2 research outputs found
Recommended from our members
Flexible receiver adapter and secondary bagger support frame analysis for 241AP102 mixer pump removal
As part of the Grout Process startup, the 241AP102 Mixer Pump, failed in 1993, is scheduled to be removed. A structural analysis was performed on two components to be used in the bagging process for the failed pump. The loading criteria was based on a worst case accident of the entire pump weight (including a 50% impact load) being applied over a small localized area. The results show that the design of each structure is adequate to protect against failure, i.e., yiel