6 research outputs found
Recommended from our members
4MOST: the 4-metre multi-object spectroscopic telescope project in the assembly, integration and test phase
4MOST is a new high-multiplex, wide-field spectroscopic survey facility under construction for ESO's 4m-VISTA telescope at Paranal, Chile. Its key specifications are: a large field of view of 4.4 square degrees, a high multiplex fibre positioner based on the tilting spine principle that positions 2436 science fibres in the focal surface of which 1624 fibres go to two low-resolution optical spectrographs (R = λ/Δλ ~ 6500) and 812 fibres transfer light to the high-resolution optical spectrograph (R ~ 20,000). Currently, almost all subsystems are completed and full testing in Europe will be finished in spring 2023, after which 4MOST will be shipped to Chile. An overview is given of instrument construction and capabilities, the planned science of the consortium and the recently selected community programmes, and the unique operational scheme of 4MOST
4MOST : the 4-metre multi-object spectroscopic telescope project in the assembly, integration, and test phase
4MOST is a new high-multiplex, wide-field spectroscopic survey facility under construction for ESO's 4m-VISTA telescope at Paranal, Chile. Its key specifications are: a large field of view of 4.4 square degrees, a high multiplex fibre positioner based on the tilting spine principle that positions 2436 science fibres in the focal surface of which 1624 fibres go to two low-resolution optical spectrographs (R = λ/Δλ ~ 6500) and 812 fibres transfer light to the high-resolution optical spectrograph (R ~ 20,000). Currently, almost all subsystems are completed and full testing in Europe will be finished in spring 2023, after which 4MOST will be shipped to Chile. An overview is given of instrument construction and capabilities, the planned science of the consortium and the recently selected community programmes, and the unique operational scheme of 4MOST
4MOST Scientific Operations
The 4MOST instrument is a multi-object spectrograph that will address Galactic and extragalactic science cases simultaneously by observing targets from a large number of different surveys within each science exposure. This parallel mode of operation and the survey nature of 4MOST require some distinct 4MOST- specific operational features within the overall operations model of ESO. The main feature is that the 4MOST Consortium will deliver, not only the instrument, but also contractual services to the user community, which is why 4MOST is also described as a facility. This white paper concentrates on information particularly useful to answering the forthcoming Call for Letters of Intent
4MOST-4-metre Multi-Object Spectroscopic Telescope
4MOST is a wide-field, high-multiplex spectroscopic survey facility under development for the VISTA telescope of the European Southern Observatory (ESO). Its main science drivers are in the fields of galactic archeology, high-energy physics, galaxy evolution and cosmology. 4MOST will in particular provide the spectroscopic complements to the large area surveys coming from space missions like Gaia, eROSITA, Euclid, and PLATO and from ground-based facilities like VISTA, VST, DES, LSST and SKA. The 4MOST baseline concept features a 2.5 degree diameter field-of-view with similar to 2400 fibres in the focal surface that are configured by a fibre positioner based on the tilting spine principle. The fibres feed two types of spectrographs; similar to 1600 fibres go to two spectrographs with resolution R> 5000 (lambda similar to 390-930 nm) and similar to 800 fibres to a spectrograph with R> 18,000 (lambda similar to 392-437 nm & 515-572 nm & 605-675 nm). Both types of spectrographs are fixed-configuration, three-channel spectrographs. 4MOST will have an unique operations concept in which 5 year public surveys from both the consortium and the ESO community will be combined and observed in parallel during each exposure, resulting in more than 25 million spectra of targets spread over a large fraction of the southern sky. The 4MOST Facility Simulator (4FS) was developed to demonstrate the feasibility of this observing concept. 4MOST has been accepted for implementation by ESO with operations expected to start by the end of 2020. This paper provides a top-level overview of the 4MOST facility, while other papers in these proceedings provide more detailed descriptions of the instrument concept[1], the instrument requirements development[2], the systems engineering implementation[3], the instrument model[4], the fibre positioner concepts[5], the fibre feed[6], and the spectrographs[7]