109 research outputs found

    Calibration of Cryogenic Thermometers for the LHC

    Get PDF
    6000 cryogenic temperature sensors of resistive type covering the range from room temperature down to 1.6 K are installed on the LHC machine. In order to meet the stringent requirements on temperature control of the superconducting magnets, each single sensor needs to be calibrated individually. In the framework of a special contribution, IPN (Institut de Physique Nucléaire) in Orsay, France built and operated a calibration facility with a throughput of 80 thermometers per week. After reception from the manufacturer, the thermometer is first assembled onto a support specific to the measurement environment, and then thermally cycled ten times and calibrated at least once from 1.6 to 300 K. The procedure for each of these interventions includes various measurements and the acquired data is recorded in an ORACLE®-database. Furthermore random calibrations on some samples are executed at CERN to crosscheck the coherence between the approximation data obtained by both IPN and CERN. In the range of 1.5 K to 30 K, the calibration apparatuses at IPN and CERN are traceable to standards maintained in a national metrological laboratory by using a set of rhodium-iron temperature sensors of metrological quality. This paper presents the calibration procedure, the quality assurance applied, the results of the calibration campaigns and the return of experience

    First Experience with the LHC Cryogenic Instrumentation

    Get PDF
    The LHC under commissioning at CERN will be the world's largest superconducting accelerator and therefore makes extensive use of cryogenic instruments. These instruments are installed in the tunnel and therefore have to withstand the LHC environment that imposes radiation-tolerant design and construction. Most of the instruments require individual calibration; some of them exhibit several variants as concerns measuring span; all relevant data are therefore stored in an Oracle® database. Those data are used for the various quality assurance procedures defined for installation and commissioning, as well as for generating tables used by the control system to configure automatically the input/output channels. This paper describes the commissioning of the sensors and the corresponding electronics, the first measurement results during the cool-down of one machine sector; it discusses the different encountered problems and their corresponding solutions

    Installation of instrumentation on the LHC-machine

    No full text

    Transport of the calorimeter for CMS

    No full text

    LHC Cryogenic Operation

    No full text

    Consolidation SPS Ring

    No full text

    LHC Restart 2009

    No full text

    Summer at CERN 2010

    No full text

    LHC Electronics for Cryogenic Instrumentation

    No full text
    • …
    corecore