Vidar Viking remained in TromsΓΈ for the next 12 h to wait for dynamic positioning spare parts to arrive.The Oden transited to 81Β°56'N, 44Β°59'E to meet the other two ships in the Arctic Coring Expedition (ACEX) fleet for Expedition 302, the Sovetskiy Soyuz and the Vidar Viking, at the edge of the polar ice pack on 10 August. The fleet entered the ice together with the Sovetskiy Soyuz leading, the Oden following, and the Vidar Viking bringing up the rear.Transit to first siteDuring the transit to the operational area, ice reconnaissance and personnel transfer flights began on 12 August 2004. The fleet made unprecedented headway of 8β10 kt in sea ice.The fleet arrived on site at 2350 h on 13 August and began preparations for drilling and operations for maintaining position in sea ice.Preparations for drilling began with clearing ice from the moonpool. Once this was done, a steel skirt was deployed through and below the moonpool to protect the drill string from ice impact below the hull. Once the ice protection skirt was in place, the drill floor and iron roughneck were installed. The drill floor was ready for operations by 0900 h on 15 August.During this time, the fleet's ability to maintain station was tested by positioning the Sovetskiy Soyuz and the Oden upstream of the Vidar Viking. The initial stationkeeping tests were successful, and the Fleet Manager gave approval to start drilling operations at 1100 h on 15 August.Site operationsCores were recovered in five holes (Holes M0002A, M0003A, M0004A, M0004B, and M0004C) (Table T1). Hole M0001A was abandoned after the bottom-hole assembly (BHA) was lost. Logging was attempted in two holes and data were collected in Hole M0004B.Table T2 documents the allocation of time, broken down into (1) waiting for better ice conditions, (2) operational breakdown, and (3) drilling operations.Waiting for better ice conditions was labeled "W." If waiting on ice conditions required pulling pipe and subsequent preparations to begin drilling operations, these times were included in the W category because that time delay was caused by the "waiting for ice" situation. "Breakdown time" is defined as operational time consumed as a result of equipment or mechanical failure. The loss of a BHA, for example, regardless if caused by human error or mechanical failure, necessitated a drill string trip. If the trip time was caused by equipment failure, it was considered as breakdown time "B."Site M0001 (SP 2720 on Line AWI 91090)Site M0001 (shotpoint [SP] 2720 on Line AWI 91090) was reached at 1100 h on 15 August 2004. Later that day during drill string deployment, the high-pressure mud valve on the top drive was damaged. The valve was removed, the rest of the drill string was run, and then the broken valve was replaced. Pipe trips were slowed or stopped intermittently to allow overheated hydraulic fluid in the new drill rig to cool.By 16 August, the drill string was deployed to the seafloor and the first piston corer was deployed at 0600 h. After pumping for 30 min, pressure was not obtained and the piston corer was retrieved without having fired. Damaged seals on the piston corer were replaced. Ice conditions were marginal, and at 0900 h operations were stopped and the drill string was lifted from the seabed. Ice conditions improved by 1400 h, and operations continued. The piston corer was deployed again, and no pressure developed in the drill string. Upon retrieval, the piston corer had not fired. It was suspected that the piston corer had not latched into the BHA. The extended core barrel was then deployed but was not recovered, which indicated that the BHA was lost. At 2000 h, the drill string was tripped to the surface and the BHA and extended core barrel losses were confirmed.Beginning early on 17 August, a new BHA was assembled and lowering of the drill string began. When >800 m was deployed, the high-pressure mud valve on the swivel was damaged during pipe handling. The drill string was tripped to the surface because the operator did not want to risk leaving the drill string hanging in the water column for an unspecified period of time. After completing the pipe trip, the damage was assessed and the Oden's chief engineer was tasked with manufacturing a new valve using materials from a spare pup joint. As an interim solution, a conventional valve assembly was installed, which restricted operations so that no piston core could be deployed.Ice conditions deteriorated between 0900 and 2200 h, and the time was utilized to move the Vidar Viking to a new position (Hole M0002A). Because there were no mud valve spares, the Swedish Polar Research Secretariat began making arrangements for a Swedish Air Force C-130 airdrop of two new valve parts and one conventional valve assembly.Site M0002 (SP 2560 on Line AWI-91090)Based on a strategy developed by the ice management team, the drill string was lowered while drifting onto the location of Site M0002. By 2200 h on 18 August 2004, this strategy put the Vidar Viking within 190 m of the proposed site. The final positioning was done by icebreaking this short distance to Hole M0002A. Once on location at 0820 h, three more drill pipes were added and coring started. Because the mud valve was not yet repaired, the extended core barrel was deployed instead of the APC. A first attempt at coring was unsuccessful, but after adding more pipe and drilling another core run, some core was retrieved. The first core on deck arrived at 1335 h at a water depth of 1209 m. Drilling operations continued throughout the afternoon. The newly fabricated mud valve from the Oden arrived late in the afternoon, and preparations were made for its installation during a wireline trip. The temporary valve was replaced before more drill pipe was added for the next core run. By midnight on 19 August, a depth of 31 mbsf had been reached.Drilling and extended core barrel coring continued until 23 August (Table T1) when the Fleet Manager ordered the drill pipe to be pulled to 40 mbsf because ice conditions had deteriorated. Permission to continue drilling operations was given midday, and operations continued until 2100 h when the ice conditions forced the termination of Hole M0002A at a depth of 271.69 m.The drill string was tripped to the drill deck during the morning of 24 August. After waiting for ice conditions to change in the afternoon, a transit began at 1930 h to a position from which the Vidar Viking could drift onto location while tripping in the drill string.While we waited for improved ice conditions and operations set up for the next site continued, an air gun seismic survey was run from the Oden to tie Site M0002 to the next site (Site M0003).Site M0003 (SP 2521 on Line AWI-91090)The Vidar Viking reached the ice-drift position at 2100 h and awaited ice reconnaissance results. The iron roughneck, which had been removed to repair oil leaks, was installed after repairs; the ice protector skirt was lowered; and the drill floor was prepared. At 2300 h, the BHA and drill collars were run. At 0240 h on 25 August 2004, after 400 m of pipe had been deployed, the housing of the iron roughneck cracked and had to be removed for major repairs. Operations resumed at 1400 h using power tongs. The seafloor was reached at ~2300 h, and at 0110 h on 26 August, the first APC core was recovered from Hole M0003A (Table T1).A second APC core with a shattered liner was recovered. The third APC core became stuck in the BHA. While trying to release the corer, the wireline parted at the mechanical termination, and it was necessary to pull the string. Hole M0003A was terminated at 0440 h.The ice management team conducted ice reconnaissance surveys, reviewed options, and recommended that the fleet move to a location farther west, where a longer-term prediction of relatively good ice could be made. Once the site was selected, the ice team predicted an upstream ice position for the Vidar Viking to start to drift onto the new location. The fleet steamed to the updrift ice position, arriving at 0630 h on 27 August. During this time, wireline termination repair, APC service, and iron roughneck testing and refitting took place.Site M0004 (SP 3006 [Holes M0004A and M0004B] and 3004 [Hole M0004C] on Line AWI-91090)At 0755 h on 27 August 2004 during the pipe trip to the seafloor, the high-pressure mud valve was damaged again. The valve was removed, and the remaining string was run to 1150 m depth while the valve was repaired. At 1800 h, the Vidar Viking was on location (Hole M0004A). Once on station, the repaired mud valve was installed and the drill string was run to the seabed. At 2230 h, drilling operations in Hole M0004A commenced and the hole was advanced by washing ahead to 17 mbsf (Table T1) before a piston corer was deployed.Shortly after midnight on 28 August 2004, the APC became stuck in the BHA but was freed after ~1 h. Once on deck, the plastic liner in the core barrel was found to be shattered and 3.5 m of the core was stuck in the barrel. In light of these problems with the APCβin particular, the risk of junking the hole againβit was decided to switch to extended core barrel coring. Two extended core barrel cores were recovered to a depth of 30.5 mbsf followed by washing to 265 mbsf using the insert bit. This decision to wash ahead was made in order to recover sediment deeper than that recovered in Hole M0002A. By 2240 h, a depth of 265 mbsf was reached.Extended core barrel coring operations continued for the next 3 days (29β31 August), where the hole was advanced at varying rates with good to poor recovery. During this time, the drilling was very slow (e.g., 1 m/h) and recovery in many cores was zero (Cores 302-M0004A-13X through 18X). Different strategies were tried to improve the advance rate. At times, the hole was advanced by washing ahead in an attempt to make faster progress but this strategy was ultimately abandoned after it was found that the washing rate was almost the same as the coring rate. On 31 August from 0200 to 0500 h, for two coring runs in a row no core was recovered. The extended core barrel shoe was switched to a coring shoe for a third attempt at recovery. This coring run cleared a blockage in the bit as evidenced by a large drop in pump pressure. Following this core (with good recovery) and after clearing the blocked bit, core recovery and advancement improved over the next 12 h until basement was reached in Core 302-M0004A-35X. Basement penetration was difficult (8 m penetration in 12 h with low core recovery), and a decision was made at 0900 on 1 September to stop coring at a total depth of 428 mbsf and conduct logging in Hole M0004A.The logging tools were moved to the rig floor, and the tool string (Formation MicroScannerβAccelerator Porosity SondeβNatural Gamma Ray Spectroscopy ToolβScintillation Gamma Ray Tool [FMS-APS-NGT-SGT]) and wireline rig-up proceeded simultaneously. The run into hole commenced at 2130 h. This was done at low speed in order to allow the tools to warm up. Communication with the tool was initially established, and it was lowered to the end of the drill pipe. A computer malfunction caused a communication loss to the tools. The problem was corrected by 0200 h. The tool was powered up, and attempts were made to get the tool to pass through the BHA into the open hole. All efforts failed at the same depth (~1366 meters below rig floor [mbrf]); so, while at rest at this depth, the calipers were opened on the FMS to check whether it was free or lodged. The calipers had some movement, which indicated that the tool string was free.The landing ring for the core barrel is the narrowest section of the whole pipe string (95 mm) and lies ~6 m above the bit. All the logging tools had been checked through a landing ring dockside in Aberdeen, but there was no hole calibration ring on board that could be used as a second check. Sequentially, four more logging attempts were made. Each time, it was assumed that the logging tools were too large in diameter and the string diameter was further reduced by removing the larger diameter components. The APS bowspring was removed first, followed by the knuckle joint. Finally, only the narrowest velocity-density string was deployed, which failed to clear the bit at the same depth as the previous runs. After the fifth attempt failed, the logging time allocated had been consumed and attempts to log Hole M0004A ended at 1045 h on 2 September.After the logging gear was cleared away and the drill string was lifted out of the seabed, preparations were made to start a second hole (Hole M0004B) at the site. During preparations, the inner barrel was deployed but did not latch. After an improvised downhole hammer was deployed and worked for 2 h, a short length of core (~10 cm of mudstone), which had been partially blocking the BHA, was recovered.By 2030 h on 2 September, the Vidar Viking was at the new position for the next hole (Hole M0004B). Coring in Hole M0004B started at a depth of 10 mbsf using the extended core barrel because the APC was deemed too risky. After retrieving the first sample, the hole was washed to 20 mbsf for an in situ temperature measurement. The BGS temperature probe was lowered to the base of the hole, pushed into the sediment, and programmed to record the temperature every 5 s. The probe was left to record temperature for 40 min, after which it was retrieved. Plans to wash to a depth of 215 mbsf, core to 230 mbsf, and then wash to 250 mbsf and log were stymied by problems with drilling pressure lines/gauges freezing at β10?C. Because of these problems and the limited time left, the hole was only advanced to a depth of 220 mbsf. Temperature measurements were made at 60 and 100 mbsf.At 0000 h on 4 September, the pipe was pulled to 65 mbsf to prepare for logging. Rigging of the wireline and tool string occurred concurrently, and rig-up of both was completed by 0415 h. The tool string comprised the FMS-Borehole Compensated Sonic (BHC)-NGT-SGT; the choice of tools was such that it coul
- β¦