    An Integration Testing Facility for the CERN Accelerator Controls System

    Get PDF
    A major effort has been invested in the design, development, and deployment of the LHC Control System. This large control system is made up of a set of core components and dependencies, which although tested individually, are often not able to be tested together on a system capable of representing the complete control system environment, including hardware. Furthermore this control system is being adapted and applied to CERN's whole accelerator complex, and in particular for the forthcoming renovation of the PS accelerators. To ensure quality is maintained as the system evolves, and toimprove defect prevention, the Controls Group launched a project to provide a dedicated facility for continuous, automated, integration testing of its core components to incorporate into its production process. We describe the project, initial lessons from its application, status, and future directions

    Installation and Hardware commissioning of the Multi-Turn extraction at the CERN proton synchrotron

    Get PDF
    The implementation of the new Multi-Turn Extraction (MTE) at the CERN Proton Synchrotron required major hardware changes for the nearly 50-year old accelerator. The installation of new Pulse Forming Networks (PFN) and refurbished kicker magnets for the extraction, new sextupole and octupole magnets, new power converters, together with an in-depth review of the machine aperture leading to the design of new vacuum chambers was required. As a result, a heavy programme of interventions had to be scheduled during the winter shut-down 2007-8. The newly installed hardware and its commissioning is presented and discussed in details

    Layout Instrumentation LPI: 1ere Partie: LIL

    No full text

    Oadc g64 module

    No full text
    corecore