3 research outputs found

    Application of the HDM-4 model on local road network: case study of the Herzegovina-Neretva Canton in Bosnia and Herzegovina

    Get PDF
    The World Bank Highway Development and Management (HDM-4) tool has been used extensively for the management of road networks, particularly in developing countries. The paper describes the application of HDM-4 model for local roads in Bosnia and Herzegovina (BiH), in the Herzegovina-Neretva Canton (HNC). The HDM-4 study was performed with the aim to define road works program and investment priorities by analyzing impacts of different budgets on future network condition. The 396 km-long HNC road network consists of 13 roads that are either graveled or paved. A large part of these roads do not have sufficient pavement width. This road network is in relatively poor condition due to its age (the average age is over 30 years) and limited spending on maintenance in the past. Only a small percentage of the network has been reconstructed in recent years. The Average Annual Daily Traffic (AADT) has a wide range, and varies from 27 to 12735 vpd. The major challenge in the study was to obtain HDM-4 input data with limited resources, since usually this task requires extensive investigations. In addition to inventory data, it is necessary to define the condition of the road network, traffic volume, traffic data, etc. Road geometry data were obtained from previous studies and project documentations. The IRI data were taken from the earlier surveys or estimated where no data were available. Other parameters were obtained by field tests. Traffic data were available from regular network traffic counts. After analyzing the parameters, the network was divided into 65 homogeneous sections, based on the AADT and road condition (IRI and other parameters) classes. HDM-4 program analysis was performed for a period of 30 years. Due to very low traffic loading and relatively large investment needed for improvement, for majority of sections a negative NPV and IRR were obtained for maintenance alternatives other than routine maintenance, and for significant number of sections they were on the verge. Out of 65 homogeneous sections, only 29 sections proved cost-effective (NPV/CAP ratio is positive). The implementation of developed road work programs would result in a substantial improvement of the overall network condition. The IRI of paved road network would change from current value of 4.5 m/km to 4.0 m/km and 3.7 m/km for budget levels of 2.0 and 3.0 mill. BAM after five years. The better road network condition would also result in improved traffic safety, social and economic impacts, since many of these roads are crucial links in the HNC
    corecore