378 research outputs found

    The Foresight Bias in Monte-Carlo Pricing of Options with Early

    Get PDF
    In this paper we investigate the so called foresight bias that may appear in the Monte-Carlo pricing of Bermudan and compound options if the exercise criteria is calculated by the same Monte-Carlo simulation as the exercise values. The standard approach to remove the foresight bias is to use two independent Monte-Carlo simulations: One simulation is used to estimate the exercise criteria (as a function of some state variable), the other is used to calculate the exercise price based on this exercise criteria. We shall call this the numerical removal of the foresight bias. In this paper we give an exact definition of the foresight bias in closed form and show how to apply an analytical correction for the foresight bias. Our numerical results show that the analytical removal of the foresight bias gives similar results as the standard numerical removal of the foresight bias. The analytical correction allows for a simpler coding and faster pricing, compared to a numerical removal of the foresight bias. Our analysis may also be used as an indication of when to neglect the foresight bias removal altogether. While this is sometimes possible, neglecting foresight bias will break the possibility of parallelization of Monte-Carlo simulation and may be inadequate for Bermudan options with many exercise dates (for which the foresight bias may become a Bermudan option on the Monte-Carlo error) or for portfolios of Bermudan options (for which the foresight bias grows faster than the Monte-Carlo error). In addition to an analytical removal of the foresight bias we derive an analytical correction for the suboptimal exercise due to the uncertainty induced by the Monte-Carlo error. The combined correction for foresight bias (biased high) and suboptimal exercise (biased low) removed the systematic bias even for Monte-Carlo simulations with very small number of paths.Monte Carlo, Bermudan, Early Exercise, Regression, Least Square Approximation of Conditional Expectation, Least Square Monte Carlo, Longstaff-Schwartz, Perfect Foresight, Foresight Bias

    Aminoacyltransferase Stimulation of Protein Synthesis by Pig Adrenal Polysomes

    Get PDF

    Proxy simulation schemes using likelihood ratio weighted Monte Carlo for generic robust Monte-Carlo sensitivities and high accuracy drift approximation (with applications to the LIBOR Market Model)

    Get PDF
    We consider a generic framework for generating likelihood ratio weighted Monte Carlo simulation paths, where we use one simulation scheme K° (proxy scheme) to generate realizations and then reinterpret them as realizations of another scheme K* (target scheme) by adjusting measure (via likelihood ratio) to match the distribution of K° such that E( f(K*) | F_t ) = E( f(K°) w | F_t ). This is done numerically in every time step, on every path. This makes the approach independent of the product (the function f) and even of the model, it only depends on the numerical scheme. The approach is essentially a numerical version of the likelihood ratio method [Broadie & Glasserman, 1996] and Malliavin's Calculus [Fournie et al., 1999; Malliavin, 1997] reconsidered on the level of the discrete numerical simulation scheme. Since the numerical scheme represents a time discrete stochastic process sampled on a discrete probability space the essence of the method may be motivated without a deeper mathematical understanding of the time continuous theory (e.g. Malliavin's Calculus). The framework is completely generic and may be used for high accuracy drift approximations and the robust calculation of partial derivatives of expectations w.r.t. model parameters (i.e. sensitivities, aka. Greeks) by applying finite differences by reevaluating the expectation with a model with shifted parameters. We present numerical results using a Monte-Carlo simulation of the LIBOR Market Model for benchmarking.Monte-Carlo, Likelihood Ratio, Malliavin Calculus, Sensitivities, Greeks

    Specific measures for older employees and late career employment

    Get PDF
    We analyse the effects of specific measures for older employees (SMOE) on employment duration of workers aged 40 and above. Using longitudinal employer-employee data for German establishments, we account for worker and establishment heterogeneity and correct for stock-sampling. We find a positive effect of mixed-aged team work on employment duration and a negative effect of a part-time scheme addressed at older workers. Employment duration does not appear to be related to other SMOE, such as training and specific equipment of workplaces
    corecore