Tests of Fermilab built 40 mm aperture full length SSC dipole magnets
Several 40 mm aperture, 17 m long dipoles have been built by Fermilab as developmental prototypes for the Superconducting Super Collider. These magnets differ from those manufactured at Brookhaven National Laboratory in that they have an external inner-outer coil splice design, a collet style end clamp assembly, a new, analytically designed minimum stress coil end design, and a new insulation system which does not employ shims or shoes''. In addition, the magnets were built using production-style tooling. The magnets were tested at the Fermilab Magnet Testing Facility. Quench testing and mechanical measurement results are presented and analyzed with emphasis on the new design and fabrication features of these magnets. 13 refs., 5 figs
Recommended from our members
Fermilab R and D test facility for SSC (Superconducting Super Collider) magnets
The test facility used for R and D testing of full scale development dipole magnets for the SSC is described. The Fermilab Magnet Test Facility, originally built for production testing of Tevatron magnets, has been substantially modified to allow testing also of SSC magnets. Two of the original six test stands have been rebuilt to accommodate testing of SSC magnets at pressures between 1.3 Atm and 4 Atm and at temperatures between 1.8 K and 4.8 K and the power system has been modified to allow operation to at least 8 kA. Recent magnets have been heavily instrumented with voltage taps to allow detailed study of quench location and propagation and with strain gage based stress, force and motion transducers. A data acquisition system has been built with a capacity to read from each SSC test stand up to 220 electrical quench signals, 32 dynamic pressure, temperature and mechanical transducer signals during quench and up to 200 high precision, low time resolution, pressure, temperature and mechanical transducer signals. The quench detection and protection systems is also described. 23 refs., 4 figs., 2 tabs
Recommended from our members
Full length SSC R and D dipole magnet test results
Four full scale SSC development dipole magnets have been tested for mechanical and quench behavior. Two are of a design similar to previous magnets but contain a number of improvements, including more uniform coil size, higher pre-stress and a redesigned inner-outer coil splice. One exceeds the SSC operating current on the second quench but the other appears to be limited by damaged superconductor to a lower current. The other two magnets are of alternate designs. One trains erratically and fails to reach a plateau and the other reaches plateau after four quenches. 12 refs., 4 figs
Recommended from our members
Magnetic field measurements of 1.5 meter model SSC collider dipole magnets at Fermilab
Magnetic field measurements have been performed at Fermilab on 1.5 m magnetic length model dipoles for the Superconducting Supercollider. Harmonic measurements are recorded at room temperature before and after the collared coil is assembled into the yoke and at liquid helium temperature. Measurements are made as a function of longitudinal position and excitation current. High field data are compared with room temperature measurements of both the collared coil and the completed yoked magnet and with the predicted fields for both the body of the magnet and the coil ends
Recommended from our members
Measurements of beam pipe eddy current effects in Main Injector dipole magnets
The dipole magnets for the proposed Main Injector project at Fermilab are designed to ramp to maximum field (1.7 T) at rates over 2.5 T/s. These ramp rates will produce eddy current effects which degrade overall field quality. A harmonics probe was constructed for the purpose of measuring eddy current field components during the ramp cycle. Three separate ramp rates were employed ranging from 1.3 T/s to 2.7 T/s. Tests were performed using beam pipes with two different resistivities. The dominant multipole contribution resulting from eddy current effects in each beam pipe was sextupole. The sextupole component closely matched the calculated prediction
Software Design for a Database Driven System for Accelerator Magnet Measurements
Measurements of more than 1000 new magnets are needed for the Main Injector Project at Fermilab. In order to achieve efficiency and accuracy in measurements, we chose a database driven design for control of the measurement system. We will use a relational database to describe the measurement subjects and equipment. A logbook system defined in the database will provide for prescription of measurements to be carried out, description of measurements as they are carried out, and a comment database for less structured information. The operator interface will be built on X-windows. This paper will describe our system design. 2 refs
Mechanical Behavior of Fermilab/General Dynamics Built 15M SSC Collider Dipoles
A series of full-scale demonstration SSC collider dipole magnets were built for the ASST. These magnets, DCA311 through DCA319, have 50 mm aperture and 15 m magnetic length with 6.6 Tesla uniform field. For the support structure of the W6733B cross section, the Fermilab design uses a vertical split in the yoke. The end sections of the magnet have solid spacers and are supported by collet clamps. The splices between inner and outer coils are made in preforms which lie outside of the high field region. The magnets were produced in pipeline fashion with no intentional major changes between magnets. As a part of the technology transfer program, the last 7 magnets were built by General Dynamics personnel using the magnet construction facilities of Fermilab, while the first two magnets were built entirely by Fermilab personnel. At present, the magnets up to DCA316 have been tested at Fermilab. The general characteristics of the magnets have been quite satisfactory. Both of the Fermilab built magnets have reached the conductor limited field strength with no significant training. Two of the General Dynamics built magnets each required a single training quench. However, all of the magnets tested up to date meet the ASST specifications. This report describes the mechanical properties of the ASST magnets at Fermilab based on the currently available test results
Recommended from our members
Magnetic field angle changes during manufacture and testing of SSC collider dipoles
Measurements of the magnetic field angle along the length of collider dipole magnets are discussed. These superconducting magnets were built at Fermilab for the Superconducting Super Collider (SSC) by Fermilab and General Dynamics personnel. These measurements were made at four stages in the assembly and test sequence. The data show-that changes can occur both during installation in the cryostat and as a result of cold testing. Most of the changes during installation are correlated with the welding of the tie bar restraints. But the changes observed as a result of the cold testing can be attributed to changes in the magnetization of the iron laminations
Recommended from our members
Magnetic field measurements of 1. 5 meter model SSC collider dipole magnets at Fermilab
Magnetic field measurements have been performed at Fermilab on 1.5 m magnetic length model dipoles for the Superconducting Supercollider. Harmonic measurements are recorded at room temperature before and after the collared coil is assembled into the yoke and at liquid helium temperature. Measurements are made as a function of longitudinal position and excitation current. High field data are compared with room temperature measurements of both the collared coil and the completed yoked magnet and with the predicted fields for both the body of the magnet and the coil ends
Quench Performance of Fermilab/General Dynamics Built Full Length SSC Collider Dipole Magnets
In this paper we present results of quench testing of full length SSC dipole magnets at Fermilab. The data are from the first six of a series of thirteen 15 m long, 50 mm aperture SSC dipole magnets which are being built and tested at Fermilab. These magnets were designed jointly by Fermilab, Brookhaven Laboratory, Lawrence Berkeley Laboratory and the SSC laboratory. Among the major goals for this series of magnets are to transfer magnet production technology to the lead vendor for the Collider Dipole Magnet, the General Dynamics Corporation, and to demonstrate industrial production by the vendor. The first magnet in the series, DCA311, was built by Fermilab technicians to establish assembly procedures. The second magnet, DCA312, was the ''technology transfer magnet'' and was built jointly by Fermilab and General Dynamics technicians. The next seven, DCA313- 319 are being built by General Dynamics personnel using Fermilab facilities and procedures. However, Fermilab personnel still operate the major tooling, provide the welders, perform assembly of items that would not be part of production magnets (e.g. voltage taps), and oversee the QA program. Five of these 7 GD-built magnets will be used in the Accelerator Systems String Test (ASST) to be carried out in Dallas later this year. The last four magnets, DCA320-323, are being built by Fermilab alone