51 research outputs found
ΠΠ»Π°Π½ΠΈΡΠΎΠ²Π°Π½ΠΈΠ΅ ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π΅Π½Π½ΠΎΠΉ ΠΏΡΠΎΠ³ΡΠ°ΠΌΠΌΡ Π½Π° ΠΏΡΠ΅Π΄ΠΏΡΠΈΡΡΠΈΠΈ
ΠΠΈΠΏΠ»ΠΎΠΌΠ½Π°Ρ ΡΠ°Π±ΠΎΡΠ° ΡΠΎΠ΄Π΅ΡΠΆΠΈΡ 91 ΡΡΡΠ°Π½ΠΈΡΡ,8 ΡΠΈΡΡΠ½ΠΊΠΎΠ², 28 ΡΠ°Π±Π»ΠΈΡ, 20 ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½Π½ΡΡ
ΠΈΡΡΠΎΡΠ½ΠΈΠΊΠΎΠ², 3 ΠΏΡΠΈΠ»ΠΎΠΆΠ΅Π½ΠΈΡ.
ΠΠ»ΡΡΠ΅Π²ΡΠ΅ ΡΠ»ΠΎΠ²Π°: ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π΅Π½Π½Π°Ρ ΠΏΡΠΎΠ³ΡΠ°ΠΌΠΌΠ°, Π²ΡΠΏΡΡΠΊ ΠΏΡΠΎΠ΄ΡΠΊΡΠΈΠΈ, Π°ΡΡΠΎΡΡΠΈΠΌΠ΅Π½Ρ, ΡΠΈΡΠΌΠΈΡΠ½ΠΎΡΡΡ ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π°, ΠΏΠΎΡΡΡΠ΅Π»Ρ Π·Π°ΠΊΠ°Π·ΠΎΠ², ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π΅Π½Π½Π°Ρ ΠΌΠΎΡΠ½ΠΎΡΡΡ.
ΠΠ±ΡΠ΅ΠΊΡΠΎΠΌ ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΡ ΡΠ²Π»ΡΠ΅ΡΡΡ ΠΠΠ Β«ΠΠ΅ΠΌΠ΅ΡΠΎΠ²ΡΠΊΠΈΠΉ ΠΌΠΎΠ»ΠΎΡΠ½ΡΠΉ ΠΊΠΎΠΌΠ±ΠΈΠ½Π°ΡΒ».
Π¦Π΅Π»Ρ Π΄ΠΈΠΏΠ»ΠΎΠΌΠ½ΠΎΠΉ ΡΠ°Π±ΠΎΡΡ - ΠΏΠ»Π°Π½ΠΈΡΠΎΠ²Π°Π½ΠΈΠ΅ ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π΅Π½Π½ΠΎΠΉ ΠΏΡΠΎΠ³ΡΠ°ΠΌΠΌΡ ΠΏΡΠ΅Π΄ΠΏΡΠΈΡΡΠΈΡ Π΄Π»Ρ ΠΏΠΎΠ²ΡΡΠ΅Π½ΠΈΡ Π΅Π³ΠΎ ΡΠ΅Π½ΡΠ°Π±Π΅Π»ΡΠ½ΠΎΡΡΠΈ.
ΠΠ΅ΡΠΎΠ΄Ρ ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΠΉ: Π°Π½Π°Π»ΠΈΡΠΈΡΠ΅ΡΠΊΠΈΠΉ, ΡΠ°ΡΡΠ΅ΡΠ½ΡΠΉ, Π³ΡΠ°ΡΠΈΡΠ΅ΡΠΊΠΈΠΉ.
Π ΠΏΡΠΎΡΠ΅ΡΡΠ΅ ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΡ ΠΏΡΠΎΠ²ΠΎΠ΄ΠΈΠ»ΠΈΡΡ Π°Π½Π°Π»ΠΈΠ· Π²ΡΠΏΠΎΠ»Π½Π΅Π½ΠΈΡ ΠΏΠ»Π°Π½Π° ΠΏΠΎ Π²ΡΠΏΡΡΠΊΡ ΠΈ ΡΠ΅Π°Π»ΠΈΠ·Π°ΡΠΈΠΈ ΠΏΡΠΎΠ΄ΡΠΊΡΠΈΠΈ, ΡΠΈΡΠΌΠΈΡΠ½ΠΎΡΡΠΈ ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π°, ΠΊΠ°ΡΠ΅ΡΡΠ²Π° ΠΏΡΠΎΠ΄ΡΠΊΡΠΈΠΈ, ΡΡΠ΅Π΄Ρ ΠΏΡΠ΅Π΄ΠΏΡΠΈΡΡΠΈΡ, ΠΏΠΎΡΡΡΠ΅Π»Ρ Π·Π°ΠΊΠ°Π·ΠΎΠ², ΠΈΡΠΏΠΎΠ»ΡΠ·ΠΎΠ²Π°Π½ΠΈΡ ΠΏΡΠΎΠΈΠ·Π²ΠΎΠ΄ΡΡΠ²Π΅Π½Π½ΡΡ
ΠΌΠΎΡΠ½ΠΎΡΡΠ΅ΠΉ.
Π ΡΠ΅Π·ΡΠ»ΡΡΠ°ΡΠ΅ ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΡ ΠΎΠΏΡΠ΅Π΄Π΅Π»Π΅Π½ ΠΏΠ»Π°Π½ Π²ΡΠΏΡΡΠΊΠ° ΠΏΡΠΎΠ΄ΡΠΊΡΠΈΠΈ Π² Π½Π°ΡΡΡΠ°Π»ΡΠ½ΠΎΠΌ ΠΈ ΡΡΠΎΠΈΠΌΠΎΡΡΠ½ΠΎΠΌ Π²The thesis contains a 91-page,8 figures, 28 tables, 20 of references, 3 appendices.
Keywords: production program, production, range, rhythm of production, the portfolio of orders, production capacity.
The object of study is OJSC "Kemerovo dairy industrial complex".
The aim of the thesis - planning the production program of the enterprise to improve its profitability.
Research methods: analytical, design, graphics.
In the process of investigation the analysis of the plan for the production and sale of products, the rhythm of production, product quality, environment, backlog of orders, capacity utilization.
The study set out a plan of issue of products in physical and value terms, reserves of improvement of capacity utilization, assessed the effectiveness of the production program.
Level o
- β¦