3 research outputs found

    Kenbrook Bridge Project

    Get PDF
    The Kenbrook Bridge Team seeks to address Kenbrook Bible Camp’s need for maintenance and emergency access across a small stream on the property that separates their main office location from cabins on the northwestern portion of the campus. Kenbrook Bible Camp\u27s mission is to facilitate a closer connection to God, self, others, and nature for all guests. The bridge site was selected by the Kenbrook staff based on the greatest need for accessibility. An existing footbridge in this location cannot support passage of heavy equipment used for camp maintenance nor the ATV used for emergency response. The bridge team proposes a 16-foot-long by 8-foot-wide concrete culvert for the site. The culvert has been designed in compliance with AASHTO structural requirements and all elements of the structure are detailed in a complete drawings sheet set, serving as a reference for on-site construction in May. Funding for this work provided by The Collaboratory for Strategic Partnerships and Applied Research.https://mosaic.messiah.edu/engr2022/1001/thumbnail.jp

    Panama Bridge Project

    Get PDF
    The Panama Bridge project has partnered with Rio Missions Panama to design a bridge for the village of La Gigi, Panama. The mountain community of La Gigi experiences heavy rainfall during the rainy seasons. A stream runs along the community, restricting their access to schools, employment options, and other communities. While passable during dry seasons, the stream floods and becomes impassable after heavy rains. The residents are effectively cut off from their livelihoods, church, health services, and other communities during this time. To accommodate this need, the Panama Bridge Team has spent the last two academic years designing a 90 foot aluminum truss bridge. The design includes a unique construction strategy to deal with challenging site constraints.https://mosaic.messiah.edu/engr2021/1011/thumbnail.jp
    corecore