21 research outputs found
Promoting the integration of Engineering, Ecology and Limnology: the Ecohydrological approach applied to Amazon reservoir construction
Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study
A bloom of cyanobacteria (Cylindrospermopsis raciborskii) in UHE Carlos Botelho (Lobo/Broa) reservoir: a consequence of global change?
Limnological and ecological methods: approaches, and sampling strategies for middle Xingu River in the area of influence of future Belo Monte Power Plant
Spatial patterns of water quality in Xingu River Basin (Amazonia) prior to the Belo Monte dam impoundment
Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study
Promoting the integration of Engineering, Ecology and Limnology: the Ecohydrological approach applied to Amazon reservoir construction
Environmental Impact Assessment of reservoir construction: new perspectives for restoration economy, and development: the Belo Monte Power Plant case study
Abstract The Environmental Impact Assessment of reservoir construction can be viewed as a new strategic perspective for the economic development of a region. Based on the principles of a watershed approach a interdisciplinary and multidisciplinary systemic view including biogeophysiographical, economic and socio environmental studies the new vision of a EIA provides a basic substratum for the restoration economy and an advanced model for the true development much well ahead of the modernization aspects of the project of a reservoir construction