    Radiofrequency and mechanical tests of silver coated CuCrZr contacts for the ITER ion cyclotron antenna

    Get PDF
    The ITER Ion Cyclotron Resonance Heating (ICRH) system is designed to couple to the plasma 20 MW of RF power from two antennas in the 40–55 MHz frequency range during long pulses of up to 3600 s and under various plasma conditions with Edge Localized Modes. Radio-Frequency (RF) contacts are integrated within the ITER ICRH launcher in order to ensure the RF current continuity and ease the mechanical assembly by allowing the free thermal expansion of the Removable Vacuum Transmission Line coaxial conductors during RF operations or during 250 °C baking phases. A material study has been carried out to determine which materials and associated coatings are relevant for RF contacts application in ITER. In parallel, RF tests have been performed with a new prototype of Multi-Contact® LA-CUT/0,25/0 contacts made of silver-coated CuCrZr louvers. During these tests on a RF vacuum resonator, currents between 1.2 kA and 1.3 kA peak have been reached a few tens of times in steady-state conditions without any visible damage on the louvers. A final 62 MHz pulse ending in a 300 s flat top at 1.9 kA resulted in severe damage to the contact. In addition, a test bed which performs sliding test cycles has been built in order to reproduce the wear of the contact prototype after 30 000 sliding cycles on a 3 mm stroke at 175 °C under vacuum. The silver coating of the louvers is removed after approximately a hundred cycles whilst, to the contrary, damage to the CuCrZr louvers is relatively low

    Design and construction of the first ELM resilient long pulse ICRH antenna for WEST

    Full text link
    29th Symposium on Fusion Technology (SOFT), Prague, CZECH REPUBLIC, SEP 05-09, 2016International audienceOne of the key missions of the Ion Cyclotron Resonant Heating (IRCH) system for WEST is to provide sufficient RF heating power in order to obtain a heat flux on the divertor target of 10 MW/m(2) during 1000 s and 20 MW/m(2) during a few tens of seconds. Based on the experience acquired in Tore Supra, the ICRH system has been upgraded for long pulse operation and Edge Localized Modes (ELM) resilience. To achieve this performance, three antennas have been designed through a European collaboration and are now under fabrication at CAS/ASIPP, at the Keye Company, Hefei, in China, within the framework of the Associated Laboratory IRFM-ASIPP. This paper describes the electrical and mechanical design of the antenna, together with the main manufacturing steps and leak test procedure used for validating the water-cooled components. Accessibility and maintenance studies on WEST have been performed with the help of virtual reality. The first ICRH antenna was delivered at Cadarache in July 2016, and is foreseen to be installed on WEST in 2017. (C) 2017 Elsevier B.V. All rights reserved

    R&D activities on RF contacts for the ITER ion cyclotron resonance heating launcher

    Get PDF
    International audienceEmbedded RF contacts are integrated within the ITER ICRH launcher to allow assembling, sliding and to lower the thermo-mechanical stress. They have to withstand a peak RF current up to 2.5 kA at 55 MHz in steady-state conditions, in the vacuum environment of themachine.The contacts have to sustain a temperature up to 250°Cduring several days in baking operations and have to be reliable during the whole life of the launcher without degradation. The RF contacts are critical components for the launcher performance and intensive R&D is therefore required, since no RF contactshave so far been qualified at these specifications. In order to test and validate the anticipated RF contacts in operational conditions, CEA has prepared a test platform consisting of a steady-state vacuum pumped RF resonator. In collaboration with ITER Organization and the CYCLE consortium (CYclotronCLuster for Europe), an R&D program has been conducted to develop RF contacts that meet the ITER ICRH launcher specifications. A design proposed by CYCLE consortium, using brazed lamellas supported by a spring to improve thermal exchange efficiency while guaranteeing high contact force, was tested successfully in the T-resonator up to 1.7 kA during 1200 s, but failed for larger current values due to a degradation of the contacts. Details concerning the manufacturing of the brazed contacts on its titanium holder, the RF tests results performed on the resonator and the non-destructive tests analysis of the contacts are given in this paper

    Ion cyclotron resonance heating systems upgrade toward high power and CW operations in WEST

    Get PDF
    International audienceThe design of the WEST (Tungsten-W Environment in Steady-state Tokamak) Ion cyclotron resonance heating antennas is based on a previously tested conjugate-T Resonant Double Loops prototype equipped with internal vacuum matching capacitors. The design and construction of three new WEST ICRH antennas are being carried out in close collaboration with ASIPP, within the framework of the Associated Laboratory in the fusion field between IRFM and ASIPP. The coupling performance to the plasma and the load-tolerance have been improved, while adding Continuous Wave operation capability by introducing water cooling in the entire antenna. On the generator side, the operation class of the high power tetrodes is changed from AB to B in order to allow high power operation (up to 3 MW per antenna) under higher VSWR (up to 2:1). Reliability of the generators is also improved by increasing the cavity breakdown voltage. The control and data acquisition system is also upgraded in order to resolve and react on fast events, such as ELMs. A new optical arc detection system comes in reinforcement of the V r /V f and SHAD systems

    Radio-frequency electrical design of the WEST long pulse and load-resilient ICRH launchers

    Get PDF
    Three new ion cyclotron resonance heating (ICRH) launchers have been designed for the WEST project (W-Tungsten Environment in Steady-state Tokamak) in order to operate at 3 MW/launcher for 30 s and 1 MW/launcher for 1000 s on H-mode plasmas. These new launchers will be to date the first ICRH launchers to offer the unique combination of continuous-wave (CW) operation at high power and load tolerance capabilities for coupling on H-mode edge. The radio-frequency (RF) design optimization process has been carried out using full-wave electromagnetic solvers combined with electric circuit calculations. Cavity modes occurring between the launchers structures and the vacuum vessel ports have been evaluated and cleared out

    Radio-frequency electrical design of the WEST long pulse and load-resilient ICRH launchers

    Full text link
    Three new ion cyclotron resonance heating (ICRH) launchers have been designed for the WEST project (W-Tungsten Environment in Steady-state Tokamak) in order to operate at 3 MW/launcher for 30 s and 1 MW/launcher for 1000 s on H-mode plasmas. These new launchers will be to date the first ICRH launchers to offer the unique combination of continuous-wave (CW) operation at high power and load tolerance capabilities for coupling on H-mode edge. The radio-frequency (RF) design optimization process has been carried out using full-wave electromagnetic solvers combined with electric circuit calculations. Cavity modes occurring between the launchers structures and the vacuum vessel ports have been evaluated and cleared out