20 research outputs found

    Guardrail-Bridge Rail Transition Designs, Volume I: Research Report

    Get PDF
    DTFH61-83-C-00028This project was concerned with the transition designs used between w-beam and the guardrail, and rigid bridge rail parapets or wingwalls. State designs submitted to the federal highway administration (FHWA) were rated and designs selected for crash test evaluation. New designs were also formulated and subjected to crash test evaluation. Most of the crash tests were conducted with 4500 lb (2000 kg) cars at 60 mph (95 km/h) and a 25 degree angle. Design drawings are presented along with recommendations for use of these transition designs. Guidelines for transition features are given and design procedures for independent end blocks are given

    Development of a cost-effectiveness model for guardrail selection. Volume I: technical documentation. Final report.

    No full text
    Federal Highway Administration, Office of Research and Development, Washington, D.C.Mode of access: Internet.Author corporate affiliation: Southwest Research Institute, San Antonio, Tex.Report covers the period June 1975-Dec 1978Subject code: CDISubject code: SCE*CSubject code: WNBSubject code: WW

    The Analysis Of Laminated Composite Structures

    No full text
    xii;p 222;index;23 c

    A comparison of high-speed photography and accelerometer data-reduction techniques

    No full text

    Determination of the operational performance requirementa for a roadside accident countermeasure warrant system. Volume III - appendices.

    No full text
    Federal Highway Administration, Office of Safety and Traffic Operations Research and Development, McLean, Va.Mode of access: Internet.Author corporate affiliation: Southwest Research Institute, San Antonio, Tex.Report covers the period Oct 1978 - April 1985Subject code: CDISubject code: CRBSubject code: JBSubject code: XPSubject code: YC

    Determination of the operational performance requirements for a roadside accident countermeasure warrant system. Volume I - executive summary. Final report.

    No full text
    Federal Highway Administration, Office of Safety and Traffic Operations Research and Development, McLean, Va.Mode of access: Internet.Author corporate affiliation: Southwest Research Institute, San Antonio, Tex.Report covers the period Oct 1978 - April 1985Subject code: CDISubject code: CRBSubject code: JBSubject code: XPSubject code: YC

    Determination of the operational performance requirements for a roadside accident countermeasure warrant system. Volume II - technical documentation. Final report.

    No full text
    Federal Highway Administration, Office of Safety and Traffic Operations Research and Development, McLean, Va.Mode of access: Internet.Author corporate affiliation: Southwest Research Institute, San Antonio, Tex.Report covers the period Oct 1978 - April 1985Subject code: CRBSubject code: JLRSubject code: JLSSubject code: WOB*

    Bridge Rail Designs and Performance Standards, Volume I: Research Report

    No full text
    DTFH61-84-C-00002This project evaluated bridge railings. State bridge rail designs submitted to the Federal Highway Administration (FHWA) were rated and the best of each type were selected for crash test evaluation. When necessary, the designs were improved and retested. Most of the crash tests were conducted with 4500-lb (2025-kg) cars at 60 mph (95 km/h) and a 25-degree angle and 1800-lb (800-kg) cars at 60 mph (95 km/h) and a 20-degree angle. Performance standards proposed in 1986 are presented, along with bridge railing geometric design considerations to minimize vehicle snagging. Design drawings of the successfully tested bridge rails are included
    corecore