3 research outputs found
Increase of energy efficiency of electric traction system in operating condition of sectioning posts with electric energy storage units
The increase of energy efficiency of the electric traction system is directed to achieving the target indicators, denoted by the Energy strategy of the OS Β«RZDΒ». One of the basic problems, which must be solved, is the increase of efficiency of the regenerative braking on the railway sections. This could be achieved by receiving regeneration energy. One of the possible decisions is the disposal of the electric energy storage unit in the electric traction system on the sectioning post. For some energy parameters, the installation of storage unit on the sectioning post is more effective in comparison with its location on the traction substations. The analysis of the basic methods of the electric traction system operation when the regenerative braking is applied allows determining the required parameters and finding more effective areas for using the device. The aim of the research is to evaluate the expediency and the efficiency of applying the capacitive energy storage units on the railway posts of the DC sectioning to increase the efficiency of using the regenerative braking as well as to increase the energy efficiency of the electric traction system. Research methods: the simulation modeling of the traction capacity in the electric traction system based on the experimental date, obtained from the measuring system of the DC electric locomotive.Β Results. The authors have analyzed the influence of the capacitive energy storage units, located on the sectioning posts on the operation modes of the DC electric traction system when the regenerative braking is applied. The electric energy storage unit operation was modeled for one of the actual area of the railroad with several areas between substations, on the base of the data, obtained by the results of processing the goods train traction load. The cross-section of a road includes gradients up to 10 ppm, that causes the wide use of the regenerative braking. The authors proposed the algorithm of controlling the operating mode of the electric energy storage unit on the post of the DC sectioning, which is based on measuring voltage level on the wires of the post of the DC sectioning and on the wires of the electric energy storage unit; considered the diagram of controlling the energy storage units with the counter turning on of the election keys, which provides the energy storage charge unit when using the trains with regenerative braking and its discharge at minimal voltage in the wires of the sectioning post by the maximal traction load. It was shown, that the use of the electric energy storage units on the post of the DC sectioning allows increasing the average voltage on the wires of the adjacent traction substations, reducing electric energy losses in the traction system, the level of the traction load of the converting unit input and the total electric power consumption, determined by the connections of the contact network of the traction substations. The authors estimated the influence of the storage unit on the working parameters of the electric traction system. The paper mentions the defects of the considered diagram of the energy storage unit connection to the wires of the DC sectioning post. The defects can be removed by improving the control diagram
Increase of energy efficiency of electric traction system in operating condition of sectioning posts with electric energy storage units
The increase of energy efficiency of the electric traction system is directed to achieving the target indicators, denoted by the Energy strategy of the OS Β«RZDΒ». One of the basic problems, which must be solved, is the increase of efficiency of the regenerative braking on the railway sections. This could be achieved by receiving regeneration energy. One of the possible decisions is the disposal of the electric energy storage unit in the electric traction system on the sectioning post. For some energy parameters, the installation of storage unit on the sectioning post is more effective in comparison with its location on the traction substations. The analysis of the basic methods of the electric traction system operation when the regenerative braking is applied allows determining the required parameters and finding more effective areas for using the device. The aim of the research is to evaluate the expediency and the efficiency of applying the capacitive energy storage units on the railway posts of the DC sectioning to increase the efficiency of using the regenerative braking as well as to increase the energy efficiency of the electric traction system. Research methods: the simulation modeling of the traction capacity in the electric traction system based on the experimental date, obtained from the measuring system of the DC electric locomotive.Β Results. The authors have analyzed the influence of the capacitive energy storage units, located on the sectioning posts on the operation modes of the DC electric traction system when the regenerative braking is applied. The electric energy storage unit operation was modeled for one of the actual area of the railroad with several areas between substations, on the base of the data, obtained by the results of processing the goods train traction load. The cross-section of a road includes gradients up to 10 ppm, that causes the wide use of the regenerative braking. The authors proposed the algorithm of controlling the operating mode of the electric energy storage unit on the post of the DC sectioning, which is based on measuring voltage level on the wires of the post of the DC sectioning and on the wires of the electric energy storage unit; considered the diagram of controlling the energy storage units with the counter turning on of the election keys, which provides the energy storage charge unit when using the trains with regenerative braking and its discharge at minimal voltage in the wires of the sectioning post by the maximal traction load. It was shown, that the use of the electric energy storage units on the post of the DC sectioning allows increasing the average voltage on the wires of the adjacent traction substations, reducing electric energy losses in the traction system, the level of the traction load of the converting unit input and the total electric power consumption, determined by the connections of the contact network of the traction substations. The authors estimated the influence of the storage unit on the working parameters of the electric traction system. The paper mentions the defects of the considered diagram of the energy storage unit connection to the wires of the DC sectioning post. The defects can be removed by improving the control diagram
Increase of energy efficiency of electric traction system in operating condition of sectioning posts with electric energy storage units
ΠΠΎΠ²ΡΡΠ΅Π½ΠΈΠ΅ ΡΠ½Π΅ΡΠ³Π΅ΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎΡΡΠΈ ΡΠ°Π±ΠΎΡΡ ΡΠΈΡΡΠ΅ΠΌΡ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ Π½Π°ΠΏΡΠ°Π²Π»Π΅Π½ΠΎ Π½Π° Π΄ΠΎΡΡΠΈΠΆΠ΅Π½ΠΈΠ΅ ΡΠ΅Π»Π΅Π²ΡΡ
ΠΏΠΎΠΊΠ°Π·Π°ΡΠ΅Π»Π΅ΠΉ, ΠΎΠ±ΠΎΠ·Π½Π°ΡΠ΅Π½Π½ΡΡ
ΠΠ½Π΅ΡΠ³Π΅ΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΡΡΡΠ°ΡΠ΅Π³ΠΈΠ΅ΠΉ ΠΠΠ Β«Π ΠΠΒ». ΠΠ΄Π½ΠΎΠΉ ΠΈΠ· ΠΎΡΠ½ΠΎΠ²Π½ΡΡ
Π·Π°Π΄Π°Ρ, ΡΡΠ΅Π±ΡΡΡΠΈΡ
ΡΠ΅ΡΠ΅Π½ΠΈΡ, ΡΠ²Π»ΡΠ΅ΡΡΡ ΠΏΠΎΠ²ΡΡΠ΅Π½ΠΈΠ΅ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎΡΡΠΈ ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΠΎΡΠΌΠΎΠΆΠ΅Π½ΠΈΡ Π½Π° ΡΡΠ°ΡΡΠΊΠ°Ρ
ΠΆΠ΅Π»Π΅Π·Π½ΡΡ
Π΄ΠΎΡΠΎΠ³, ΡΡΠΎ ΠΌΠΎΠΆΠ΅Ρ Π±ΡΡΡ Π΄ΠΎΡΡΠΈΠ³Π½ΡΡΠΎ ΠΎΠ±Π΅ΡΠΏΠ΅ΡΠ΅Π½ΠΈΠ΅ΠΌ ΠΏΡΠΈΠ΅ΠΌΠ° ΡΠ½Π΅ΡΠ³ΠΈΠΈ ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠΈ. ΠΠ΄Π½ΠΈΠΌ ΠΈΠ· Π²ΠΎΠ·ΠΌΠΎΠΆΠ½ΡΡ
ΡΠ΅ΡΠ΅Π½ΠΈΠΉ ΡΠ²Π»ΡΠ΅ΡΡΡ ΡΠ°Π·ΠΌΠ΅ΡΠ΅Π½ΠΈΠ΅ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ ΡΠ»Π΅ΠΊΡΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ Π² ΡΠΈΡΡΠ΅ΠΌΠ΅ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ Π½Π° ΠΏΠΎΡΡΡ ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ, ΡΠ°ΠΊ ΠΊΠ°ΠΊ ΠΏΠΎ ΡΡΠ΄Ρ ΡΠ½Π΅ΡΠ³Π΅ΡΠΈΡΠ΅ΡΠΊΠΈΡ
ΠΏΠ°ΡΠ°ΠΌΠ΅ΡΡΠΎΠ² ΠΈΠΌΠ΅Π½Π½ΠΎ Π½Π° ΠΏΠΎΡΡΡ ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΡΡΡΠ°Π½ΠΎΠ²ΠΊΠ° Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ ΠΎΠΊΠ°Π·ΡΠ²Π°Π΅ΡΡΡ Π±ΠΎΠ»Π΅Π΅ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎ ΠΏΠΎ ΡΡΠ°Π²Π½Π΅Π½ΠΈΡ Ρ ΡΠ°Π·ΠΌΠ΅ΡΠ΅Π½ΠΈΠ΅ΠΌ Π½Π° ΡΡΠ³ΠΎΠ²ΡΡ
ΠΏΠΎΠ΄ΡΡΠ°Π½ΡΠΈΡΡ
. ΠΠ·ΡΡΠ΅Π½ΠΈΠ΅ ΠΎΡΠ½ΠΎΠ²Π½ΡΡ
ΡΠ΅ΠΆΠΈΠΌΠΎΠ² ΡΠ°Π±ΠΎΡΡ ΡΠΈΡΡΠ΅ΠΌΡ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ Π² ΡΡΠ»ΠΎΠ²ΠΈΡΡ
ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΡ ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΠΎΡΠΌΠΎΠΆΠ΅Π½ΠΈΡ ΠΏΠΎΠ·Π²ΠΎΠ»ΡΠ΅Ρ ΠΎΠΏΡΠ΅Π΄Π΅Π»ΠΈΡΡ Π½Π΅ΠΎΠ±Ρ
ΠΎΠ΄ΠΈΠΌΡΠ΅ ΠΏΠ°ΡΠ°ΠΌΠ΅ΡΡΡ ΠΈ Π½Π°ΠΉΡΠΈ Π½Π°ΠΈΠ±ΠΎΠ»Π΅Π΅ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΡΠ΅ ΡΡΠ°ΡΡΠΊΠΈ ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΡ ΡΡΡΡΠΎΠΉΡΡΠ². Π¦Π΅Π»Ρ ΡΠ°Π±ΠΎΡΡ: ΠΎΡΠ΅Π½ΠΊΠ° ΡΠ΅Π»Π΅ΡΠΎΠΎΠ±ΡΠ°Π·Π½ΠΎΡΡΠΈ ΠΈ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎΡΡΠΈ ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΡ Π΅ΠΌΠΊΠΎΡΡΠ½ΡΡ
Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Π΅ΠΉ ΡΠ»Π΅ΠΊΡΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ Π½Π° ΠΏΠΎΡΡΠ°Ρ
ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΠΆΠ΅Π»Π΅Π·Π½ΡΡ
Π΄ΠΎΡΠΎΠ³ ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ°, Π² ΡΠ΅Π»ΡΡ
ΠΏΠΎΠ²ΡΡΠ΅Π½ΠΈΡ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎΡΡΠΈ ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΡ ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΠΎΡΠΌΠΎΠΆΠ΅Π½ΠΈΡ, Π° ΡΠ°ΠΊΠΆΠ΅ ΠΏΠΎΠ²ΡΡΠ΅Π½ΠΈΡ ΡΠ½Π΅ΡΠ³Π΅ΡΠΈΡΠ΅ΡΠΊΠΎΠΉ ΡΡΡΠ΅ΠΊΡΠΈΠ²Π½ΠΎΡΡΠΈ ΡΠΈΡΡΠ΅ΠΌΡ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ. ΠΠ΅ΡΠΎΠ΄Ρ ΠΈΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΈΡ: ΠΈΠΌΠΈΡΠ°ΡΠΈΠΎΠ½Π½ΠΎΠ΅ ΠΌΠΎΠ΄Π΅Π»ΠΈΡΠΎΠ²Π°Π½ΠΈΠ΅ ΡΡΠ³ΠΎΠ²ΠΎΠΉ Π½Π°Π³ΡΡΠ·ΠΊΠΈ Π² ΡΠΈΡΡΠ΅ΠΌΠ΅ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ Π½Π° ΠΎΡΠ½ΠΎΠ²Π΅ ΡΠΊΡΠΏΠ΅ΡΠΈΠΌΠ΅Π½ΡΠ°Π»ΡΠ½ΡΡ
Π΄Π°Π½Π½ΡΡ
, ΠΏΠΎΠ»ΡΡΠ΅Π½Π½ΡΡ
Ρ ΠΈΠ·ΠΌΠ΅ΡΠΈΡΠ΅Π»ΡΠ½ΡΡ
ΡΠΈΡΡΠ΅ΠΌ ΡΠ»Π΅ΠΊΡΡΠΎΠ²ΠΎΠ·ΠΎΠ² ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ°. Π Π΅Π·ΡΠ»ΡΡΠ°ΡΡ. ΠΡΡΠ»Π΅Π΄ΠΎΠ²Π°Π½ΠΎ Π²Π»ΠΈΡΠ½ΠΈΠ΅ Π΅ΠΌΠΊΠΎΡΡΠ½ΡΡ
Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Π΅ΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ, ΡΠ°ΡΠΏΠΎΠ»ΠΎΠΆΠ΅Π½Π½ΡΡ
Π½Π° ΠΏΠΎΡΡΠ°Ρ
ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ, Π½Π° ΡΠ΅ΠΆΠΈΠΌΡ ΡΠ°Π±ΠΎΡΡ ΡΠΈΡΡΠ΅ΠΌΡ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ° Π² ΡΡΠ»ΠΎΠ²ΠΈΡΡ
ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΡ ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΠΎΡΠΌΠΎΠΆΠ΅Π½ΠΈΡ. ΠΠΎΠ΄Π΅Π»ΠΈΡΠΎΠ²Π°Π½ΠΈΠ΅ ΡΠ°Π±ΠΎΡΡ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Π΅ΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ Π²ΡΠΏΠΎΠ»Π½Π΅Π½ΠΎ Π΄Π»Ρ ΠΎΠ΄Π½ΠΎΠ³ΠΎ ΠΈΠ· ΡΠ΅Π°Π»ΡΠ½ΡΡ
ΡΡΠ°ΡΡΠΊΠΎΠ² ΠΆΠ΅Π»Π΅Π·Π½ΠΎΠΉ Π΄ΠΎΡΠΎΠ³ΠΈ, ΡΠΎΠ΄Π΅ΡΠΆΠ°ΡΠΈΡ
Π½Π΅ΡΠΊΠΎΠ»ΡΠΊΠΎ ΠΌΠ΅ΠΆΠΏΠΎΠ΄ΡΡΠ°Π½ΡΠΈΠΎΠ½Π½ΡΡ
Π·ΠΎΠ½, Π½Π° ΠΎΡΠ½ΠΎΠ²Π΅ Π΄Π°Π½Π½ΡΡ
, ΠΏΠΎΠ»ΡΡΠ΅Π½Π½ΡΡ
ΠΏΠΎ ΡΠ΅Π·ΡΠ»ΡΡΠ°ΡΠ°ΠΌ ΠΎΠ±ΡΠ°Π±ΠΎΡΠΊΠΈ ΡΡΠ³ΠΎΠ²ΠΎΠΉ Π½Π°Π³ΡΡΠ·ΠΊΠΈ Π³ΡΡΠ·ΠΎΠ²ΠΎΠ³ΠΎ ΠΏΠΎΠ΅Π·Π΄Π°. ΠΡΠΎΡΠΈΠ»Ρ ΠΏΡΡΠΈ ΡΠ°ΡΡΠΌΠ°ΡΡΠΈΠ²Π°Π΅ΠΌΠΎΠ³ΠΎ ΡΡΠ°ΡΡΠΊΠ° ΠΆΠ΅Π»Π΅Π·Π½ΠΎΠΉ Π΄ΠΎΡΠΎΠ³ΠΈ ΡΠΎΠ΄Π΅ΡΠΆΠΈΡ ΡΠΊΠ»ΠΎΠ½Ρ Π΄ΠΎ Π΄Π΅ΡΡΡΠΈ ΠΏΡΠΎΠΌΠΈΠ»Π»Π΅, ΡΡΠΎ ΠΎΠ±ΡΡΠ»ΠΎΠ²Π»ΠΈΠ²Π°Π΅Ρ ΡΠΈΡΠΎΠΊΠΎΠ΅ ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΠ΅ ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΠΎΡΠΌΠΎΠΆΠ΅Π½ΠΈΡ. ΠΡΠ΅Π΄Π»ΠΎΠΆΠ΅Π½ Π°Π»Π³ΠΎΡΠΈΡΠΌ ΡΠΏΡΠ°Π²Π»Π΅Π½ΠΈΡ ΡΠ΅ΠΆΠΈΠΌΠ°ΠΌΠΈ ΡΠ°Π±ΠΎΡΡ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π΅ΡΠ³ΠΈΠΈ Π½Π° ΠΏΠΎΡΡΡ ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ°, ΠΎΡΠ½ΠΎΠ²Π°Π½Π½ΡΠΉ Π½Π° ΠΈΠ·ΠΌΠ΅ΡΠ΅Π½ΠΈΡΡ
ΡΡΠΎΠ²Π½Ρ Π½Π°ΠΏΡΡΠΆΠ΅Π½ΠΈΡ Π½Π° ΡΠΈΠ½Π°Ρ
ΠΏΠΎΡΡΠ° ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ° ΠΈ ΡΠΈΠ½Π°Ρ
Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ ΡΠ½Π΅ΡΠ³ΠΈΠΈ. Π Π°ΡΡΠΌΠΎΡΡΠ΅Π½Π° ΡΡ
Π΅ΠΌΠ° ΡΠΏΡΠ°Π²Π»Π΅Π½ΠΈΡ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»ΡΠΌΠΈ ΡΠ½Π΅ΡΠ³ΠΈΠΈ ΡΠΎ Π²ΡΡΡΠ΅ΡΠ½ΡΠΌ Π²ΠΊΠ»ΡΡΠ΅Π½ΠΈΠ΅ΠΌ ΡΠ»Π΅ΠΊΡΡΠΎΠ½Π½ΡΡ
ΠΊΠ»ΡΡΠ΅ΠΉ, ΠΎΠ±Π΅ΡΠΏΠ΅ΡΠΈΠ²Π°ΡΡΠ°Ρ Π·Π°ΡΡΠ΄ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ ΡΠ½Π΅ΡΠ³ΠΈΠΈ ΠΏΡΠΈ ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΠΈ ΠΏΠΎΠ΅Π·Π΄ΠΎΠ² ΡΠ΅ΠΊΡΠΏΠ΅ΡΠ°ΡΠΈΠ²Π½ΠΎΠ³ΠΎ ΡΠΎΡΠΌΠΎΠΆΠ΅Π½ΠΈΡ ΠΈ Π΅Π³ΠΎ ΡΠ°Π·ΡΡΠ΄ ΠΏΡΠΈ ΠΌΠΈΠ½ΠΈΠΌΠ°Π»ΡΠ½ΠΎΠΌ Π½Π°ΠΏΡΡΠΆΠ΅Π½ΠΈΠΈ Π½Π° ΡΠΈΠ½Π°Ρ
ΠΏΠΎΡΡΠ° ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΠΏΡΠΈ ΠΌΠ°ΠΊΡΠΈΠΌΠ°Π»ΡΠ½ΠΎΠΉ ΡΡΠ³ΠΎΠ²ΠΎΠΉ Π½Π°Π³ΡΡΠ·ΠΊΠ΅. ΠΠΎΠΊΠ°Π·Π°Π½ΠΎ, ΡΡΠΎ ΠΏΡΠΈΠΌΠ΅Π½Π΅Π½ΠΈΠ΅ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Π΅ΠΉ ΡΠ½Π΅ΡΠ³ΠΈΠΈ Π½Π° ΠΏΠΎΡΡΡ ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ° ΠΏΠΎΠ·Π²ΠΎΠ»ΡΠ΅Ρ ΠΏΠΎΠ²ΡΡΠΈΡΡ ΡΡΠ΅Π΄Π½Π΅Π΅ Π½Π°ΠΏΡΡΠΆΠ΅Π½ΠΈΡ Π½Π° ΡΠΈΠ½Π°Ρ
ΡΠΌΠ΅ΠΆΠ½ΡΡ
ΡΡΠ³ΠΎΠ²ΡΡ
ΠΏΠΎΠ΄ΡΡΠ°Π½ΡΠΈΠΉ, ΡΠΎΠΊΡΠ°ΡΠΈΡΡ ΠΏΠΎΡΠ΅ΡΠΈ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π΅ΡΠ³ΠΈΠΈ Π² ΡΡΠ³ΠΎΠ²ΠΎΠΉ ΡΠ΅ΡΠΈ, ΡΡΠΎΠ²Π΅Π½Ρ ΡΡΠ³ΠΎΠ²ΠΎΠΉ Π½Π°Π³ΡΡΠ·ΠΊΠΈ ΠΏΠΎ Π²Π²ΠΎΠ΄Ρ ΠΏΡΠ΅ΠΎΠ±ΡΠ°Π·ΠΎΠ²Π°ΡΠ΅Π»ΡΠ½ΠΎΠ³ΠΎ Π°Π³ΡΠ΅Π³Π°ΡΠ° ΠΈ ΡΡΠΌΠΌΠ°ΡΠ½ΡΠΉ ΡΠ°ΡΡ
ΠΎΠ΄ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π΅ΡΠ³ΠΈΠΈ, ΠΎΠΏΡΠ΅Π΄Π΅Π»ΡΠ΅ΠΌΡΠΉ ΠΏΠΎ ΠΏΡΠΈΡΠΎΠ΅Π΄ΠΈΠ½Π΅Π½ΠΈΡΠΌ ΠΊΠΎΠ½ΡΠ°ΠΊΡΠ½ΠΎΠΉ ΡΠ΅ΡΠΈ ΡΡΠ³ΠΎΠ²ΡΡ
ΠΏΠΎΠ΄ΡΡΠ°Π½ΡΠΈΠΉ. ΠΡΠΏΠΎΠ»Π½Π΅Π½Π° ΠΎΡΠ΅Π½ΠΊΠ° Π²Π»ΠΈΡΠ½ΠΈΡ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ Π½Π° ΠΏΠ°ΡΠ°ΠΌΠ΅ΡΡΡ ΡΠ°Π±ΠΎΡΡ ΡΠΈΡΡΠ΅ΠΌΡ ΡΡΠ³ΠΎΠ²ΠΎΠ³ΠΎ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π°Π±ΠΆΠ΅Π½ΠΈΡ. ΠΡΠΌΠ΅ΡΠ΅Π½Ρ Π½Π΅Π΄ΠΎΡΡΠ°ΡΠΊΠΈ ΡΠ°ΡΡΠΌΠ°ΡΡΠΈΠ²Π°Π΅ΠΌΠΎΠΉ ΡΡ
Π΅ΠΌΡ ΠΏΠΎΠ΄ΠΊΠ»ΡΡΠ΅Π½ΠΈΡ Π½Π°ΠΊΠΎΠΏΠΈΡΠ΅Π»Ρ ΡΠ»Π΅ΠΊΡΡΠΎΡΠ½Π΅ΡΠ³ΠΈΠΈ ΠΊ ΡΠΈΠ½Π°ΠΌ ΠΏΠΎΡΡΠ° ΡΠ΅ΠΊΡΠΈΠΎΠ½ΠΈΡΠΎΠ²Π°Π½ΠΈΡ ΠΏΠΎΡΡΠΎΡΠ½Π½ΠΎΠ³ΠΎ ΡΠΎΠΊΠ°, ΠΊΠΎΡΠΎΡΡΠ΅ ΠΌΠΎΠ³ΡΡ Π±ΡΡΡ ΡΡΡΡΠ°Π½Π΅Π½Ρ Π² Π΄Π°Π»ΡΠ½Π΅ΠΉΡΠ΅ΠΌ ΠΏΡΡΠ΅ΠΌ ΡΠΎΠ²Π΅ΡΡΠ΅Π½ΡΡΠ²ΠΎΠ²Π°Π½ΠΈΡ ΡΡ
Π΅ΠΌΡ ΡΠΏΡΠ°Π²Π»Π΅Π½ΠΈΡ.The increase of energy efficiency of the electric traction system is directed to achieving the target indicators, denoted by the Energy strategy of the OS Β«RZDΒ». One of the basic problems, which must be solved, is the increase of efficiency of the regenerative braking on the railway sections. This could be achieved by receiving regeneration energy. One of the possible decisions is the disposal of the electric energy storage unit in the electric traction system on the sectioning post. For some energy parameters, the installation of storage unit on the sectioning post is more effective in comparison with its location on the traction substations. The analysis of the basic methods of the electric traction system operation when the regenerative braking is applied allows determining the required parameters and finding more effective areas for using the device. The aim of the research is to evaluate the expediency and the efficiency of applying the capacitive energy storage units on the railway posts of the DC sectioning to increase the efficiency of using the regenerative braking as well as to increase the energy efficiency of the electric traction system. Research methods: the simulation modeling of the traction capacity in the electric traction system based on the experimental date, obtained from the measuring system of the DC electric locomotive. Results. The authors have analyzed the influence of the capacitive energy storage units, located on the sectioning posts on the operation modes of the DC electric traction system when the regenerative braking is applied. The electric energy storage unit operation was modeled for one of the actual area of the railroad with several areas between substations, on the base of the data, obtained by the results of processing the goods train traction load. The cross-section of a road includes gradients up to 10 ppm, that causes the wide use of the regenerative braking. The authors proposed the algorithm of controlling the operating mode of the electric energy storage unit on the post of the DC sectioning, which is based on measuring voltage level on the wires of the post of the DC sectioning and on the wires of the electric energy storage unit; considered the diagram of controlling the energy storage units with the counter turning on of the election keys, which provides the energy storage charge unit when using the trains with regenerative braking and its discharge at minimal voltage in the wires of the sectioning post by the maximal traction load. It was shown, that the use of the electric energy storage units on the post of the DC sectioning allows increasing the average voltage on the wires of the adjacent traction substations, reducing electric energy losses in the traction system, the level of the traction load of the converting unit input and the total electric power consumption, determined by the connections of the contact network of the traction substations. The authors estimated the influence of the storage unit on the working parameters of the electric traction system. The paper mentions the defects of the considered diagram of the energy storage unit connection to the wires of the DC sectioning post. The defects can be removed by improving the control diagram