    Rationalizing Critical Cost Overrun Factors on Public Sector Housing Programmes

    Get PDF
    The cost overrun phenomenon on projects worldwide creates a major source of risk that warrants investigation. The prevailing factor school of thought provides strong empirical evidence that critical factors contributing to cost overruns are both context-specific and project-specific. Although many studies have been conducted identifying factors and causes of cost overruns, very few studies have investigated root causes. Additionally, a limited body of knowledge is available within the context of Small Island Development States (SIDS). To fill this gap, the objectives of this study were to identify and determine the main critical factors contributing to the cost overrun phenomenon in public sector social housing programmes (PSSHPs). These selected factors were thereafter categorized under leading root causes, and their severity was determined based on primary stakeholders’ perspectives. One hundred and twenty-three factors were identified from the literature, of which forty-one critical factors were extracted and grouped under four root causes based on a pilot survey of relevant public sector housing experts in the Trinidadian and Jamaican construction sectors. These refined factors and root causes were formulated into a questionnaire survey. One hundred and five responses were obtained from professionals who had a minimum of five years’ experience in various phases of public housing delivery. The severity of these critical factors was evaluated, ranked, and categorized using the relative importance index (RII) approach. The findings uncovered the leading root cause, which is political in nature. The top five critical factors are the selection of politically aligned contractors, the intentional design of inadequate contracts, the project actors' deliberately underestimating costs, the partisan project management team, and strategic misrepresentation. These findings are unique to SIDS and contribute to knowledge to reframe contemporary project management practices, which focus mainly on technical causes. Finally, as existing technical solutions are ineffective in curbing cost overruns in PSSHPs, these findings also inform public sector policymakers to focus on prioritization, control, and mitigation of political risks in formulating effective governance mechanisms. Doi: 10.28991/ESJ-2022-06-03-016 Full Text: PD

    Coir Fibre: A Sustainable Engineering Material for the Caribbean Islands

    No full text
    One of the most inventive, sustainable strategies used in ground engineering is the substitution of biodegradable materials for non-biodegradable materials, particularly in situations where short-term ground improvement is needed. Biodegradable materials such as vegetable fibres have excellent engineering properties that could be used in the construction industry to enhance filtration, drainage and reinforcement. Two of the most important properties of vegetable fibres used for soil reinforcement are their high initial tensile strength and environmentally-friendly qualities. This paper investigates the time-dependent behaviour of basal-reinforced embankments erected on soft ground using biodegradable geotextiles, such as coir fibre, derived from coconuts, as reinforcing materials. An analytical model for soil reinforcement, which incorporates changes of foundation soil strength over time due to consolidation, is analyzed using the GEO5 slope stability computer software. The initial strength of the fibre reinforcement required to achieve a specific factor of safety is calculated

    Implications of ‘Lock-in’ on Public Sector Project Management in a Small Island Development State

    No full text
    The concept of ‘Lock-In’, or the escalating cost of overcommitment on a project to a failing course of action, has unforeseeable implications in project management. This paper presents a case study on the occurrence and consequences of lock-in within the context of public sector housing projects in a small island developing state (SIDS). It demonstrates that cost overruns continue beyond the commissioning phase and throughout the project’s lifecycle, even though technical contingencies were implemented to deliver the intended project benefits. The findings unpack the implications of political expediency as a strategic tool mobilised to supersede proper technical decision-making prior to project execution. It concludes that project practitioners’ commitment to select and continue with a sub-optimal project can lead to the implementation of ineffective solutions to justify their actions, resulting in failed outcomes with negative social consequences. This research helps to advance project management knowledge in the us-er/operation phase, because previous scholarly work was limited to investigating lock-in from project conceptualisation to the commissioning phase

    When Parallel Schools of Thought Fail to Converge: The Case of Cost Overruns in Project Management

    No full text
    This paper investigates the conflicting and contrasting views between two prominent schools of thought (SOT), the conventional project management empirical school and the incoming behavioural and psychological sciences, to explain the cost overrun phenomenon in transportation infrastructure projects. Although theories within these SOTs seem to coexist and are used interchangeably, there exists a widening knowledge gap that leads to conflicting and contrasting ideological views. In this paper, we contend that there is a lack of a cross-fertilisation mechanism to fuse and co-join contemporary theories on cost overruns. This has led to the encapsulation and fragmented adhocracy in theory building. Utilising a critical review approach, this study proposes the concepts of ideological distancing and encapsulation between “empiricism” and “behavioural” SOTs as the focus of analyses for understanding the root causes of cost overruns in project studies. The study showed that the extant debate on cost overruns is limited and divergent, effectively contributing to the problem of continued expansion and non-convergence of theories that maintain parallel identities. This creates a space for inquiry, reflecting, theorising, and debating for the convergence of SOTs on cost overrun research and theories on what can be deemed project knowledge. This paper contributes to extant project studies by identifying the need for convergence and co-joining theories with different epistemes through causal linkages. Consequently, this will improve the public sector’s infrastructure policymaking by exposing the theoretical limitations of the current ad hoc manner and application of project management concepts based on the project professionals’ bounded decision-making rationalities