330 research outputs found
A Design and Construction of Experimental Teaching Platform on Quality and Competence Training Targeted at Students of Liberal Arts
Aiming at addressing the pervasive problems of university experimental teaching on students of liberal arts in our country, the paper points out the necessity of the construction of experimental teaching platform on qualification and competence education targeted at students of liberal arts. Combining the features of being interdisciplinary, comprehensive and innovative in specialties of tourism management, E-business and Business English, a Blackboard based platform system thus designed and introduced to try to present solutions to the key problems concerning experimental teaching functions and interdisciplinary cooperation etc. Keywords: challenge specialties of liberal arts, interdisciplinary, experimental teaching platfor
Dynamic Reliability Assessment of Heavy Vehicle Crossing a Prototype Bridge Deck by Using Simulation Technology and Health Monitoring Data
Overloads of vehicle may cause damage to bridge structures, and how to assess the safety influence of heavy vehicles crossing the prototype bridge is one of the challenges. In this report, using a large amount of monitored data collected from the structural health monitoring system (SHMS) in service of the prototype bridge, of which the bridge type is large-span continuous rigid frame bridge, and adopting FEM simulation technique, we suggested a dynamic reliability assessment method in the report to assess the safety impact of heavy vehicles on the prototype bridge during operation. In the first place, by using the health monitored strain data, of which the selected monitored data time range is before the opening of traffic, the quasi dynamic reliability around the embedded sensor with no traffic load effects is obtained; then, with FEM technology, the FEM simulation model of one main span of the prototype bridge is built by using ANSYS software and then the dynamic reliability when the heavy vehicles crossing the prototype bridge corresponding to the middle-span web plate is comprehensively analyzed and discussed. At last, assuming that the main beam stress state change is in the stage of approximately linear elasticity under heavy vehicle loads impact, the authors got the impact level of heavy vehicles effects on the dynamic reliability of the prototype bridge. Based on a large number of field measured data, the dynamic reliability value calculated by our proposed methodology is more accurate. The method suggested in the paper can do good for not only the traffic management but also the damage analysis of bridges
Maintenance Management Research of a Large-span Continuous Rigid Frame Bridge Based on Reliability Assessment by Using Strain Monitored Data
When the bridge components needing maintenance are the world problem at present, and the health monitoring system is considered to be a very helpful tool for solving this problem. In this paper, a large number of strain data acquired from the structural health monitoring system (SHMS) installed on a continuous rigid frame bridge are adopted to do reliability assessment. Firstly, a calculation method of punctiform time-dependent reliability is proposed based on the basic reliability theory, and introduced how to calculate reliability of the bridge by using the stress data transformed from the strain data. Secondly, combined with “Three Sigma” principle and the basic pressure safety reserve requirement, the critical load effects distribution function of the bridge is defined, and then the maintenance reliability threshold for controlling the unfavorable load state which appears in the early operation stage of this type bridge is suggested, and then the combination of bridge maintenance management and health monitoring system is realized. Finally, the transformed stress distribution certifies that the load effects of concrete bridges practically have a normal distribution; as for the concrete continuous rigid frame bridge with C50 strength grade concrete, the retrofit reliability threshold should be valued at 6.13. The methodology suggested in this article can help bridge engineers do effective maintenance of bridges, which can effectively extend the service life of the bridge and bring better economic and social benefits
Multi-stage sizing approach for development of utility-scale BESS considering dynamic growth of distributed photovoltaic connection
The battery energy storage system (BESS) is regarded as one of the most promising address operational challenges caused by distributed generations. This paper proposes a novel multi-stage sizing model for utility-scale BESS, to optimize the BESS development strategies for distribution networks with increasing penetration levels and growth patterns of dispersed photovoltaic (PV) panels. Particularly, an integrated model is established in order to accommodate dispersed PVs in short-term operation scale while facilitating appropriate profits in long-term planning scale. Clusterwise reduction is adopted to extract the most representative operating scenarios with PVs and BESS integration, which is able to decrease the computing complexity caused by scenario redundancy. The numerical studies on IEEE 69-bus distribution system verify the feasibility of the proposed multi-stage sizing approach for the utility-scale BESS.</p
General calculation method of power boundary of multiport power electronic transformer
In the multiport power electronic transformer (MPET), cascaded H-bridge (CHB) converters form the medium voltage AC port, while multiple low voltage DC ports are constructed by paralleling dual active bridge (DAB) converters into clusters. Uneven power distribution among these ports leads to power imbalances, risking over modulation in CHB converters with high power generation or load power. This study proposes a general calculation method (GCM) for determining the power boundary of MPETs, enabling the adjustment of reference power for each DC port to prevent over modulation. The GCM is designed to handle scenarios with multiple simultaneous power flow directions. The effectiveness of the GCM is verified by DC port power boundary simulation results of two independent DC bus structure multiport power electronic transformers. The proposed method provides a straightforward approach to calculating power boundary for MPETs with multiple power flow directions, ensuring efficient power management
- …