4 research outputs found
Cost analysis of nondeterministic probabilistic programs
We consider the problem of expected cost analysis over nondeterministic probabilistic programs,
which aims at automated methods for analyzing the resource-usage of such programs.
Previous approaches for this problem could only handle nonnegative bounded costs.
However, in many scenarios, such as queuing networks or analysis of cryptocurrency protocols,
both positive and negative costs are necessary and the costs are unbounded as well.
In this work, we present a sound and efficient approach to obtain polynomial bounds on the
expected accumulated cost of nondeterministic probabilistic programs.
Our approach can handle (a) general positive and negative costs with bounded updates in
variables; and (b) nonnegative costs with general updates to variables.
We show that several natural examples which could not be
handled by previous approaches are captured in our framework.
Moreover, our approach leads to an efficient polynomial-time algorithm, while no
previous approach for cost analysis of probabilistic programs could guarantee polynomial runtime.
Finally, we show the effectiveness of our approach using experimental results on a variety of programs for which we efficiently synthesize tight resource-usage bounds
Cost Analysis of Nondeterministic Probabilistic Programs
We consider the problem of expected cost analysis over nondeterministic
probabilistic programs, which aims at automated methods for analyzing the
resource-usage of such programs. Previous approaches for this problem could
only handle nonnegative bounded costs. However, in many scenarios, such as
queuing networks or analysis of cryptocurrency protocols, both positive and
negative costs are necessary and the costs are unbounded as well.
In this work, we present a sound and efficient approach to obtain polynomial
bounds on the expected accumulated cost of nondeterministic probabilistic
programs. Our approach can handle (a) general positive and negative costs with
bounded updates in variables; and (b) nonnegative costs with general updates to
variables. We show that several natural examples which could not be handled by
previous approaches are captured in our framework.
Moreover, our approach leads to an efficient polynomial-time algorithm, while
no previous approach for cost analysis of probabilistic programs could
guarantee polynomial runtime. Finally, we show the effectiveness of our
approach by presenting experimental results on a variety of programs, motivated
by real-world applications, for which we efficiently synthesize tight
resource-usage bounds.Comment: A conference version will appear in the 40th ACM Conference on
Programming Language Design and Implementation (PLDI 2019