    Spitzer Warm Mission Transition and Operations

    Get PDF
    Following the successful dynamic planning and implementation of IRAC Warm Instrument Characterization activities, transition to Spitzer Warm Mission operations has gone smoothly. Operation teams procedures and processes required minimal adaptation and the overall composition of the Mission Operation System retained the same functionality it had during the Cryogenic Mission. While the warm mission scheduling has been simplified because all observations are now being made with a single instrument, several other differences have increased the complexity. The bulk of the observations executed to date have been from ten large Exploration Science programs that, combined, have more complex constraints, more observing requests, and more exo-planet observations with durations of up to 145 hours. Communication with the observatory is also becoming more challenging as the Spitzer DSN antenna allocations have been reduced from two tracking passes per day to a single pass impacting both uplink and downlink activities. While IRAC is now operating with only two channels, the data collection rate is roughly 60% of the four-channel rate leaving a somewhat higher average volume collected between the less frequent passes. Also, the maximum downlink data rate is decreasing as the distance to Spitzer increases requiring longer passes. Nevertheless, with well over 90% of the time spent on science observations, efficiency has equaled or exceeded that achieved during the cryogenic mission

    Spitzer Space Telescope observatory planning and scheduling team

    Get PDF
    Launched as the space infrared telescope facility (SIRTF) in August, 2003 and renamed in early 2004, the Spitzer space telescope is performing an extended series of science observations at wavelengths ranging from 3 to 180 microns. The California Institute of Technology is the home of the Spitzer Science Center (SSC) and operates the science operations system (SOS), which supports science operations of the observatory. A key function supported by the SOS is the long-range planning and short-term scheduling of the observatory. This paper describes the role and function of the SSC observatory planning and scheduling team (OPST), its operational interfaces, processes, and tools

    A Mid-Infrared Study of the Class 0 Cluster in LDN 1448

    Get PDF
    We present ground-based mid-infrared observations of Class 0 protostars in LDN 1448. Of the five known protostars in this cloud, we detected two, L1448N:A and L1448C, at 12.5, 17.9, 20.8, and 24.5 microns, and a third, L1448 IRS 2, at 24.5 microns. We present high-resolution images of the detected sources, and photometry or upper limits for all five Class 0 sources in this cloud. With these data, we are able to augment existing spectral energy distributions (SEDs) for all five objects and place them on an evolutionary status diagram.Comment: Accepted by the Astronomical Journal; 26 pages, 9 figure
    corecore