7 research outputs found

    Optimal design of water treatment processes

    Get PDF
    Predicted water shortages assign water treatment a leading role in improving water resources management. One of the main challenges associated with the processes remains early stage design of techno-economically optimised purification. This work addresses the current gap by undertaking a whole-system approach of flowsheet synthesis for the production of water at desired purity at minimum overall cost. The optimisation problem was formulated as a mixed-integer non-linear programming model. Two case studies were presented which incorporated the most common commercial technologies and the major pollution indicators, such as chemical oxygen demand, dissolved organic carbon, total suspended solids and total dissolved solids. The results were analysed and compared to existing guidelines in order to examine the applicability of the proposed approach

    Post-disaster multi-period road network repair: work scheduling and relief logistics optimization

    No full text
    We develop a multi-period bi-level programming model for the post-disaster road network repair work scheduling and relief logistics problem. A maximum relative satisfaction degree-based steady-state parallel genetic algorithm is designed to solve this model. In order to validate and test the effectiveness of the presented mathematical model and method, we use a network generator to create numerical examples with different scales and characteristics of road network. Our numerical analysis of the solutions shows that the proposed mathematical model and method can effectively assist the decision-makers to deal with the road network repair work scheduling and relief logistics optimization problem during the emergency response phase. This mathematical model and the approach being developed are applied to deal with the case of Wenchuan earthquake in China. The results show that the required CPU time is short enough such that it meets the time limitation in the emergency response phase, and the strategy of road network repair scheduling will allow repair of the damaged roads to be completed before the end of the planning time horizon by 14.93%. Furthermore, the strategy of relief logistics can provide an efficient relief allocation and transportation path
    corecore