1 research outputs found

    Mendocino power plant site ecological study final report

    Get PDF
    A preoperational ecological study of a proposed nuclear power plant site on the Mendocino County coast was initiated in September 1971. The study resulted from an agreement between the Pacific Gas and Electric Company and the California Department of Fish and Game signed in July 1971. In the agreement, Pacific Gas and Electric Company provided funds for the Department's studies of the site. Studies of the subtidal animal and plant communities were conducted by divers from September 1971 through March 1973; intertidal animal and plant populations were surveyed from November 1971 through February 1973. Sportfisheries for abalone and finfish were surveyed during 1972 and Spring of 1973. Stomach contents of many of the more abundant subtidal and intertidal fishes were examined. All of these studies were designed to determine the dominant species of plants, invertebrates and fishes in the various communities, their relative abundance, and where applicable, size composition, predators and competitors. The parameters developed from these studies would be used for comparison with similar studies conducted after the proposed plant went into operation to determine what effect construction and operation of the plant might have on the various plants and animals studied. (291pp.
    corecore