The Utilization of Building Information Modeling In Nigerian Construction Industry: Challenges and Prospects
The aim of this research is to appraise the challenges and prospects in the use of Building Information
Modeling (BIM) in the construction industry in Nigeria. It analyzed the uses of BIM in the construction
industry, determined the stakeholders perception of the benefits, risk and benchmarks in the adoption of
BIM in construction practice and process. It examined the extent of its interoperability in bringing
together the different participants and processes of construction works for efficiency and effective
construction management and timely project delivery. It compared the findings with the same studies
carried out and/or currently being carried out in many parts of the world. Primary data were collected
through structured questionnaires. The questionnaires were distributed and collected through personal
contacts, letters, online groups and e-mails. Direct observation and interviews were made with
professionals in the construction industry The secondary data were obtained from the exploration of
various relevant literature and previous researches that have been done in relevant areas. A purposive and
modified BIM measurement survey was used for this research work to gather the opinion and views of
various construction professionals and clients A total of One Hundred and Fifty (150) questionnaires
were distributed based on the sample population. One Hundred and Thirty-two (132) questionnaires were
retrieved and used to obtain the required information for data. Tools used the purpose of this research
include mean score, percentile and inferential method of statistical analysis. The statistical package for
social science (SPSS) was basically used to create the frequency tables and the charts. The study showed
that the application of BIM is economical and easy leading to improvement, enhanced technical and
general management of construction projects which can lead to total control of cost estimates, prompt
delivery of projects and quality are the most important key performance indicators in construction
Factors Militating Against Prompt Delivery of Construction Projects in Lagos Megacity, Nigeria: Contractors’ Perspective
Delay is a common issue faced in the construction industry all over the world especially in developing countries. The aim of this
study is to evaluate factors causing delays and their effects on construction projects in Lagos Mega City, Nigeria from the
contractors’ perspective. It is predicated on the incessant delay experienced by contractors on construction projects. Purposive
sampling method was adopted for the study;. Quantitative data was obtained by administration of One hundred (100) structured
questionnaires distributed to contractors of construction project sites in Lagos State and Qualitative data was obtained from
interview of key management personnel of the companies and journals. Ranking analysis of the 33 major causes of delays
identified through literature review using Relative Importance Index (RII) showed that cash flow problems during construction
(RII=4.81), clients’ financial difficulties (RII=4.47) and poor procurement (RII=4.40) were the most importantt causes of delays
in construction project sites in Lagos State, Cost overrun (RII=4.92), late payment (RII=4.59) and project extension (RII=4.45)
were predominant effects of delay in construction project. Hypotheses testing on relationship between shortage of skilled
labour, improper equipment during construction and delay in construction project using One-Way ANOVA showed positive
correlation. For improved efficiency and effective project delivery in the industry, proper payment from client (RII=4.78),
competent project managers (RII=4.64), the use o