23 research outputs found

    Modelowanie norm pracochłonności robót zbrojarskich

    No full text
    Construction planning always requires labour productivity estimation. Often, in the case of monolithic construction works, the available catalogues of productivity rates do not provide a reliable assessment. The paper deals with the problem of labour estimation for reinforcement works. An appropriate model of labour prediction problem is being introduced. It includes, between others, staff experience and reinforcement buildability. In the paper it is proposed, that labour requirements can be estimated with aggregated classifiers. The work is a continuation of earlier studies, in which the possibility of using classifier ensembles to predict productivity in monolithic works was investigated.Planowanie rzeczowe i kosztowe każdego przedsięwzięcia budowlanego wymaga analizy nakładów pracy. Od pewnego czasu obserwuje się w polskim budownictwie stopniowy spadek dostępności wysoko kwalifikowanej kadry pracowniczej. Z drugiej strony projekty konstrukcyjne obiektów żelbetowych są coraz bardziej złożone i jednocześnie „odchudzane”. Sprawia to, że prawidłowa ocena pracochłonności robót staje się coraz bardziej istotna. Problemy zaobserwowane na różnych krajowych budowach w przeciągu ostatniego roku stały się inspiracją do przeprowadzenia wstępnych badań w temacie pracochłonności prac zbrojarskich. Praca stanowi kontynuację wcześniejszych badań nad modelowaniem pracochłonności robót wykonywanych w technologii MBB i zaprezentowano w niej możliwość modelowania norm wykonania zbrojenia przy użyciu drzew decyzyjnych (pojedynczych i agregowanych)

    Szacowanie czasu trwania powypadkowej nieobecności w pracy w budownictwie z zastosowaniem drzew decyzyjnych i ich rodzin

    No full text
    Produkcja budowlana jest jedną z najbardziej wypadkowych – zarówno w kraju, jak i na całym świecie, o czym świadczą badania naukowe oraz liczne statystyki i raporty. O ile liczne statystyki powypadkowe są cennym źródłem danych o wypadkach, o tyle znacznie cenniejsze dla zarządzających bezpieczeństwem na budowie i zajmujących się planowaniem robót są proste w interpretacji modele, pozwalające przewidywać zagrożenia i oceniać ich skutki. Badania w tym obszarze prowadzą m.in. [1,2,3,4,5,17,18]. W pracy skoncentrowano się na zagadnieniu długości nieobecności powypadkowej pracownika. Jest ona bowiem nie tylko uciążliwa dla pracodawcy z przyczyn organizacyjnych, ale także świadczy, co potwierdza [4,5], o poziomie bezpieczeństwa na budowie. W artykule skupiono się na analizie możliwości predykcji czasu trwania powypadkowej absencji pracownika przy użyciu drzew decyzyjnych i ich rodzin. Przedmiotem rozważań jest zatem N-elementowy zbiór U obserwacji – tj. odnotowanych wypadków w pracy. Każdą obserwację należącą do zbioru U charakteryzuje wektor [xi1, xi2, …, xiL, yi] tzw. atrybutów obserwacji. Wyróżniamy L atrybutów objaśniających (tzw. predyktorów): X1,…, XL oraz 1 atrybut objaśniany Y. Zmienne xi1, xi2, …, xiL , yi opisują wartości atrybutów i-tej obserwacji. Reprezentację zbioru U można zatem zapisać jako równanie (2.1). Dysponując określonym zbiorem obserwacji U, chcemy znaleźć relację pomiędzy długością powypadkowej absencji pracownika Y a okolicznościami wystąpienia wypadku X=[X1,…, XL] w postaci modelu.Work safety control and analysis of accidents during the construction performance are some of the most important issues of the construction management. The paper focuses on the post-accident absence as an element of the occupational safety management. The occurrence of the post-accident absence of workers can be then treated as an indicator of building performance safety. The ability to estimate its length can also facilitate works planning and scheduling in case of the accident. The paper attempts to answer the question whether it is possible and how to use decision trees and their ensembles to predict the severity of the post-accident absence and which classification algorithm is the most promising to solve the prediction problem. The paper clarifies the model of the prediction problem, introduces 5 different decision tress and different aggregation algorithms in order to build the model. Thanks to the use of aggregation methods it is possible to build classifiers that predict precisely and do not require any initial data treatment, which simplifies the prediction process significantly. To identify the most promising classifier or classifier ensemble the prediction accuracy measures of selected classification algorithms were analyzed. The data to build the model was gathered on national (Polish) construction sites and was taken from literature. Models obtained within simulations can be used to build advisory or safety management systems allowing to detect threats while construction works are being planned or carried out

    Analiza kryteriów decyzyjnych w problemie wyboru systemu deskowań systemowych

    No full text
    The present paper concerns a problem of decisive criteria and their order in formwork selection problem. As the factors affecting the choice of exact form work system have been often discussed in literature, their importance has not been distinctly formulated yet, what hampers aiding formwork selection with MCDA methods that require criteria weights (eg.: SAW, TOPS IS etc.). Therefore, author ran a survey - the decisive criteria were recognized and verified within polls send to various contractors. An analysis of survey results including criteria ordering is a subject of the present elaboration.Wybór deskowania do zastosowania w realizacji monolitycznych robót betonowych jest pierwszym problemem, jaki planista rozwiązuje w zakresie planowania organizacji pracy deskowań na budowie. Wybrany system powinien umożliwiać wykonanie wszystkich elementów konstrukcyjnych obiektu, zapewnić sprawny montaż i demontaż deskowania oraz gwarantować bezpieczeństwo pracowników podczas realizacji robót. Nie bez znaczenia są warunki najmu lub zakupu deskowania i współpracy z dostawcą (lub producentem) w zakresie wsparcia wykonawcy na budowie

    Formwork system selection method and formwork utilization planning for build-in concrete construction performance

    No full text
    Współczesne wykonawstwo monolitycznych konstrukcji betonowych staje się procesem coraz bardziej złożonym - głównie za sprawą stosowania nowoczesnych rozwiązań systemowych i materiałowych wraz z dostosowaną do nich technologią, jak również wskutek potrzeby optymalizacji kosztów wykonania, czasu pracy i innych wskaźników ekonomiczno-technicznych. Przystępując do opracowania kompleksowego projektu robót, planista musi rozwiązać wiele problemów decyzyjnych. Umiejętność ich rozwiązywania umożliwia racjonalną alokację zasobów w czasie i pozwala na ich efektywne wykorzystanie. Celem pracy jest identyfikacja i usystematyzowanie problemów pojawiających się w procesie planowania wykonania monolitycznych konstrukcji betonowych, zaproponowanie metod ich rozwiązywania i określenie czynników wpływających na rozwiązania jakościowe problemów, jak również sformalizowanie kryteriów oceny efektywności organizacji wykonywanych robót betonowych.The concept of optimizing formwork utilization in solid-state building execution is the subject of this paper. The article briefly introduces premises and advisability of optimizing formwork utilization in building performance, as well as divides the optimizing process in two stages: formwork system or systems selection and organizing formwork utilization at the construction site. The ELECTRE Method for qualitative formwork solution choice decision analysis is being proposed, described and exemplified. The issue of opted formwork utilization at the construction site is being resolved within the scheduling method. An appropriate example has been provided

    Technological innovations in construction

    No full text
    Technology and mechanisation of works are two main areas of developments in construction. A series of articles presents the latest achievements in building technology that refer to mechanisation of works. The modernity manifests itself through innovative building machines and equipment, powerful temporary structures, intelligent diagnostic and control devices, automation and robotics involved into various construction works. The authors reviewed the most recent accomplishments of the construction industry that improve efficiency and quality of works, increase safety conditions, expand competitiveness between construction contractors and, thus, elevate building construction techniques

    An Analysis of The Dynamics of Soil Contamination Density in the Opole Province by Natural and Artificial Radionuclides after the Chernobyl Nuclear Power Plant Accident

    No full text
    Wprowadzenie: W wyniku awarii reaktora elektrowni jądrowej w Czarnobylu na Ukrainie w 1986 roku doszło do niekontrolowanego uwolnienia substancji radioaktywnych. Województwo opolskie należy do obszarów, na których nastąpiła największa kumulacja skażenia powierzchniowego izotopami promieniotwórczymi. Deszczowa pogoda panująca na tym obszarze podczas przechodzenia radioaktywnej chmury wpłynęła na zatrzymanie się w komponentach środowiska różnych izotopów promieniotwórczych. Cel: W opracowaniu skupiono uwagę na przedstawieniu dynamiki zmian wartości stężenia powierzchniowego cezu 137Cs w glebie Opolszczyzny na przestrzeni prawie trzydziestu lat od awarii czarnobylskiej. Projekt i metody: Duże znaczenie dla oceny zmian wartości stężenia powierzchniowego 137Cs w glebie z określonego punktu poboru próbek ma stan mikrośrodowiska. Nie może być ono zniekształcone lub zmienione przez działalność człowieka. Istotne jest również to, aby sposób pobierania próbek był ustalony i powtarzalny, a ich przygotowanie do pomiaru w laboratorium odbywało się według ściśle określonych procedur. Po odpowiednim przygotowaniu próbki są poddawane pomiarom spektrometrycznym na detektorze półprzewodnikowym HPGe oraz analizie promieniowania gamma za pomocą oprogramowania Genie-2000. Wyniki: Podczas analizy widm promieniowania gamma w próbkach gleby stwierdzono obecność naturalnych izotopów 40K, 226Ra i 228Ac oraz sztucznych izotopów 134Cs (rejestrowany do 1996 r.) i 137Cs (rejestrowany do dziś). W artykule przedstawiono rezultaty pomiarów stężeń powierzchniowych 137Cs i stężeń naturalnych radionuklidów 40K, 226Ra i 228Ac w glebie woj. opolskiego dla próbek pochodzących z okresu 1988–2014. Wnioski: Zgodnie z przewidywaniami na przestrzeni prawie 30 lat od awarii w Czarnobylu stężenie 137Cs w glebie stopniowo maleje. Jest to związane z rozpadem izotopu oraz jego przenikaniem w głębsze warstwy gleby. Natomiast stężenie radionuklidów naturalnych w badanych miejscowościach utrzymuje się na podobnym poziomie. Wskazana jest kontynuacja pomiarów, w celu sprawdzenia, jak maleje stężenie powierzchniowe 137Cs w glebie i kiedy jego wartość znajdzie się poniżej progu detekcji. Należałoby także wybrać kilka punktów poboru gleby (także na Opolszczyźnie) w celu zbadania, jak 137Cs przeniknął w głębsze warstwy gleby (pobór z warstwy 25 cm).In 1986 there was an accident in the reactor at the Chernobyl Nuclear Power Plant in Ukraine which caused an uncontrolled release of radioactive substances. The Opole province in Poland is one of the areas which suffered the greatest accumulation of surface contamination with radionuclides. As a result of rainy weather in this area during the transition of the radioactive cloud, various radioisotopes remained in the environmental components. Objective: The study focuses on the dynamic changes in the surface concentration of cesium 137Cs in soil samples from the Opole province, which have been measured for nearly thirty years since the Chernobyl disaster. Method: The condition of the microenvironment is very important for the assessment of changes in 137Cs surface concentration for the soil taken from the same sampling point, so the microenvironment cannot be distorted or changed by human activity. The method of sampling must be fixed and repeatable, and the preparation of samples for measurement in the laboratory should be conducted according to strict procedures. After proper preparation, samples are measured spectrometrically on a HPGe semiconductor detector and then an analysis of gamma radiation is done with Genie-2000 software. Results: During the gamma-radiation spectrum analysis of the soil samples, the surface concentration of natural isotopes 40K, 226Ra and 228Ac and of artificial isotopes 134Cs (reported till 1996) and 137Cs (reported to the present) was detected. The article presents the results of 137Cs surface concentration measurements, as well as the concentration of 40K, 226Ra and 228Ac natural radionuclides in the soil of the Opole province from samples measured in the period 1988–2014. Conclusions: As expected, for the nearly 30 years since the failure of the Chernobyl NPP, the concentration of 137Cs in the soil has been gradually decreasing as a result of isotope decay and its penetration into the deeper layers of the soil. On the other hand, the concentration of natural radionuclides is at a similar level for the same sampling points. In the future it will be useful to continue measuring to see how the surface concentration of 137Cs for soil is decreasing and when its value will be below the detection threshold. It would be also good to select several sampling points (also in the Opole province) in order to investigate how 137Cs has penetrated into the deeper layers of the soil (a 25-cm layer)

    Investigation of the Intermediate Layers Located Between Niobium Substrate and Lead Films Destined for Superconducting Photocathodes

    No full text
    The paper presents the recent studies carried out at National Centre for Nuclear Research (NCBJ) focused on improving adhesion between Pb films and Nb substrate. The impact of additional intermediate layers of Ti and Sn on the adhesion properties was also discussed. Structural and microstructural properties of the layers were investigated by using Scanning Electron Microscope (SEM) equipped with Energy Dispersive X-ray Spectroscopy (EDS). Tribological properties of the deposited layers were examined by using a profile measurement gauge and the scratch test techniques. It has been shown that the Pb layer deposited on Ti intermediate layer is characterized by the best properties in terms of smoothness and surface continuity. Apart from the classical tribological properties investigation, we demonstrated much better adhesion of a Pb layer to the Nb substrate covered with an interlayer of Ti or Sn compared to a Pb film deposited directly on Nb. Reported results prove the possibility of improvement of the lead film adhesion parameters and discuss a new development path for further work in this area