28 research outputs found
A Complexity Analysis of Smart Pixel Switching Nodes for Photonic Extended Generalized Shuffle Switching Networks
This paper studies the architectural tradeoffs found in the use of smart pixels for nodes within photonic switching interconnection networks are discussed. The particular networks of interest within the analysis are strictly nonblocking extended generalized shuffle (EGS) networks. Several performance metrics are defined for the analysis, and the effect of node size on these metrics is studied. Optimum node sizes are defined for each of the performance metrics and system-level limitations are identified
Recommended from our members
Application of reservoir characterization and advanced technology to improve recovery and economics in a lower quality shallow shelf carbonate reservoir. End of budget period report, August 3, 1994--December 31, 1996
The Oxy West Welch project is designed to demonstrate how the use of advanced technology can improve the economics of miscible CO{sub 2} injection projects in a lower quality shallow shelf carbonate reservoir. The research and design phase primarily involves advanced reservoir characterization and accelerating the production response. The demonstration phase will implement the reservoir management plan based on an optimum miscible CO{sub 2} flood as designed in the initial phase. During Budget Period 1, work was completed on the CO{sub 2} stimulation treatments and the hydraulic fracture design. Analysis of the CO{sub 2} stimulation treatment provided a methodology for predicting results. The hydraulic fracture treatment proved up both the fracture design approach a and the use of passive seismic for mapping the fracture wing orientation. Although the 3-D seismic interpretation is still being integrated into the geologic model and interpretation of borehole seismic is still underway, the simulator has been enhanced to the point of giving good waterflood history matches. The simulator-forecasted results for an optimal designed miscible CO{sub 2} flood in the demonstration area gave sufficient economics to justify continuation of the project into Budget Period 2