    Anchored Bulkhead Failure on the Arabian Gulf

    Get PDF
    A 1500-m long anchored bulkhead with a height of 20m exhibited a localized failure in the form of broken and overstressed anchors several months after construction. The wall had not yet been subjected to its full design loadings. The soil conditions in the failure area differ from those occurring along the rest of the quay wall by the presence of a very soft silt/clay layer, and during construction the wall had been strengthened in this area. Post-failure analysis of the anchored bulkhead indicated that the primary cause of the failure was overly optimistic design assumptions for the strength of the silt/clay layer and mobilization of passive pressure. The effects of certain construction methods employed and the settlement of the silt/clay were contributing factors in the failure. A relieving platform constructed one year after the failure was designed for the original undrained strength of the silt/clay, without taking into account the effects of soil consolidation and strength gains which had occurred
    corecore