4 research outputs found
μΈκ³νμ 21μΈκΈ°λ₯Ό μν λ² : μ 3μ£Όμ λ°νλ Όλ¬Έ ; μ λ½λ²μ μΌλ°μμΉμΌλ‘μ λΉλ‘μμΉκ³Ό μ 뒰보νΈμμΉ
μ§κΈκΉμ§ μ λ½ν΅ν©κ³Όμ μμ μκΈ΄ κ΅κ°λλ§Ήλ€μ μΈκ³λ³΄νΈμ μΌλ‘ μ μ©λ μ μλ 곡λ²μ μμΉλ€μ κ°λ°νλ λ°μ λ§€μ° μ ν©ν μ€νμμμ΄λΌκ³ ν μ μλ€. μλνλ©΄ μ΄λ€ κ΅κ°λλ§Ήκ³Όμ μμ κ²½μ , νκ²½ λ° κΈ°ν μ¬λ¬ λ¬Έμ λ€μ λνμ¬ μλ°μ λ²κ·λ€μ΄ μ μ λμμ λΏλ§ μλλΌ, λͺλͺκ°μ μΌλ°μ λ²μμΉλ€μ΄ κ°λ°λκ³ μΉμΈλμκΈ° λλ¬Έμ΄λ€. μ΄λ¬ν λ²μμΉλ€μ΄ ν¨λ ₯μ κ°κ³ μ μ©λ¨μΌλ‘μ¨ λ€μ κ΅κ°λ€μ λ²μ§μκ° κ²°ν©λκ³ μλ€. μ λ½μ°ν©(Europaische Union)μ μ£Όμ§νλ λ°μ κ°μ΄ μλ―Όκ³Ό κΈ°μ
μμ λνμ¬ μ§μ ν¨λ ₯μ κ°λ -ν κ΅κ°μ λ²μ§μμ μ μ¬ν- κ³ μ ν λ²μ§μλ₯Ό κ°κ³ μλ€. μ λ½μ°ν©μ νμ¬ 15κ° κ΅κ°λ‘ ꡬμ±λμ΄ μκ³ μ₯μ°¨ λ κ°μ
κ΅μ΄ νλλ¨ μ λ§μ΄λ€. μ λ½μ°ν©μ μ΄λ£¨λ μ΅μ΄μ κ·Έλ¦¬κ³ κ°μ₯ μ€λλ μ§μ£Όλ μ λ½κ³΅λ체(Europaische Gemeinschaft)μΈλ°, μ°λ¦¬λ κ·Έ λ²μ§μλ₯Ό μ λ½κ³΅λ체λ²(europaisches Gemeinschaftsrecht)μ΄λΌκ³ λΆλ₯΄κ³ μλ€. μ€λ λ°νμμ μ£Όλ‘ μ΄ μ λ½κ³΅λ체λ²μ λ€λ£¨κ² μΌλ, μ λ½κ΅κ°λ€λ‘ μ΄λ£¨μ΄μ§ λ³΄λ€ ν° κ·λͺ¨μ λ λ€λ₯Έ λλ§Ή, μ¦ νμ¬ 40κ° κ΅κ°κ° κ°μ
λ μ λ½νμν(Europarat)μ λν΄μλ μΈκΈνκ³ μ νλ€. μ λ½νμνλ μ λ½ν΅ν©μ μμ΄ κ°μ₯ μ€λλ μ‘°μ§μ²΄μ΄λ€. 1950λ
μ΄ μ λ½νμνμμ μ λ½μΈκΆνμ½(Eurpaiache Menschenrechte-Konvention)μ΄ λ€μκ΅μ κ³μ½μΌλ‘μ 체결λμλ€. μ λ½μΈκΆνμ½μ μΌμ ν κΈ°λ³ΈκΆλ€μ ν¨λ ₯μ κ·μ νκ³ μμ λΏλ§ μλλΌ κΈ°λ³ΈκΆλ³΄νΈλ₯Ό μν μ체 κΈ°κ΄, μ¦ μΈκΆλ³΄νΈλ₯Ό μν μμνμ λ²μμ μ€μΉνκ³ μλ€. μ΄ λ²μμ νλ‘λ μ€λ λ°νμμ μμΈν λ€λ£¨κ² λ λΉλ‘μμΉμ λ§€μ° νλΆν κ·Όμμ μ΄λ£¬λ€
FIDIC - A Guide for Practitioners
In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design Build and Turnkey Contract (the 1992 range Book). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so called Red Book, for works designed by the Employer l Plant and Design Build, the so called Yellow Book, for works designed by the Contractor l EPC/Turnkey Projects, the so called Silver Book, for works designed by the Contractor The first is intended for construction works where the Employer is responsible for the design, as for per the previous so called Red Book 4th Edition (1987), with an important role for the Engineer. The other two conditions of contract are intended for situations when the Contractor is responsible for the design. The Plant and Design-Build Contract has the traditional Engineer while the EPC/Turnkey Contract has a two party arrangement, generally with an Employer's Representative as one of the parties.xxxv+443p.;16,5x24c