111 research outputs found
New computational results for the nurse scheduling problem: A scatter search algorithm
In this paper, we present a scatter search algorithm for the well-known nurse scheduling problem (NSP). This problem aims at the construction of roster schedules for nurses taking both hard and soft constraints into account. The objective is to minimize the total preference cost of the nurses and the total penalty cost from violations of the soft constraints. The problem is known to be NP-hard. The contribution of this paper is threefold. First, we are, to the best of our knowledge, the first to present a scatter search algorithm for the NSP. Second, we investigate two different types of solution combination methods in the scatter search framework, based on four different cost elements. Last, we present detailed computational experiments on a benchmark dataset presented recently, and solve these problem instances under different assumptions. We show that our procedure performs consistently well under many different circumstances, and hence, can be considered as robust against case-specific constraints. Keywords: meta-heuristics, scatter search, nurse schedulin
The impact of environmental uncertainty on the performance of the rice supply chain in the Ayeyarwaddy Region, Myanmar
In this paper, we study the relationship between environmental uncertainty and performance in the rice supply chain in the Ayeyarwaddy Region, Myanmar. Efficiency is one of the important performance indicators in both supply chain and agribusiness. In this regard, the objectives of the study are to identify the different sources of uncertainty perceived by the different actors in the supply chain, to measure the rice supply chain efficiency, and to study the impact of the environmental uncertainty on the supply chain efficiency. The data of 215 respondents is collected from the Ayeyarwaddy Region by using a purposive and stratified random sampling method, and we analyze this data via descriptive statistics, an exploratory factor analysis, data envelopment analysis (DEA), and Tobit regression analysis. The scores for the technical, pure, and scale efficiency show a very low performance of the rice supply chain in the Ayeyarwaddy Region resulting from the fact that most of the rice businesses are too small and need to expand their operating size. We found that this global rice supply chain performance is significantly impacted by the planning and control uncertainty and the climate uncertainty. Therefore, mitigation initiatives must be developed such as financial insurance mechanisms and extension services should be widespread. Both aim to improve the impact of the climate adverse conditions and to increase the efficiency of resource utilization in the supply chain. Moreover, the actors should organize themselves in cooperatives such that the scale of operations can be increased and information is captured and shared between different parties in the supply chain. This is crucial to operational control and planning because a higher quality of information input will increase the quality of managerial decision making
A heuristic procedure to solve the project staffing problem with discrete time/resource trade-offs and personnel scheduling constraints
Highlights • Project staffing with discrete time/resource trade-offs and calendar constraints. • An iterated local search procedure is proposed. • Different problem decomposition techniques are applied. Abstract When scheduling projects under resource constraints, assumptions are typically made with respect to the resource availability and activities are planned each with its own duration and resource requirements. In resource scheduling, important assumptions are made with respect to the staffing requirements. Both problems are typically solved in a sequential manner leading to a suboptimal outcome. We integrate these two interrelated scheduling problems to determine the optimal personnel budget that minimises the overall cost. Integrating these problems increases the scheduling flexibility, which improves the overall performance. In addition, we consider some resource demand flexibility in this research as an activity can be performed in multiple modes. In this paper, we present an iterated local search procedure for the integrated multi-mode project scheduling and personnel staffing problem. Detailed computational experiments are presented to evaluate different decomposition heuristics and comparison is made with alternative optimisation techniques
- …