5 research outputs found
Recuperative Energy Potential From A Typical Landfill In Malaysia.
The study looks into availability of recuperative energy potential from a typical landfill in Malaysia. Due to the rapid urbanization, rising population and lifestyle changes, the amount of municipal solid wastes (MSW) in Malaysia is increasing year by year
Environmental Ranking Considerations For Setting Up A Recuperative Energy Incinerator.
The study looks into environmental ranking considerations in setting up a recuperative energy incinerator in Malaysia. Major impacts on the environmental aspects covering land, water and air were put into considerations
Recommended from our members
Assessment parameters for coal-fired generation plant site selection
In order to meet future demand for electricity, Tenaga Nasional Berhad (TNB) is committedto the long-term strategic planning in locating suitable sites for future development of power stations.Site selection is an important process in the early planning stage of any power plant development asit will have significant implications on the capital investment, operational as well as the environmentand socio-economic costs of the power plant.The aim of this presentation is to briefly describe the ten (10) main assessment parametershaving the most profound effects on the selection of potential coal-fired generation plant sites.These assessment parameters were derived based on a survey of approximately 40 experts, comprisingfrom various specialists such as engineers from TNB, senior officers from Department Of EnvironmentMalaysia (DOE), scientist from University Malaya (UM) and a number of other independentconsultants
Assessment parameters for coal-fired generation plant site selection
In order to meet future demand for electricity, Tenaga Nasional Berhad (TNB) is committed to the long-term strategic planning in locating statable sites for future development of power stations. Site selection is an important process in the early planning stage of any power plant development as it will have significant implications on the capital investment, operational as well as the environment and socio-economic costs of the power plant. The aim of this presentation is to briefly describe the ten (10) main assessment parameters having the most profound effects on the selection of potential coal-fired generation plant sites.: These assessment parameters were derived based on a survey of approximately 40 experts, comprising from various specialists such as engineers from TNB, senior officers from Department Of Environment Malaysia (DOE), scientist from University Malaya (UM) and a number of other independent consultants